2-CSP No. 901-27 Constructions Plans 1.0 MG Glenville Elevated Storage Tank Rehab.pdf

PDF 7 MB Posted

Attached to
1.0 MG Glenville Elevated Storage Tank Rehabilitation Project
Solicitation number
901-27
Issued by
Dallas County, Texas

About this file

Construction Plans Summary: 1.0 MG Glenville Elevated Water Storage Tank Rehabilitation

This document comprises the construction plans (CSP No. 901-27) prepared by the City of Richardson, Texas for the rehabilitation of an existing 1.0 megagallon elevated water storage tank located at 1260 Columbia Drive, Richardson, Texas 75081. The project scope encompasses removal and replacement of interior and exterior protective coating systems, application of City logos, structural repairs to support legs and components, replacement of safety equipment and appurtenances, and miscellaneous rehabilitation work. The construction plans include 13 sheets detailing site plans, grading, erosion control, tank elevations, structural details, and civil details. The estimated quantities schedule lists 39 base bid items and 2 alternate bid items, including mobilization, security fencing, traffic control, site restoration with Bermuda block sod (1,500 square yards), containment systems for coating removal, interior and exterior coating applications, roof repairs, ladder replacements, valve modifications, and confined space entry placards. The plans reference technical specifications and appendices containing inspection reports from Steel Inspectors of Texas, Inc. and Tank Industry Consultants, Inc., as well as the City's brand guidelines for logo applications.

The construction plans establish comprehensive requirements for contractor performance, including detailed general notes, site-specific construction notes, and erosion and sedimentation control protocols. The contractor is responsible for all costs associated with testing, chlorination, disinfection, flushing, traffic control, utility coordination, environmental compliance, and site restoration at no additional cost to the City. The plans require the contractor to obtain all necessary permits, coordinate utility shutdowns with 48-hour advance notice, contact Texas 811 at least 72 hours prior to construction, submit pre-mobilization site documentation for City approval, and maintain daily erosion control inspections. The City's estimated project cost is approximately $2,180,000, with funding sourcing not specified in the construction plans document.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C

IV

IL

.0 M

G G

LE

N

V

IL

LE

E

LE

V

A

TE

D W

A

TE

R S

TO

R

A G

E T

A N

K R

E H

A B

IL

IT

A

TI

O N

N

O V

E M

B E

R

SHEET INDEX

DESCRIPTIONSHEET NO.

NOVEMBER 2026

1 G-01 COVER SHEET

2 G-02 GENERAL NOTES

3 G-03 ESTIMATED QUANTITIES

4 G-04 AERIAL IMAGE

5 C-01 EXISTING SITE PLAN

6 C-02 EROSION CONTROL PLAN

7 C-03 PROPOSED SITE PLAN

8 C-04 GRADING PLAN

9 C-05 TANK PLAN AND ELEVATION

10 C-06 TANK PHOTOS

11 C-07 CIVIL DETAILS

12 S-01 STRUCTURAL DETAILS 1 OF 2

13 S-02 STRUCTURAL DETAILS 2 OF 2

CITY OF RICHARDSON

CONSTRUCTION PLANS

FOR

1.0 MG GLENVILLE ELEVATED WATER

STORAGE TANK REHABILITATION

CSP NO. 901-27

PROJECT LOCATION

1260 Columbia Dr, Richardson, TX 75081

LOCATION MAP

SCALE: 1" = 2000'

MAYOR

AMIR OMAR

MAYOR PRO TEM

KEN HUTCHENRIDER

CITY COUNCIL

CURTIS DORIAN JENNIFER JUSTICE

DANIEL BURDETTE JOE CORCORAN

AREFIN SHAMSUL

CITY MANAGER

DON MAGNER

CHIEF OPERATING OFFICER

KENT PFEIL

ASSISTANT CITY MANAGERS

MICHAELA DOLLAR

CHARLES GOFF

DIRECTOR OF ENGINEERING

KATIE BARRON,P.E.

SENIOR PROJECT ENGINEER

MOSES OGOLLA, P.E.

DWG. NO.

11-17-2026

1.

M G

G

LE

N V

IL

LE

E

LE

V A

TE

D

W A

TE

R

S

TO

R A

G E

T A

N K

R E

H A

B

IL

IT

A

TI

O

N

G E

N E

R A

L N

O

TE

S

G-02

LEGEND

EXISTING FEATURES

SANITARY SEWER MANHOLE

FIRE HYDRANT

WATER VALVE

GAS METER

WATER METER

BUTTERFLY VALVE (BFV)

MOTOR OPERATED VALVE (MOV)

CHECK VALVE (CKV)

TELEPHONE RISER

POWER POLE

MAIL BOX

IRON PIN

TRAVERSE POINT

SIGN

FENCE CORNER

LIGHT POLE

GUY WIRE ANCHOR

TREE

BUSH

TRANSMISSION TOWER

GAS LINE

OVERHEAD ELECTRIC LINE

UNDERGROUND ELECTRIC LINE

WATER LINE (SIZE AS NOTED)

SEWER LINE (SIZE AS NOTED)

FLOW LINE DITCH

EDGE ASPHALT PAVEMENT

CHAIN LINK FENCE

GENERAL NOTES

1. ALL WORK SHALL CONFORM TO THE CONSTRUCTION STANDARDS OF THE CITY OF RICHARDSON AND SHALL BE IN ACCORDANCE WITH THE PLANS, SPECIFICATIONS, AND CONTRACT DOCUMENTS FOR THIS

PROJECT, AND THE NORTH CENTRAL TEXAS COUNCIL OF GOVERNMENTS (NCTCOG) STANDARD

SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION, 5TH EDITION.

2. IN CASE OF CONFLICT OR CONTRADICTIONS BETWEEN THE ABOVE STANDARDS THE FOLLOWING

HIERARCHY SHALL PRESIDE: PLANS, SPECIFICATIONS, AND CONTRACT DOCUMENTS FOR THIS

PROJECT, CITY OF RICHARDSON CONSTRUCTION STANDARD DETAILS, THE NORTH CENTRAL TEXAS

COUNCIL OF GOVERNMENTS (NCTCOG) STANDARD SPECIFICATIONS FOR PUBLIC WORKS

CONSTRUCTION, 5TH EDITION.

3. THE APPROXIMATE LOCATION OF EXISTING UTILITIES AND OTHER UNDERGROUND FACILITIES ARE GIVEN FOR REFERENCE ONLY AND ARE TAKEN FROM PUBLIC RECORDS. BEFORE COMMENCING THE WORK ON THIS CONTRACT, THE CONTRACTOR SHALL VERIFY BY FIELD INVESTIGATION THE ACTUAL LOCATIONS OF ALL UTILITY FACILITIES WITHIN AND ADJACENT TO THE LIMITS OF THE WORK THAT MAY BE AFFECTED BY THE WORK. IT IS THE CONTRACTOR'S RESPONSIBILITY TO MAKE ARRANGEMENTS WITH THE OWNERS OF SUCH UTILITY FACILITIES PRIOR TO WORKING IN THE AREA TO CONFIRM THEIR EXACT LOCATION AND TO DETERMINE WHETHER ANY ADDITIONAL FACILITIES OTHER THAN THOSE

SHOWN ON THE PLANS MAY BE PRESENT. THE CONTRACTOR SHALL PRESERVE AND PROTECT ALL

UNDERGROUND FACILITIES. CONFLICTS WHICH RESULT DUE TO NEGLIGENCE BY THE CONTRACTOR TO

LOCATE, HORIZONTALLY AND VERTICALLY, EXISTING UTILITIES WHICH ARE SHOWN ON THE

CONSTRUCTION DRAWINGS, OR WHICH THE CONTRACTOR HAS BEEN GIVEN NOTICE OR HAS

KNOWLEDGE, SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR. THE COST OF REMEDIAL WORK, REMOVAL OF PORTIONS OF THE WORK OR EXTENSIVE DESIGN CHANGES OCCASIONED BY THE FAILURE OF THE CONTRACTOR TO VERIFY THE LOCATION OF EXISTING UTILITIES AS DESCRIBED

ABOVE SHALL BE BORNE BY THE CONTRACTOR.

4. WHERE EXISTING UTILITIES OR SERVICE LINES ARE CUT, BROKEN OR DAMAGED, THE CONTRACTOR SHALL REPLACE OR REPAIR THE UTILITIES OR SERVICE LINES WITH THE CURRENT STANDARDS FOR MATERIAL AND CONSTRUCTION, OR BETTER, AT HIS OWN COST AND EXPENSE. THE CONTRACTOR

SHALL IMMEDIATELY NOTIFY THE CITY AT ONCE OF ANY CONFLICTS.

5. CONTRACTOR SHALL NOT STORE SPOIL IN DRAINAGE WAYS DURING CONSTRUCTION. THROUGHOUT CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR EROSION CONTROL PERMITTING & THE IMPLEMENTATION AND MAINTENANCE OF EROSION CONTROL FOR THE PROJECT. IN THE EVENT

THAT SIGNIFICANT EROSION OCCURS AS A RESULT OF CONSTRUCTION THE CONTRACTOR SHALL

RESTORE TO ORIGINAL CONDITION OR IMPROVE THE ERODED AREA AS SOON AS POSSIBLE.

6. THE CONTRACTOR SHALL RESTORE ALL AREAS DISTURBED BY CONSTRUCTION TO ORIGINAL

CONDITION OR BETTER. RESTORED AREAS INCLUDE, BUT ARE NOT LIMITED TO TRENCH BACKFILL, SIDE

SLOPES, FENCES, CULVERT PIPES, DRAINAGE DITCHES, IRRIGATION, SODDING OR SEEDING,

DRIVEWAYS, PRIVATE YARDS, AND ROADWAYS.

7. NO CHANGES IN THE APPROVED CONSTRUCTION PLANS SHALL OCCUR UNLESS APPROVED BY THE

CITY'S PROJECT ENGINEER OR ENGINEER OF RECORD (EOR).

8. ALL FRANCHISE UTILITIES SHALL BE RELOCATED AS NEEDED PRIOR TO PUBLIC IMPROVEMENTS BY THE

CITY OF RICHARDSON.

9. CONTRACTOR SHALL PROVIDE ACCESS TO PRIVATE DRIVEWAYS AT ALL TIMES.

10. THE CONTRACTOR SHALL SUBMIT AN UPDATED AND DETAILED CONSTRUCTION SCHEDULE WITH EACH

MONTHLY INVOICE.

11. THE CONTRACTOR SHALL SUBMIT A TRAFFIC CONTROL PLAN FOR CITY APPROVAL PRIOR TO

MOBILIZATION.

12. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL NECESSARY PERMITS AND APPROVALS

NECESSARY FOR CONSTRUCTION.

13. THE CONTRACTOR SHALL NOTIFY UTILITY COMPANIES A MINIMUM OF 48 HOURS PRIOR TO CROSSING

THEIR LINES TO NOTIFY THEM OF UPCOMING CONSTRUCTION.

14. THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGE TO THE EXISTING PUBLIC OR PRIVATE UTILITY LINES, INCLUDING BUT NOT LIMITED TO WATER LINES, ELECTRICAL AND STORM

SEWERS, DURING CONSTRUCTION.

15. CONTRACTOR IS TO CONTACT TEXAS 811 FOR LOCATION OF EXISTING FACILITIES THAT MAY NOT BE

SHOWN ON THE PLANS AT LEAST 72 OURS PRIOR TO COMMENCEMENT OF ANY CONSTRUCTION

ACTIVITIES.

16. CONTRACTOR, WITH THE ASSISTANCE OF THE ENGINEER IF NECESSARY, SHALL OBTAIN ALL

APPLICABLE CITY, STATE AND FEDERAL PERMITS.

17. CONTRACTOR SHALL COMPLY WITH ALL OSHA REGULATIONS, TCEQ REGULATIONS, AND ALL OTHER

APPLICABLE TEXAS STATE LAWS.

18. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING, MAINTAINING AND RESTORING ALL

EXISTING FACILITIES AFFECTED BY THIS CONSTRUCTION PROJECT TO EXISTING OR BETTER

CONDITION, UNLESS OTHERWISE NOTED, AT NO ADDITIONAL COST TO THE OWNER.

19. DURING CONSTRUCTION, THE CONTRACTOR SHALL MAINTAIN ADEQUATE DRAINAGE AND SAFE ACCESS

TO ADJACENT PROPERTIES, REGARDLESS OF THE WEATHER CONDITIONS.

20. CONTRACTOR SHALL FIELD VERIFY DIMENSIONS AND INFORM ENGINEER AND CITY VIA RFI OF ANY

DISCREPANCIES FROM PLANS THAT COULD RESULT IN CHANGES TO THE WORK.

21. CONTRACTOR SHALL PERFORM WORK IN A MANNER TO LIMIT NOISE FROM CONSTRUCTION TO ACCEPTABLE LEVELS FOR PROPERTIES ADJACENT TO THE CONSTRUCTION AREA AS REQUIRED UNDER

THE CITY OF RICHARDSON NOISE ORDINANCE.

22. ALL PIPE ABOVE GROUND SHALL BE NEW STAINLESS-STEEL PIPE, CEMENT LINED UNLESS SHOWN OTHERWISE. ALL STEEL PIPE, VALVES AND FITTINGS (ABOVE GROUND), SHALL BE PAINTED IN ACCORDANCE WITH THE APPLICABLE PAINTING SPECIFICATIONS. ALL PIPE, FITTINGS, VALVES, AND APPURTENANCES SHALL MEET THE MINIMUM REQUIREMENTS OF THE TCEQ, THE AWWA, THE FDA AND

THE NSF FOR POTABLE WATER.

23. THE CONTRACTOR SHALL INCLUDE IN HIS BID PRICE, ALL NECESSARY EQUIPMENT, MACHINERY, AND CONSTRUCTION TECHNIQUES REQUIRED TO REHABILITATE THE FACILITY WITHIN THE SPECIFIED

CONTRACT TIME.

24. LANES OF TRAFFIC SHALL BE MAINTAINED AT ALL TIMES. ALL TRAFFIC CONTROL SIGNS, BARRICADES, AND FLAGGING SHALL BE IN ACCORDANCE WITH THE TEXAS MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES, CURRENT ADDITION. CONTRACTOR SHALL BE RESPONSIBLE FOR TRAFFIC CONTROL. THE COST OF ANY REQUIRED TRAFFIC CONTROL PROVISIONS SHALL BE INCIDENTAL TO THE PROJECT.

25. CONTRACTOR WILL FURNISH ALL TOOLS, LABOR AND EQUIPMENT REQUIRED FOR CONDUCTING PRESSURE TESTING (LEAKAGE TESTS) OF ALL WATER LINES AND ALL APPLICABLE TESTS FOR THE

ELEVATED WATER STORAGE TANK. THE CONTRACTOR WILL CONDUCT ALL TESTS IN ACCORDANCE

WITH THE APPLICABLE SPECIFICATIONS. THE OWNER OR THE OWNER'S REPRESENTATIVE WILL

OBSERVE AND DOCUMENT SAID TESTS. ALL TESTS AND TESTING EQUIPMENT WILL BE AT THE EXPENSE OF THE CONTRACTOR. THE CONTRACTOR WILL INCLUDE THESE COSTS IN HIS BID PRICE FOR THE PROJECT. ALL MATERIAL TESTS OF ASPHALT, SUBGRADE, LIME CONTENT, CEMENT CONTENT, OR DENSITIES THAT IS REQUIRED TO COMPLETE THE PROJECT SHALL BE FURNISHED AND PAID FOR BY THE CITY OF RICHARDSON, AND SHALL BE MADE IN ACCORDANCE WITH THE LATEST METHODS OF THE

AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM).

26. THE CONTRACTOR WILL FURNISH ALL TOOLS, LABOR AND EQUIPMENT REQUIRED FOR CHLORINATING, DISINFECTING, AND FLUSHING OF THE WATER TANK AND ALL WATER LINES. THE OWNER OR THE

OWNER'S REPRESENTATIVES WILL COLLECT SAMPLES FOR BACTERIOLOGICAL TESTING.

27. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PAINTING AND PROTECTIVE COATING.

28. THE CONTRACTOR SHALL INCLUDE IN THEIR BID PRICE COORDINATION WITH ANY UTILITY SERVICES

THAT MAY BE AFFECTED BY WORK DONE ON SITE.

29. SURPLUS MATERIAL NOT REQUIRED FOR OTHER PARTS OF THE WORK OR ARE NOT OTHERWISE SPECIFICALLY COVERED BY THE DRAWINGS OR SPECIFICATIONS SHALL BECOME THE RESPONSIBILITY

OF THE CONTRACTOR UNLESS OTHERWISE DIRECTED BY THE CITY. THE COST OF REMOVAL OF

SURPLUS MATERIAL IS NOT A PAY ITEM. IT SHALL BE SUBSIDIARY TO ALL OTHER BID ITEMS.

30. THE CONTRACTOR SHALL RESTORE ALL AREAS DISTURBED BY CONSTRUCTION TO ORIGINAL

CONDITION OR BETTER. RESTORED AREAS INCLUDE, BUT ARE NOT LIMITED TO TRENCH BACKFILL, SIDE SLOPES, FENCES, CULVERT PIPES, DRAINAGE DITCHES, IRRIGATION, SODDING OR SEEDING, DRIVEWAYS, PRIVATE YARDS AND ROADWAYS.

31. THE CONTRACTOR IS RESPONSIBLE FOR RESTORATION OF ANY FENCES, GATES OR OTHER

STRUCTURES DISTURBED BY THE CONTRACTOR'S WORK.

32. CONTRACTOR TO REFER TO THE STEEL INSPECTORS OF TEXAS, INC. INSPECTION REPORT INCLUDED

IN APPENDIX A OF THE CONTRACT DOCUMENTS, AND THE TANK INDUSTRY CONSULTANTS, INC.

INSPECTION REPORT INCLUDED IN APPENDIX B OF THE CONTRACT DOCUMENTS, FOR DETAILS

REGARDING TANK CONDITION AND LIMITATIONS.

33. ADDITIONAL TESTING TO DETERMINE THE AMOUNT OF LEACHABLE CONTAMINANTS PRESENT IN THE SPENT CLEANING DEBRIS SHALL BE PERFORMED FOLLOWING CLEANING OPERATIONS AT THE TIME OF REPAINTING. THIS TESTING SHALL CONFORM TO ALL FEDERAL, STATE AND LOCAL REGULATIONS. THE COST OF THIS TESTING SHALL BE SUBSIDIARY TO THE TANK EXTERIOR COATING BID ITEM (BID ITEM NO.

11) OR THE TANK INTERIOR COATING BID ITEMS (BID ITEM NOS. 12 AND 13), DEPENDING UPON THE

LOCATION WHERE THE SPENT CLEANING DEBRIS WAS USED TO REMOVE THE EXISTING COATING

MATERIAL. REFER TO TECHNICAL SPECIFICATION SECTION 13 50 00 - "REMOVAL OF HEAVY METAL

CONTAMINATED PAINT" FOR FURTHER DETAIL.

34. CONTRACTOR SHALL VISIT THE SITE PRIOR TO MOBILIZATION AND DOCUMENT THE ENTIRE SITE VIA PHOTOS AND/OR VIDEO. THIS PHOTO/VIDEO SHALL BE SUBMITTED TO THE CITY FOR REVIEW PRIOR TO MOBILIZATION. THE CITY WILL REVIEW THE PHOTO/VIDEO AND NOTIFY THE CONTRACTOR ONCE THE

PHOTO/VIDEO IS SATISFACTORY SO THAT CONTRACTOR MOBILIZATION MAY BEGIN.

35. UNLESS OTHERWISE PROVIDED IN THE CONTRACT OR BID PROPOSAL AS A SEPARATE BID ITEM, NO SEPARATE PAY SHALL BE MADE FOR WORK SPECIFIED IN THE CONTRACT DOCUMENTS AND FOR WHICH NO PAY ITEM IS INDICATED, BUT SUCH WORK SHALL BE CONSIDERED AS INCIDENTAL WORK AND THE COST THEREOF SHALL BE INCLUDED IN THE CONTRACT PAY ITEMS PROVIDED IN THE PROPOSAL AND

THE CONTRACT.

SITE SPECIFIC CONSTRUCTION NOTES

1. PROVIDE PROTECTIVE COATINGS FOR ALL PIPING AND VALVES IN ACCORDANCE WITH SECTION

09-97-13 OF THE PROJECT SPECIFICATIONS.

2. HAND DIG AS REQUIRED AROUND EXISTING UTILITIES.

3. THE CONTRACTOR SHALL SCHEDULE ALL SHUT-DOWNS A MINIMUM OF 48 HOURS IN ADVANCE. ALL

SHUT-DOWNS SHALL BE APPROVED BY AND COORDINATED WITH THE OWNER.

4. CONTRACTOR TO PROTECT AREAS NOT BEING BLASTED FROM BLAST MATERIAL DEFLECTION.

DAMAGE FROM BLAST DEFLECTION SHALL BE CORRECTED BY THE CONTRACTOR AT NO COST TO THE

OWNER.

5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DISPOSAL OF THE DEMOLISHED EQUIPMENT IN

ACCORDANCE WITH LOCAL AND FEDERAL REGULATIONS AND OWNER'S REQUIREMENTS.

6. PROVIDE SAFETY LABELING AS PER OSHA STANDARDS FOR CONFINED SPACE ENTRYWAYS ON THE

ROOF HATCH AND SHELL MANWAYS.

7. CONTRACTOR TO DISPOSE OF THE EXISTING EQUIPMENT AND MATERIAL IN ACCORDANCE WITH THE

CONTRACT DOCUMENTS.

EROSION AND SEDIMENTATION CONTROL NOTES

1. PRIOR TO START OF CONSTRUCTION, CONTRACTOR SHALL INSTALL EROSION AND SEDIMENTATION

CONTROLS AT LOCATION SHOWN ON PLANS.

2. CONTRACTOR SHALL INSPECT ALL EROSION AND SEDIMENTATION CONTROL SYSTEMS SPECIFIED

HEREIN, AT A MINIMUM OF ONCE EVERY WORKING DAY.

3. CONTRACTOR SHALL MAINTAIN, REPAIR AND/OR REPLACE DAMAGED EROSION AND SEDIMENTATION

CONTROL SYSTEM THROUGHOUT THE DURATION OF THE CONTRACT. (NO SEPARATE PAY)

4. CONTRACTOR SHALL PROVIDE PROTECTED STORAGE AREAS FOR CHEMICALS, PAINTS, SOLVENTS, FERTILIZERS, AND OTHER POTENTIALLY TOXIC MATERIALS.

5. CONTRACTOR SHALL LOCATE FUEL/MATERIAL STORAGE AREAS AWAY FROM STORM WATER

CONVEYANCE SYSTEMS. CONTRACTOR SHALL USE SILT FENCING, HAY BALES, OR BERMS AROUND

FUEL STORAGE AREAS. (NO SEPARATE PAY)

6. CONTRACTOR SHALL ADVISE OWNER IMMEDIATELY, VERBALLY, AND IN WRITING, OF ANY FUEL OR

TOXIC MATERIAL SPILLS ONTO THE PROJECT/CONSTRUCTION AREA AND THE ACTION TAKEN TO

REMEDY THE PROBLEM.

7. CONTRACTOR IS RESPONSIBLE FOR DISPOSING OF HIS FUELS, MATERIALS, AND CONTAMINATED

EXCAVATIONS IN A LEGALLY APPROVED MANNER. (NO SEPARATE PAY)

8. CONTRACTOR IS RESPONSIBLE FOR COMPLYING WITH ALL APPLICABLE ENVIRONMENTAL LAWS.

9. CONTRACTOR IS RESPONSIBLE FOR PROVIDING ADEQUATELY MAINTAINED SANITARY FACILITIES.

10. AT COMPLETION OF THE CONTRACT, OWNER AND/OR OWNER'S REPRESENTATIVE SHALL EXAMINE

EROSION AND SEDIMENTATION CONTROL SYSTEM BEFORE RELIEVING CONTRACTOR OF HIS

MAINTENANCE RESPONSIBILITIES.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR STREET CLEANING, ON A DAILY BASIS, ALL MUD AND DIRT

DEPOSITED ON THE EXISTING PAVEMENT DUE TO HIS CONSTRUCTION ACTIVITY.

12. CONTRACTOR SHALL IMPLEMENT INLET PROTECTION DEVICES AND REINFORCED FILTER FABRIC BARRIER ALONG ROAD AND SIDE DITCHES AT LOCATION SHOWN ON THE EROSION CONTROL PLANS TO KEEP SILT AND OR EXCAVATED MATERIALS FROM ENTERING INTO THE STORM WATER INLETS AND

DITCHES EVENTUALLY POLLUTING THE RECEIVING STORM.

13. DURING THE EXCAVATION PHASE OF THE PROJECT, CONTRACTOR SHALL SCHEDULE THE WORK SO THAT EXCAVATION MATERIAL CAN BE QUICKLY HAULED AWAY FROM THE SITE AND TO PREVENT IT

FROM STAYING UNCOLLECTED ON THE EXISTING PAVEMENT. ANY LOOSE EXCAVATED MATERIAL

WHICH FALLS BACK ON PAVEMENTS OR DRIVEWAYS SHALL BE SWEPT BACK INTO THE EXCAVATED

AREA.

14. CONTRACTOR SHALL CLEAN UP THE EXISTING STREET INTERSECTIONS AND DRIVEWAYS DAILY, AS NECESSARY, TO REMOVE ANY EXCESS MUD, SILT OR ROCK TRACKED FROM THE EXCAVATED AREA.

15. CONTRACTOR SHALL FOLLOW GOOD HOUSEKEEPING PRACTICES DURING THE CONSTRUCTION OF THE

PROJECT, ALWAYS CLEANING UP DIRT AND LOOSE MATERIAL AS CONSTRUCTION PROGRESSES.

16. CONTRACTOR TO INSPECT AND MAINTAIN THE AREAS LISTED BELOW EVERY WORKING DAY:

o DISTURBED AREAS OF THE CONSTRUCTION SITE THAT HAVE NOT BEEN FINALLY STABILIZED.

o AREAS USED FOR STORAGE OF MATERIALS THAT ARE EXPOSED TO PRECIPITATION.

o STRUCTURAL CONTROL MEASURES.

o LOCATIONS WHERE VEHICLES ENTER OR EXIT THE SITE.

17. CONTRACTOR TO BE RESPONSIBLE TO MAINTAIN EXISTING DITCHES AND OR CULVERTS FOR

UNOBSTRUCTED DRAINAGE AT ALL TIMES. WHERE SODDING IS DISTURBED BY EXCAVATION ON

BACKFILLING OPERATIONS, SUCH AREAS SHALL BE REPLACED BY SEEDING OR SODDING. SLOPES 4:1

OR STEEPER SHALL BE REPLACED BY BLOCK SODDING.

18. FILTER FABRIC TO BE CLEANED OR REPLACED WHEN IT CEASES TO FUNCTION PROPERLY OR AS

DIRECTED BY THE ENGINEER AND/OR INSPECTOR.

19. CONTRACTOR MAY SUBMIT PLANS FOR ALTERNATE METHODS OF PROTECTION. THESE ALTERNATE

METHODS MUST BE APPROVED BY THE ENGINEER PRIOR TO USE IN THE FIELD.

PROPOSED FEATURES

NOTE: NOT EVERY LEGEND FEATURE IS USED ON EVERY SITE PLAN.

-1

7-

M G

G

LE

N V

IL

LE

E

LE

V A

TE

D

W A

TE

R

S

TO

R A

G E

T A

N K

R E

H A

B

IL

IT

A

TI

O

N

E S

TI

M

A

TE

D Q

U A

N

TI

TI

E

S

G-03

ESTIMATED QUANTITY SCHEDULE

Item No.

Quantity Unit Description

BASE BID

Item No.

Quantity Unit Description

BASE BID

1 1 LS Mobilization 22 1 LS Repair / Retrofitting Existing Catwalk Railing

2 400 LF

Furnish and Install Construction Staging Area Security Fence, With Privacy Screening Material 23 100 LF

Repair Handrail in Locations With Gap Larger Than 0.25" Between Roof and Toe Plate to Reduce Gap

3 1 LS Barricades, Traffic Control, Protection of Public 24 10 EA Foundation Preparation and Surface Coating - Column Legs

4 350 LF 4" Wide Solid White Parking Space Striping 25 1 LS Foundation Preparation and Surface Coating - Center Column

5 1 EA Project Sign 26 1 LS Install Self-closing gate at Top Platform Safety Railling

6 400 LF Silt Fence for Erosion Control 27 1 EA Install Safety Climb Device to Existing Cone Ladder

7 1 LS Provide Site Grading Improvements 28 1 LS Remove and Replace Interior Wet Ladder

8 1500 SY Bermuda Block Sod and Site Restoration 29 1 EA Remove and Replace Safety-Climb Rail at Interior Wet Ladder

9 1 LS

Remove and dispose of Heavy Metal Coating Material in accordance with Project Specifications and Federal, State, and Local Requirements

30 1 LS Repair and recoat valve vault access ladder

10 1 LS

Containment System for Exterior Coating Removal and Application for 1,000,000 gallon elevated storage tank 31 1 LS Replace valve vault vent screen

11 1 LS Paint Exterior coating system for 1.0 MG elevated storage tank 32 1 LS Modify overflow piping and replace flap-valve

12 1 LS

Paint Interior coating system (Wet) for 1.0 MG elevated storage tank 33 1 LS Inlet / Outlet Pressure Gauge

13 1 LS

Paint Interior coating system (Dry) for 1.0 MG elevated storage tank 34 4 EA Furnish & Install "CONFINED SPACE ENTRY" placards

14 10 GAL Surface Filler 35 1 LS Adjust Conduits / Coaxial Cable at Ladder Locations

15 1 LS Paint Three City Logos 36 1 LS Remove and Re-Install and Calibrate Per Manufacturer's Recommendations Existing Cathodic Protection System

16 1 LS Remove and dispose of dirt and other material from inside of tank bowl 37 1 LS Replace FAA obstruction lighting in place

17 1000 SI Metal repair for corrosion or pitted areas as required to meet NACE standards 38 1 LS Misc Electrical Ajustments

18 2000 LB

Remove and Replace roof beams or rafters that are pitted beyond repair 39 100000 EA Construction Contingency Allowance (authorized for use by City only)

19 5 EA Reuse existing rafters to be reconstructed at original locations in accordance with structural details ADD ALTERNATE BID ITEMS

20 25 LF Misc Welding Repairs #2-1 1 LS Remove existing 20" MOV and replace with 20" electronic interface and altitude control valve in valve vault

21 5 EA

Repair or replace corroded nuts on tank support legs with greater than 10% material loss #3-1 1 LS

Remove, replace in kind, and Calibrate Per Manufacturer's Recommendations Cathodic Protection System

-1

7-

M G

G

LE

N V

IL

LE

E

LE

V A

TE

D

W A

TE

R

S

TO

R A

G E

T A

N K

R E

H A

B

IL

IT

A

TI

O

N

A E

R

IA

L

IM

A G

E

G-04

( IN FEET )

1 INCH = FT

0 4020

N G

LE

N

V

IL

LE

D

R

COLUMBIA DR

LOT 1, BLOCK 1

RICHARDSON SERVICE

CENTER ADDITION

INST. 201800271316

P.R.D.C.T.

CITY OF RICHARDSON

VOL. 296, 203

D.R.D.C.T.

T.P.&L. ELECTRIC

EASEMENT

INST. 196400304440

D.R.D.C.T.

GLENVILLE

EST

-1

7-

M G

G

LE

N V

IL

LE

E

LE

V A

TE

D

W A

TE

R

S

TO

R A

G E

T A

N K

R E

H A

B

IL

IT

A

TI

O

N

E X

IS

TI

N G

S

IT

E P

LA

N

C-01

( IN FEET )

1 INCH = FT

0 2010

N G

LE

N

V

IL

LE

D

R

COLUMBIA DR

CAUTION!

EXISTING OVERHEAD ELECTRIC

LINES IN THIS AREA

CAUTION!

EXISTING OVERHEAD ELECTRIC

LINES IN THIS AREA

EXIST UTILITY

CABINET AREA

EXIST 20"

WATER LINE

EXIST SCADA

BUILDING

EXIST TOWER

PEDESTAL

EXIST TANK

SUPPORT (TYP.)

EXIST 14"

WATER LINE

EXIST 20" MOV

EXIST 14" CKV

PROPERTY LINE

ELECTRICAL

EASEMENT LINE

EXIST 20" BFV

EXIST

ACCESS GATE

-1

7-

M G

G

LE

N V

IL

LE

E

LE

V A

TE

D

W A

TE

R

S

TO

R A

G E

T A

N K

R E

H A

B

IL

IT

A

TI

O

N

SCALE: N.T.S.1 SILT FENCE

SCALE: N.T.S.2 STABILIZED CONSTRUCTION ENTRANCE

E R

O S

IO

N

C O

N

TR

O L

P

LA

N

C-02

( IN FEET )

1 INCH = FT

0 105

PROPOSED

SILT FENCE

SUGGESTED CONSTRUCTION

ENTRANCE LOCATION

(SEE 2/C-02)

-1

7-

M G

G

LE

N V

IL

LE

E

LE

V A

TE

D

W A

TE

R

S

TO

R A

G E

T A

N K

R E

H A

B

IL

IT

A

TI

O

N

P R

O P

O S

E D

S

IT

E P

LA

N

C-03

( IN FEET )

1 INCH = FT

0 105

NOTES:

1. CONTRACTOR SHALL KEEP THE SITE AND

SURROUNDING AREAS, INCLUDING THE PARKING

LOT, CLEAN OF ALL TRASH AND DEBRIS.

CONTRACTOR IS RESPONSIBLE FOR DISPOSING

OF ALL TRASH AND DEBRIS IN A LEGAL MANNER.

2. CONTRACTOR SHALL COORDINATE PARKING

AREAS FOR PERSONNEL WITH CITY. CONTRACTOR

PERSONNEL SHALL NOT PARK IN AREAS THAT

BLOCK FIRE LANES OR ANY OTHER EMERGENCY

ACCESS. EXISTING VALVES AND HANDHOLD

COVERS SHALL REMAIN UNCOVERED AND

ACCESSIBLE DURING AN EMERGENCY.

3. STAGING AREA LIMITS SHOWN ARE APPROXIMATE

AND THE CONTRACTOR IS RESPONSIBLE FOR

DETERMINING THE FINAL STAGING AREA

LOCATION AND LIMITS. ANY CONTRACTOR

STAGING AREA SHALL NOT INTERFERE WITH FIRE

LANE ACCESS TO ANY BUILDINGS. CONTRACTOR

SHALL MAINTAIN CLEAR AND OPEN FIRE LANES IN

PARKING LOT AREA AT ALL TIMES.

4. THE CONTRACTOR SHALL REPAIR ANY DAMAGE

CAUSED BY CONSTRUCTION ACTIVITIES TO

CONCRETE PARKING LOT, CURBS, OR SPLASH PAD

AT NO ADDITIONAL COST, INCLUDING REPAVING

AND RESTRIPING PARKING LOT PAVING AS

NECESSARY AT THE CONCLUSION OF

CONSTRUCTION.

5. CONTRACTOR SHALL PROVIDE SECURITY FENCING

AROUND SUGGESTED STAGING AREAS. BID ITEM

NO. 2 HAS BEEN ESTABLISHED FOR THIS WORK.

THIS FENCING SHALL INCLUDE PRIVACY

SCREENING FABRIC TO OBSCURE VISIBILITY OF

THE STAGING AREA FROM THE EXTERIOR OF THE

SITE. CONTRACTOR IS RESPONSIBLE FOR BOTH

THE SECURITY OF THE PROJECT SITE AND THE

STAGING AREA AT ALL TIMES DURING

CONSTRUCTION.

6. CONTRACTOR SHALL PROTECT TELECOM

COMPANIES' TEMPORARY POLES, ANTENNAS AND

CABLES LOCATED IN CONCRETE PARKING LOT.

THE LIMITS OF ANY STAGING AREA FENCING

SHALL BE OUTSIDE OF THE TEMPORARY POLES,

ANTENNAS AND CABLES.

7. CITY EQUIPMENT (INCLUDING SCADA CABINET AND

ANALYZER) AND PRIVATE UTILITY RADIO

ANTENNAS WILL BE REMOVED FROM TANK PRIOR

TO CONSTRUCTION. CONTRACTOR SHALL

COORDINATE WITH CITY AND PRIVATE UTILITY AS

NECESSARY FOR WORK ACTIVITIES AND MAINTAIN

WORKER SAFETY RELATED TO RF EXPOSURE

LIMITS WHILE WORKING AROUND ANY CITY AND

TELECOM ANTENNAS OR EQUIPMENT.

8. ALL RUSTED AND/OR CORRODED BOLTS AND NUTS

ON ALL TOWER LEG BASES SHALL BE REPAIRED

OR REPLACED IN KINDAPPROXIMATE TANK DIAMETER

SEE NOTE 9

BLAST AND RECOAT

TANK INTERIOR

AND EXTERIOR

TANK CENTER COLUMN

IMPROVEMENTS, REFER

SECTION ON C-05

EXIST 20" WATERLINE

EXIST 14" WATERLINE

REMOVE EXIST 20"

MOV AND REPLACE

WITH 20" CONTROL VALVE

EXIST 14" CKV

CONCRETE SPLASH PAD

(SEE 3/C-07)

SEE NOTE 8

PROPERTY LINE

ELECTRICAL EASEMENT LINE

SUGGESTED

STAGING AREA

6.

647.5

SEE NOTES 3, 6, 7, AND 8

EXISTING

ACCESS GATE

CAUTION!

EXISTING OVERHEAD ELECTRIC

LINES IN THIS AREA

SEE NOTE 2

SUGGESTED

STAGING AREA

TIE SECURITY

FENCING TO EXIST

FENCE (TYP)

TIE SECURITY

FENCING TO EXIST

FENCE (TYP)

EXIST 20" BFV

-1

7-

M G

G

LE

N V

IL

LE

E

LE

V A

TE

D

W A

TE

R

S

TO

R A

G E

T A

N K

R E

H A

B

IL

IT

A

TI

O

N

G R

A D

IN

G

P

LA

N

C-04

( IN FEET )

1 INCH = FT

0 105

SCALE: N.T.S.1 TYPICAL TOWER LEG SECTION

GROUND/SWALE GROUND/SWALE

LEGEND:

EXISTING MINOR CONTOUR (0.5' INTERVAL)

EXISTING MAJOR CONTOUR (1' INTERVAL)

PROPOSED MINOR CONTOUR (0.5' INTERVAL)

PROPOSED MAJOR CONTOUR (1' INTERVAL)

1% MIN. 1% MIN.

TOWER LEG

CONCRETE

TOWER LEG

FOUNDATION

6-IN MAX

4:1

CL

SCALE: N.T.S.2 PROPOSED DITCH CROSS SECTION

REFER SITE PLANS FOR DITCH

ELEVATION POINT TABLES

4:1

NOTES:

1. CONTRACTOR TO TAKE NOTE OF ANY PONDING ON SITE DURING

CONSTRUCTION AND ADD FILL TO AVOID PONDING ISSUES THROUGHOUT SITE.

2. CONTRACTOR TO COORDINATE WITH CITY TO PERFORM GRADING AND

DRAINAGE IMPROVEMENTS ONLY AFTER REMOVAL OF EXISTING GENERATOR

ROOM FROM SITE.

ADD GRADING FILL AROUND

TOWER LEGS (TYP)

7.

6.

647.5

ELEV = 646.40

SW

AL

E

.4

5% SW

AL

E

.9

5%

SWALE @ 0.51%

ELEV = 647.68

ELEV = 647.53

ELEV = 647.40

ELEV = 647.65

-1

7-

ROOF MANWAY

ROOF LADDER

W/ SAFETY DEVICE

BALCONY W/

HANDRAIL

(SEE 4/S-02)

RISER ROD

TOWER LADDER

W/ SAFETY DEVICE

STRUT & RISER ROD

RISER

SHELL MANWAY

INLET/OUTLET PIPE

CITY LOGOS

(SEE 1 AND 2/C-07)

BLAST AND RECOAT

TANK EXTERIOR

INCLUDING PIPING

AND APPURTENANCES

MATERIAL LOSS ON

ACCESS TUBE

TO BE PATCHED

(SEE 3/C-06)

ROOF VENT

12-IN OVERFLOW PIPE

FAA LIGHTING

(SEE 4/C-07)

OVERFLOW WEIR

GROUND ELEV = 647'

H E

IG

H

T

TO

H

IG

H W

A

TE

R L

E V

E L

9' -6

TA

N

K P

LA

N

A N

D E

LE

V

A

TI

O N

C-05

SCALE: N.T.S.3 TANK ELEVATION SCHEMATIC VIEW

NOTE:

1. ELEVATION VIEW SHOWN IS SCHEMATIC ONLY, AND DOESN'T

REPRESENT ACTUAL TANK.

1.

M G

G

LE

N V

IL

LE

E

LE

V A

TE

D

W A

TE

R

S

TO

R A

G E

T A

N K

R E

H A

B

IL

IT

A

TI

O

N

ROOF VENT

ROOF MANWAY

SCALE: N.T.S.1 ROOF PLAN SCHEMATIC VIEW

SCALE: N.T.S.2 FLOOR PLAN SCHEMATIC VIEW

ROOF LADDER

W/ SAFETY DEVICE

BLAST AND RECOAT

TANK INTERIOR

INCLUDING PIPING

AND APPURTENANCES

REPAIR/REPLACE RUSTED

AND/OR CORRODED BOLTS

AND NUTS IN KIND (TYP ALL

TOWER LEGS)

(SEE 1/C-06)

BLAST AND RECOAT

TANK INTERIOR

INCLUDING PIPING

AND APPURTENANCES

PROPOSED

FAA LIGHTING

-1

7-

M G

G

LE

N V

IL

LE

E

LE

V A

TE

D

W A

TE

R

S

TO

R A

G E

T A

N K

R E

H A

B

IL

IT

A

TI

O

N

TA

N

K P

H O

TO

S

C-06

REPAIR/REPLACE CORRODED BOLTS AND NUTS WITH1 EXISTING TOWER LEG

REMOVE AND REPLACE FLAP VALVE WITH WITH 24" CLEARANCE (SEE 3/C-07)2 EXISTING OVERFLOW PIPE

REPAIR HOLE PER STRUCTURAL DETAILS6 EXISTING DRY RISER ACCESS TUBE

3 EXISTING TANK INTERIOR LADDER

REPLACE MOV WITH CONTROL VALVE (SEE 5/C-07)9 EXISTING 20" INLET/OUTLET MOV

NOTES:

1. PHOTOGRAPHS ARE INTENDED TO ILLUSTRATE CONDITIONS THE CONTRACTOR MAY ENCOUNTER DURING CONSTRUCTION.

2. CONTRACTOR TO FIELD VERIFY THE ACCURACY OF EVERY ELEMENT SHOWN IN THE PHOTOGRAPHS. CONDITIONS OF TANK

AND ELEMENTS MAY HAVE CHANGED SINCE PHOTOS WERE TAKEN.

3. THE PHOTOGRAPHS SHOWN DO NOT INCLUDE ALL ITEMS ASSOCIATED WITH THE PROJECT SCOPE AND ARE NOT TO SCALE.

REPLACE PIPING AS NECESSARY TO ACHIEVE LAY

NEEDED FOR CONTROL VALVE - COORDINATE WITH MFR.

BLAST AND RECOAT PER SPECIFICATION4 EXISTING WET ACCESS TUBE CEILING

BLAST AND RECOAT PER SPECIFICATION7 EXISTING INTERIOR DUCTILE IRON PIPE

BLAST AND RECOAT PER SPECIFICATION8 EXISTING INTERNAL VAPOR ZONE

BLAST AND RECOAT PER SPECIFICATION10 EXISTING ROOF ACCESS HATCH

REDUCE GAP BELOW TOE BOARD TO 1/4" OR LESS FOR ALL TOE BOARD5 EXISTING ROOF AND HANDRAIL

INSTALL TOE BOARD ON ALL INTERMEDIATE LADDER LANDING HANDRAILS11 EXISTING LADDER INTERMEDIATE LANDING

REDUCE GAP

IN TOE BOARD

(SEE 4/S-02)

10% OR GREATER MATERIAL LOSS IN KIND

REPLACE IN PLACE (SEE 4/C-07)12 EXISTING FAA LIGHTING

REPLACE FAA

LIGHTING IN PLACE

REUSE EXIST

METAL PLATE

-1

7-

M G

G

LE

N V

IL

LE

E

LE

V A

TE

D

W A

TE

R

S

TO

R A

G E

T A

N K

R E

H A

B

IL

IT

A

TI

O

N

C

IV

IL

D

E

TA

IL

S

C-07

N.T.S.1 TANK LOGO DETAIL

NOTE:

1. REFER TO CITY OF RICHARDSON BRAND GUIDELINES IN

APPENDIX C OF THE CONTRACT DOCUMENTS FOR

ADDITIONAL DETAILS ON THE CITY LOGOS TO BE APPLIED

TO THE TANK.

2. COORDINATE LOGO SIZE, DETAILS, AND ORIENTATION

WITH CITY COMMUNICATIONS DEPARTMENT PRIOR TO

INSTALLATION.

3. SUBMIT PROPOSED LOGO DETAIL FOR APPROVAL PRIOR

TO INSTALLATION.

SCALE: N.T.S.2 LOGO ORIENTATION DETAIL

CENTER

LOGO

CE

NT

ER

LO

G O

N O

R

TH

90°

EAST

CENTER

LO

G

O

30°

30°

LOGO

LOGO

LOGO

SCALE: N.T.S.3 OVERFLOW PIPING AND SPLASHPAD DETAIL

EXIST SPLASH PAD REMOVE AND

REPLACE FLAP VALVE

REINSTALL PRESSURE

GAUGE ON EXISTING PIPE

NEW FLAP VALVE TO

HAVE MINIMUM 24"

CLEARANCE

NOTE:

1. DETAIL IS FOR REFERENCE ONLY.

2. CONTRACTOR SHALL COORDINATE THE PLACEMENT OF THREE

LOGOS WITH THE OWNER TO ENSURE DESIRED LOCATIONS.

3. SEE ELEVATION FOR MAXIMUM SIZE (HEIGHT) OF LOGOS.

PROP PIPE BEND

SCALE: N.T.S.4 OBSTRUCTION LIGHT DETAIL

TWR LIGHTING

OBSTRUCTION LIGHT

LED OL2 FAA

TYPE L-810

TWR LIGHTING

TRANSFER RELAY

TWR LIGHTING

PHOTOCELL-AIM EYE

NORTH

REPLACE MOUNTING

BRACKET IN PLACE

INSTALL TO

EXISTING METAL PLATE

NOTE:

1. REPLACE EXIST OBSTRUCTION LIGHTING IN PLACE

2. REUSE EXISTING CIRCUIT

3. REFER SPECIFICATION 26 55 61

EXIST FLANGED DIP

PROPOSED DIP

PROPOSED ELECTRONIC INTERFACE

AND ALTITUDE CONTROL VALVE

(SEE SPECIFICATION 22 10 00)

EXIST DISMANTLING JOINT

EXIST 20" BFV

EXIST PIPE

SUPPORT

EXIST PIPE

SEE NOTE 1

SCALE: N.T.S.5 ELECTRONIC INTERFACE AND ALTITUDE CONTROL VALVE

NOTE:

1. CONFIRM DIP LENGTH REQUIRED BASED ON ELECTRONIC

INTERFACE AND ALTITUDE CONTROL VALVE LENGTH FROM MFR.

2. ALL EXISTING PIPING AND VALVING TO REMAIN IN VALVE VAULT TO

BE COATED PER SPECIFICATIONS.

3. ALL PROPOSED PIPING AND VALVING TO BE NSF 61 CERTIFIED.

-1

7-

M G

G

LE

N V

IL

LE

E

LE

V A

TE

D

W A

TE

R

S

TO

R A

G E

T A

N K

R E

H A

B

IL

IT

A

TI

O

N

S

TR

U C

TU

R

A L

D E

TA

IL

S

O F

S-01

11/16/2026

(E) FLOOR PLATE

(E) TOE PLATE

(E) MIDRAIL

(E) HANDRAIL

REPAIR HANDRAIL TO ENSURE NO

GAP LARGER THAN 14" BETWEEN

TOE PLATE AND WALKWAY

(E) = EXISTING

1.

M G

G

LE

N V

IL

LE

E

LE

V A

TE

D

W A

TE

R

S

TO

R A

G E

T A

N K

R E

H A

B

IL

IT

A

TI

O

N

S

TR

U C

TU

R

A L

D E

TA

IL

S

O F

S-02

11/16/2026

File details come from the government source that posted it. Updated .