About this opportunity
City of Bremerton, Washington's Public Works Engineering Division is soliciting statements of qualifications from multidisciplinary consultant teams for preliminary engineering design of the 11th Street Corridor Improvements Project, with submittals due December 1, 2026 at 3:00 PM. The procurement carries a voluntary 10% Small Business Enterprise (SBE) goal, and the consultant's approach to meeting that goal is an evaluation criterion.
The corridor runs between Pacific Avenue and Kitsap Way in three segments. Segment 1 (Warren Avenue to Naval Avenue) covers pavement restoration and ADA ramp upgrades. Segment 2 (Warren Avenue to Pacific Avenue) constructs a community boulevard with multimodal facilities, landscaping, lighting, and stormwater conveyance and treatment. Segment 3 (Kitsap Way to Naval Avenue) covers pavement restoration, ADA upgrades, and intersection safety improvements at Callow Avenue. Pedestrian crossing improvements and utility upgrades will be considered for the corridor. Anticipated disciplines include bicycle/pedestrian design, structural, stormwater, environmental permitting, surveying, traffic, geotechnical, landscape architecture, electrical, and utility coordination. The project is federally funded and subject to Title VI Civil Rights Act compliance.
Design work runs from January 2027 through January 2028, approximately 12 months with an option for extension, and construction is scheduled for 2028. The City reserves the right to retain the successful firm for right-of-way, construction engineering and inspection, and construction management phases.
Evaluation covers the qualifications and experience of the proposed project manager and key personnel, ability to meet schedule, project approach, familiarity with Bremerton, WSDOT, and FHWA standards, and past performance and references, along with the SBE goal approach. Submittals must include a transmittal letter and responses limited to 10 single-sided pages, with 12-point minimum body text and 8-point minimum for charts and graphs. Submit proposals as a PDF no larger than 10 MB by email to vicki.grover@ci.bremerton.wa.us. The solicitation was published in the Kitsap Sun and Daily Journal of Commerce on November 3 and November 10, 2026.
Opportunity text
The work performed by the consultant consists of preparing preliminary engineering (PE) design for 11th Street Corridor between Pacific Avenue and Kitsap Way. The corridor has 3 distinct segments as follows: Segment #1 is from Warren Avenue to Naval Avenue and would consist of pavement restoration and ADA ramp upgrades; Segment #2 is from Warren Avenue to Pacific Avenue and would construct the roadway to a community boulevard (multimodal facilities, landscaping, lighting, stormwater conveyance and treatment); Segment #3 is from Kitsap Way to Naval Avenue and consists of pavement restoration, ADA ramp upgrades and intersection safety improvements at Callow Avenue. Pedestrian crossing improvements and utility upgrades will be considered for the corridor. 10% SBE goal.