11-430884 Cold Plane, RHMA-G, SAMI, Drainage, Curb Ramps, and Electrical, THIS IS A BIM4I PILOT PROJECT
Closed State & local contract opportunity Posted
- Solicitation number
- 11-430884, Fed #ST-X073(159)
- State
- California
- Responses due
Opportunity facts
- Jurisdictions
- Point of contact
-
- Office Engineer occa@dot.ca.gov (916) 227-6299
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The California Department of Transportation is soliciting bids for cold-plane pavement removal, RHMA-G overlay, SAMI installation, drainage improvements, ADA-compliant curb ramp construction, and electrical work in San Diego County and San Diego City under a BIM4I pilot project, with proposals due October 22, 2026. This is a Building Information Modeling for Infrastructure pilot designation, indicating enhanced documentation, modeling, and coordination requirements beyond standard construction specifications.
The scope requires cold planing of existing pavement, installation of rubberized hot mix asphalt (RHMA-G) with stress-absorbing membrane interlayer (SAMI), drainage system improvements, ADA-compliant curb ramp construction, and electrical work. Work must comply with California Department of Transportation standards and incorporate sustainable practices. The contractor must complete all work excluding permanent erosion control establishment within 180 working days, with full project completion including permanent erosion control establishment within 430 working days; permanent erosion control establishment work specifically must be completed within 250 working days from project initiation.
The source does not provide an estimated contract value, evaluation criteria, incumbent contractor information, question deadline, pre-bid meeting date, or other competitive timeline details. The attached scope-of-work document establishes technical specifications and quality standards for pavement rehabilitation but does not include bid submission procedures or award information.
Opportunity text
General work description: Cold plane, RHMA-G, SAMI, drainage, curb ramps, and electrical. Complete the work, excluding permanent erosion control establishment work, within 180 working days. Complete the work, including permanent erosion control establishment work, within 430 working days. Complete the permanent erosion control establishment work within 250 working days.