2024 Street, Alley, and Utility Improvements

Closed State & local contract opportunity Posted

Solicitation number
2024-02
State
Colorado
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from bidnetdirect.com. Updated .

About this opportunity

The Town of Telluride, located in Summit County, Colorado, is soliciting bids for the 2024 Street, Alley, and Utility Improvements project, a comprehensive municipal infrastructure enhancement initiative. The procurement encompasses seven distinct work items involving street milling, asphalt replacement, and road base improvements across multiple locations including East and West Columbia Avenue, Pandora Block, Town Park, North Maple Street, and North Willow Street. Specific deliverables include milling existing road surfaces, removing and replacing asphalt layers, compacting road base materials, and performing full-depth patches where pavement failures are identified. The bid requires comprehensive documentation including a bid form, bid bond, statement of qualifications, and subcontractor schedule. Bidders will be evaluated based on technical capabilities, performance history, financial resources, and commitment to environmental practices. The procurement timeline includes a bid submission deadline of March 8, 2024 at 3:00 PM local time, with a Notice to Proceed on April 1, 2024, substantial completion targeted for October 18, 2024, and a final contract end date of November 1, 2024.

The Town of Telluride has implemented a local preference policy in vendor selection, which may provide advantages to local or regional contractors. While no specific set-aside designations for disadvantaged enterprises are explicitly mentioned, the bid evaluation will consider the bidder's overall ability, capacity, and skill. The procurement allows for two bid alternates: a project on the 400 Block of Pandora (East Half) and a road widening project on the 600 Block of West Colorado Avenue. Though specific budget ranges are not detailed in the provided documentation, the comprehensive nature of the project suggests a significant municipal infrastructure investment. The Town reserves the right to reject any or all proposals and will award the contract to the most advantageous bidder, considering both price and comprehensive evaluation criteria. Interested contractors must demonstrate technical expertise in municipal road reconstruction, asphalt placement, and road base compaction to be considered for this project.

Opportunity text

The Town of Telluride is seeking Bids for the 2024 Street, Alley and Utility improvements to include the following Work Items: Work Item #1: 500 Blk East Columbia Avenue [Maple to Hemlock]. This portion of the WORK involves milling 2 inches of asphalt, and then placing 2.5 inches of new compacted asphalt (SX75 58-28). Areas with pavement failure following the milling operation will be identified and marked by the Engineer for full depth patch. All millings will be hauled to the wide spot on the Spur. Any asphalt removal with mixed materials will be hauled away. (See Work Item #1 500 Block E Columbia schematic.) Work Item #2: 500 Block West Colorado Avenue [Davis to Townsend] This portion of the WORK involves milling 2 inches of asphalt, and then placing 2 inches of new compacted asphalt (SX75 58-28). Areas with pavement failure following the milling operation will be identified and marked by the Engineer for full depth patch. All millings will be hauled to the wide spot on the Spur. Any asphalt removal with mixed materials will be hauled away. (See Work Item #2 500 Block W Colorado schematic.) Work Item #3: East Colorado Avenue [Pine to Alder]. This portion of the WORK involves milling 2 inches of asphalt, and then placing 2.5 inches of new compacted asphalt (SX75 58-28). Areas with pavement failure following the milling operation will be identified and marked by the Engineer for full depth patch. All millings will be hauled to the wide spot on the Spur. Any asphalt removal with mixed materials will be hauled away. This must be scheduled for the fall. (See Work Item #3 E Colorado [Pine to Alder] schematic.) Work Item #4a: 400 Block Pandora East Half - BID ALTERNATE 1. This portion of the WORK involves milling existing road surface materials and hauling them away for disposal, placing and compacting Class 6 road base, as needed, then furnishing and installing 5 inches of asphalt. (See Work Item #4a 400 Block Pandora East Half (Bid Alternate 1) schematic.) Work Item #4b: 600 Block West Colorado Avenue - Widen Travel Way by 4 feet - BID ALTERNATE 2. This portion of the WORK involves widening the south side of West Colorado Avenue by 4 feet by placing and compacting 6 inches of Class 6 road base or equivalent, or more as needed to level the south edge of the asphalted right of way to a 2% slope, then furnishing and installing 7 inches of asphalt. (See Work Item #4b 600 Block W Colorado Avenue, southside (Bid Alternate 2) schematic.) Section 00010 − 1 Work Item #5: Town Park Asphalt. This portion of the WORK involves removing 10 feet of asphalt and several inches of base west of the existing 8-inch-thick concrete valley pan and replacing it with 6 inches of asphalt patch. East of the valley pan, scarify and remove 6 inches of native material, place back and compact 6 inches of Class 6 road base or equivalent, and place 4 inches of asphalt (SX75-58-28). (See Work Item #5 Town Park schematic.) Work Item #6: 100 Block North Maple Street. This portion of the WORK involves milling 2 inches of asphalt, and then placing 2 inches of new compacted asphalt (SX75 58-28). Areas with pavement failure following the milling operation will be identified and marked by the Engineer for full depth patch. All millings will be hauled to the wide spot on the Spur. Any asphalt removal with mixed materials will be hauled away. (See Work Item #6 100 Block N Maple schematic.) Work Item #7: 100 Blk North Willow Street. This portion of the WORK involves milling existing road surface materials and hauling them away for disposal, placing and compacting Class 6 road base, as needed, then furnishing and installing 5 inches of asphalt. This must be scheduled for the fall.(See Work Item #7 100 Blk N Willow schematic.)