2024-05 ARPA Wastewater Equipment Improvements Contract A Blower Replacements
Closed State & local contract opportunity Posted
- Solicitation number
- PE-73750-NONST-2024-000000010
- State
- Georgia
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
Opportunity details come from ssl.doas.state.ga.us. Updated .
About this opportunity
Paragraph 1:
The City of Tifton, Georgia is seeking sealed bids for the construction of the ARPA Wastewater Equipment Improvements Contract A - Blower Replacements project. The work generally consists of furnishing and installing four multi-stage centrifugal blowers, variable frequency drives, and control panels inside the existing blower building, including all associated concrete, piping, structural work, HVAC, electrical, instrumentation, and SCADA/controls integration with existing equipment. A non-mandatory pre-bid meeting will be held on May 30, 2024 at 2:00 PM, and bids are due by June 14, 2024 at 2:00 PM. Bidders must be licensed by the State of Georgia, and bids shall be accompanied by a bid bond or certified cashier's check in an amount not less than 5% of the base bid. Performance and Payment Bonds, each in an amount equal to 100% of the contract price, will be required of the successful bidder.
Paragraph 2:
This project will be funded using a combination of local funds and ARPA funds. The owner reserves the right to reject any or all bids. There are no set-aside designations or restrictions on the types of organizations that can respond. The incumbent vendor or current contractor is not specified. The project will require integration with the existing wastewater equipment and SCADA/controls systems. The budget range for this contract is not provided in the available information.
Opportunity text
Sealed bids for construction of the project entitled ARPA Wastewater Equipment Improvements Contract A Blower Replacements will be received until Friday, June 14, 2024, at 2:00 PM at the City Manager¿s Office, Tifton City Hall, 130 1st Street E, Tifton, GA 31794 at which time and place they will be publicly opened and read. No bid may be withdrawn after the closing time for the receipt of bids for a period of sixty (60) days. A non-mandatory pre-bid meeting with be held Thursday, May 30, 2024, at 2:00 PM at the City Manager¿s Office, Tifton City Hall, 130 1st Street E, Tifton, GA 31794. Attendance is not required but is strongly encouraged. The work shall generally consist of furnishing all products and performing all labor necessary to install the following (see Plans and Specifications for complete details and description):Installation of four (4) multi-stage centrifugal blowers, variable frequency drives, and control panels inside the existing blower building including all associated concrete; piping, fittings, valves; structural work; HVAC; electrical, instrumentation, and SCADA/controls integration with existing equipment. For additional bid questions contact issuing office, ESG Engineering, Inc. attn. Margaret Hildebrand mhildebrand@esgengineering.com or 478-474-4996 ext. 239.
Files
| File | Type | Posted |
|---|---|---|
| 00100 _ ADVERTISEMENT FOR BIDS (Contract A).doc | DOC document |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity