2-CSP No. 901-27 Constructions Plans 1.0 MG Glenville Elevated Storage Tank Rehab.pdf
PDF 7 MB Posted
- Solicitation number
- 901-27
- Issued by
- Dallas County, Texas
About this file
Construction Plans Summary: 1.0 MG Glenville Elevated Water Storage Tank Rehabilitation
This document comprises the construction plans (CSP No. 901-27) prepared by the City of Richardson, Texas for the rehabilitation of an existing 1.0 megagallon elevated water storage tank located at 1260 Columbia Drive, Richardson, Texas 75081. The project scope encompasses removal and replacement of interior and exterior protective coating systems, application of City logos, structural repairs to support legs and components, replacement of safety equipment and appurtenances, and miscellaneous rehabilitation work. The construction plans include 13 sheets detailing site plans, grading, erosion control, tank elevations, structural details, and civil details. The estimated quantities schedule lists 39 base bid items and 2 alternate bid items, including mobilization, security fencing, traffic control, site restoration with Bermuda block sod (1,500 square yards), containment systems for coating removal, interior and exterior coating applications, roof repairs, ladder replacements, valve modifications, and confined space entry placards. The plans reference technical specifications and appendices containing inspection reports from Steel Inspectors of Texas, Inc. and Tank Industry Consultants, Inc., as well as the City's brand guidelines for logo applications.
The construction plans establish comprehensive requirements for contractor performance, including detailed general notes, site-specific construction notes, and erosion and sedimentation control protocols. The contractor is responsible for all costs associated with testing, chlorination, disinfection, flushing, traffic control, utility coordination, environmental compliance, and site restoration at no additional cost to the City. The plans require the contractor to obtain all necessary permits, coordinate utility shutdowns with 48-hour advance notice, contact Texas 811 at least 72 hours prior to construction, submit pre-mobilization site documentation for City approval, and maintain daily erosion control inspections. The City's estimated project cost is approximately $2,180,000, with funding sourcing not specified in the construction plans document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1-CSP No. 901-27 Bid Book 1.0 MG Glenville Elevated Storage Tank Rehab.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C
IV
IL
.0 M
G G
LE
N
V
IL
LE
E
LE
V
A
TE
D W
A
TE
R S
TO
R
A G
E T
A N
K R
E H
A B
IL
IT
A
TI
O N
N
O V
E M
B E
R
SHEET INDEX
DESCRIPTIONSHEET NO.
NOVEMBER 2026
1 G-01 COVER SHEET
2 G-02 GENERAL NOTES
3 G-03 ESTIMATED QUANTITIES
4 G-04 AERIAL IMAGE
5 C-01 EXISTING SITE PLAN
6 C-02 EROSION CONTROL PLAN
7 C-03 PROPOSED SITE PLAN
8 C-04 GRADING PLAN
9 C-05 TANK PLAN AND ELEVATION
10 C-06 TANK PHOTOS
11 C-07 CIVIL DETAILS
12 S-01 STRUCTURAL DETAILS 1 OF 2
13 S-02 STRUCTURAL DETAILS 2 OF 2
CITY OF RICHARDSON
CONSTRUCTION PLANS
FOR
1.0 MG GLENVILLE ELEVATED WATER
STORAGE TANK REHABILITATION
CSP NO. 901-27
PROJECT LOCATION
1260 Columbia Dr, Richardson, TX 75081
LOCATION MAP
SCALE: 1" = 2000'
MAYOR
AMIR OMAR
MAYOR PRO TEM
KEN HUTCHENRIDER
CITY COUNCIL
CURTIS DORIAN JENNIFER JUSTICE
DANIEL BURDETTE JOE CORCORAN
AREFIN SHAMSUL
CITY MANAGER
DON MAGNER
CHIEF OPERATING OFFICER
KENT PFEIL
ASSISTANT CITY MANAGERS
MICHAELA DOLLAR
CHARLES GOFF
DIRECTOR OF ENGINEERING
KATIE BARRON,P.E.
SENIOR PROJECT ENGINEER
MOSES OGOLLA, P.E.
DWG. NO.
11-17-2026
1.
M G
G
LE
N V
IL
LE
E
LE
V A
TE
D
W A
TE
R
S
TO
R A
G E
T A
N K
R E
H A
B
IL
IT
A
TI
O
N
G E
N E
R A
L N
O
TE
S
G-02
LEGEND
EXISTING FEATURES
SANITARY SEWER MANHOLE
FIRE HYDRANT
WATER VALVE
GAS METER
WATER METER
BUTTERFLY VALVE (BFV)
MOTOR OPERATED VALVE (MOV)
CHECK VALVE (CKV)
TELEPHONE RISER
POWER POLE
MAIL BOX
IRON PIN
TRAVERSE POINT
SIGN
FENCE CORNER
LIGHT POLE
GUY WIRE ANCHOR
TREE
BUSH
TRANSMISSION TOWER
GAS LINE
OVERHEAD ELECTRIC LINE
UNDERGROUND ELECTRIC LINE
WATER LINE (SIZE AS NOTED)
SEWER LINE (SIZE AS NOTED)
FLOW LINE DITCH
EDGE ASPHALT PAVEMENT
CHAIN LINK FENCE
GENERAL NOTES
1. ALL WORK SHALL CONFORM TO THE CONSTRUCTION STANDARDS OF THE CITY OF RICHARDSON AND SHALL BE IN ACCORDANCE WITH THE PLANS, SPECIFICATIONS, AND CONTRACT DOCUMENTS FOR THIS
PROJECT, AND THE NORTH CENTRAL TEXAS COUNCIL OF GOVERNMENTS (NCTCOG) STANDARD
SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION, 5TH EDITION.
2. IN CASE OF CONFLICT OR CONTRADICTIONS BETWEEN THE ABOVE STANDARDS THE FOLLOWING
HIERARCHY SHALL PRESIDE: PLANS, SPECIFICATIONS, AND CONTRACT DOCUMENTS FOR THIS
PROJECT, CITY OF RICHARDSON CONSTRUCTION STANDARD DETAILS, THE NORTH CENTRAL TEXAS
COUNCIL OF GOVERNMENTS (NCTCOG) STANDARD SPECIFICATIONS FOR PUBLIC WORKS
CONSTRUCTION, 5TH EDITION.
3. THE APPROXIMATE LOCATION OF EXISTING UTILITIES AND OTHER UNDERGROUND FACILITIES ARE GIVEN FOR REFERENCE ONLY AND ARE TAKEN FROM PUBLIC RECORDS. BEFORE COMMENCING THE WORK ON THIS CONTRACT, THE CONTRACTOR SHALL VERIFY BY FIELD INVESTIGATION THE ACTUAL LOCATIONS OF ALL UTILITY FACILITIES WITHIN AND ADJACENT TO THE LIMITS OF THE WORK THAT MAY BE AFFECTED BY THE WORK. IT IS THE CONTRACTOR'S RESPONSIBILITY TO MAKE ARRANGEMENTS WITH THE OWNERS OF SUCH UTILITY FACILITIES PRIOR TO WORKING IN THE AREA TO CONFIRM THEIR EXACT LOCATION AND TO DETERMINE WHETHER ANY ADDITIONAL FACILITIES OTHER THAN THOSE
SHOWN ON THE PLANS MAY BE PRESENT. THE CONTRACTOR SHALL PRESERVE AND PROTECT ALL
UNDERGROUND FACILITIES. CONFLICTS WHICH RESULT DUE TO NEGLIGENCE BY THE CONTRACTOR TO
LOCATE, HORIZONTALLY AND VERTICALLY, EXISTING UTILITIES WHICH ARE SHOWN ON THE
CONSTRUCTION DRAWINGS, OR WHICH THE CONTRACTOR HAS BEEN GIVEN NOTICE OR HAS
KNOWLEDGE, SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR. THE COST OF REMEDIAL WORK, REMOVAL OF PORTIONS OF THE WORK OR EXTENSIVE DESIGN CHANGES OCCASIONED BY THE FAILURE OF THE CONTRACTOR TO VERIFY THE LOCATION OF EXISTING UTILITIES AS DESCRIBED
ABOVE SHALL BE BORNE BY THE CONTRACTOR.
4. WHERE EXISTING UTILITIES OR SERVICE LINES ARE CUT, BROKEN OR DAMAGED, THE CONTRACTOR SHALL REPLACE OR REPAIR THE UTILITIES OR SERVICE LINES WITH THE CURRENT STANDARDS FOR MATERIAL AND CONSTRUCTION, OR BETTER, AT HIS OWN COST AND EXPENSE. THE CONTRACTOR
SHALL IMMEDIATELY NOTIFY THE CITY AT ONCE OF ANY CONFLICTS.
5. CONTRACTOR SHALL NOT STORE SPOIL IN DRAINAGE WAYS DURING CONSTRUCTION. THROUGHOUT CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR EROSION CONTROL PERMITTING & THE IMPLEMENTATION AND MAINTENANCE OF EROSION CONTROL FOR THE PROJECT. IN THE EVENT
THAT SIGNIFICANT EROSION OCCURS AS A RESULT OF CONSTRUCTION THE CONTRACTOR SHALL
RESTORE TO ORIGINAL CONDITION OR IMPROVE THE ERODED AREA AS SOON AS POSSIBLE.
6. THE CONTRACTOR SHALL RESTORE ALL AREAS DISTURBED BY CONSTRUCTION TO ORIGINAL
CONDITION OR BETTER. RESTORED AREAS INCLUDE, BUT ARE NOT LIMITED TO TRENCH BACKFILL, SIDE
SLOPES, FENCES, CULVERT PIPES, DRAINAGE DITCHES, IRRIGATION, SODDING OR SEEDING,
DRIVEWAYS, PRIVATE YARDS, AND ROADWAYS.
7. NO CHANGES IN THE APPROVED CONSTRUCTION PLANS SHALL OCCUR UNLESS APPROVED BY THE
CITY'S PROJECT ENGINEER OR ENGINEER OF RECORD (EOR).
8. ALL FRANCHISE UTILITIES SHALL BE RELOCATED AS NEEDED PRIOR TO PUBLIC IMPROVEMENTS BY THE
CITY OF RICHARDSON.
9. CONTRACTOR SHALL PROVIDE ACCESS TO PRIVATE DRIVEWAYS AT ALL TIMES.
10. THE CONTRACTOR SHALL SUBMIT AN UPDATED AND DETAILED CONSTRUCTION SCHEDULE WITH EACH
MONTHLY INVOICE.
11. THE CONTRACTOR SHALL SUBMIT A TRAFFIC CONTROL PLAN FOR CITY APPROVAL PRIOR TO
MOBILIZATION.
12. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL NECESSARY PERMITS AND APPROVALS
NECESSARY FOR CONSTRUCTION.
13. THE CONTRACTOR SHALL NOTIFY UTILITY COMPANIES A MINIMUM OF 48 HOURS PRIOR TO CROSSING
THEIR LINES TO NOTIFY THEM OF UPCOMING CONSTRUCTION.
14. THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGE TO THE EXISTING PUBLIC OR PRIVATE UTILITY LINES, INCLUDING BUT NOT LIMITED TO WATER LINES, ELECTRICAL AND STORM
SEWERS, DURING CONSTRUCTION.
15. CONTRACTOR IS TO CONTACT TEXAS 811 FOR LOCATION OF EXISTING FACILITIES THAT MAY NOT BE
SHOWN ON THE PLANS AT LEAST 72 OURS PRIOR TO COMMENCEMENT OF ANY CONSTRUCTION
ACTIVITIES.
16. CONTRACTOR, WITH THE ASSISTANCE OF THE ENGINEER IF NECESSARY, SHALL OBTAIN ALL
APPLICABLE CITY, STATE AND FEDERAL PERMITS.
17. CONTRACTOR SHALL COMPLY WITH ALL OSHA REGULATIONS, TCEQ REGULATIONS, AND ALL OTHER
APPLICABLE TEXAS STATE LAWS.
18. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING, MAINTAINING AND RESTORING ALL
EXISTING FACILITIES AFFECTED BY THIS CONSTRUCTION PROJECT TO EXISTING OR BETTER
CONDITION, UNLESS OTHERWISE NOTED, AT NO ADDITIONAL COST TO THE OWNER.
19. DURING CONSTRUCTION, THE CONTRACTOR SHALL MAINTAIN ADEQUATE DRAINAGE AND SAFE ACCESS
TO ADJACENT PROPERTIES, REGARDLESS OF THE WEATHER CONDITIONS.
20. CONTRACTOR SHALL FIELD VERIFY DIMENSIONS AND INFORM ENGINEER AND CITY VIA RFI OF ANY
DISCREPANCIES FROM PLANS THAT COULD RESULT IN CHANGES TO THE WORK.
21. CONTRACTOR SHALL PERFORM WORK IN A MANNER TO LIMIT NOISE FROM CONSTRUCTION TO ACCEPTABLE LEVELS FOR PROPERTIES ADJACENT TO THE CONSTRUCTION AREA AS REQUIRED UNDER
THE CITY OF RICHARDSON NOISE ORDINANCE.
22. ALL PIPE ABOVE GROUND SHALL BE NEW STAINLESS-STEEL PIPE, CEMENT LINED UNLESS SHOWN OTHERWISE. ALL STEEL PIPE, VALVES AND FITTINGS (ABOVE GROUND), SHALL BE PAINTED IN ACCORDANCE WITH THE APPLICABLE PAINTING SPECIFICATIONS. ALL PIPE, FITTINGS, VALVES, AND APPURTENANCES SHALL MEET THE MINIMUM REQUIREMENTS OF THE TCEQ, THE AWWA, THE FDA AND
THE NSF FOR POTABLE WATER.
23. THE CONTRACTOR SHALL INCLUDE IN HIS BID PRICE, ALL NECESSARY EQUIPMENT, MACHINERY, AND CONSTRUCTION TECHNIQUES REQUIRED TO REHABILITATE THE FACILITY WITHIN THE SPECIFIED
CONTRACT TIME.
24. LANES OF TRAFFIC SHALL BE MAINTAINED AT ALL TIMES. ALL TRAFFIC CONTROL SIGNS, BARRICADES, AND FLAGGING SHALL BE IN ACCORDANCE WITH THE TEXAS MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES, CURRENT ADDITION. CONTRACTOR SHALL BE RESPONSIBLE FOR TRAFFIC CONTROL. THE COST OF ANY REQUIRED TRAFFIC CONTROL PROVISIONS SHALL BE INCIDENTAL TO THE PROJECT.
25. CONTRACTOR WILL FURNISH ALL TOOLS, LABOR AND EQUIPMENT REQUIRED FOR CONDUCTING PRESSURE TESTING (LEAKAGE TESTS) OF ALL WATER LINES AND ALL APPLICABLE TESTS FOR THE
ELEVATED WATER STORAGE TANK. THE CONTRACTOR WILL CONDUCT ALL TESTS IN ACCORDANCE
WITH THE APPLICABLE SPECIFICATIONS. THE OWNER OR THE OWNER'S REPRESENTATIVE WILL
OBSERVE AND DOCUMENT SAID TESTS. ALL TESTS AND TESTING EQUIPMENT WILL BE AT THE EXPENSE OF THE CONTRACTOR. THE CONTRACTOR WILL INCLUDE THESE COSTS IN HIS BID PRICE FOR THE PROJECT. ALL MATERIAL TESTS OF ASPHALT, SUBGRADE, LIME CONTENT, CEMENT CONTENT, OR DENSITIES THAT IS REQUIRED TO COMPLETE THE PROJECT SHALL BE FURNISHED AND PAID FOR BY THE CITY OF RICHARDSON, AND SHALL BE MADE IN ACCORDANCE WITH THE LATEST METHODS OF THE
AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM).
26. THE CONTRACTOR WILL FURNISH ALL TOOLS, LABOR AND EQUIPMENT REQUIRED FOR CHLORINATING, DISINFECTING, AND FLUSHING OF THE WATER TANK AND ALL WATER LINES. THE OWNER OR THE
OWNER'S REPRESENTATIVES WILL COLLECT SAMPLES FOR BACTERIOLOGICAL TESTING.
27. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PAINTING AND PROTECTIVE COATING.
28. THE CONTRACTOR SHALL INCLUDE IN THEIR BID PRICE COORDINATION WITH ANY UTILITY SERVICES
THAT MAY BE AFFECTED BY WORK DONE ON SITE.
29. SURPLUS MATERIAL NOT REQUIRED FOR OTHER PARTS OF THE WORK OR ARE NOT OTHERWISE SPECIFICALLY COVERED BY THE DRAWINGS OR SPECIFICATIONS SHALL BECOME THE RESPONSIBILITY
OF THE CONTRACTOR UNLESS OTHERWISE DIRECTED BY THE CITY. THE COST OF REMOVAL OF
SURPLUS MATERIAL IS NOT A PAY ITEM. IT SHALL BE SUBSIDIARY TO ALL OTHER BID ITEMS.
30. THE CONTRACTOR SHALL RESTORE ALL AREAS DISTURBED BY CONSTRUCTION TO ORIGINAL
CONDITION OR BETTER. RESTORED AREAS INCLUDE, BUT ARE NOT LIMITED TO TRENCH BACKFILL, SIDE SLOPES, FENCES, CULVERT PIPES, DRAINAGE DITCHES, IRRIGATION, SODDING OR SEEDING, DRIVEWAYS, PRIVATE YARDS AND ROADWAYS.
31. THE CONTRACTOR IS RESPONSIBLE FOR RESTORATION OF ANY FENCES, GATES OR OTHER
STRUCTURES DISTURBED BY THE CONTRACTOR'S WORK.
32. CONTRACTOR TO REFER TO THE STEEL INSPECTORS OF TEXAS, INC. INSPECTION REPORT INCLUDED
IN APPENDIX A OF THE CONTRACT DOCUMENTS, AND THE TANK INDUSTRY CONSULTANTS, INC.
INSPECTION REPORT INCLUDED IN APPENDIX B OF THE CONTRACT DOCUMENTS, FOR DETAILS
REGARDING TANK CONDITION AND LIMITATIONS.
33. ADDITIONAL TESTING TO DETERMINE THE AMOUNT OF LEACHABLE CONTAMINANTS PRESENT IN THE SPENT CLEANING DEBRIS SHALL BE PERFORMED FOLLOWING CLEANING OPERATIONS AT THE TIME OF REPAINTING. THIS TESTING SHALL CONFORM TO ALL FEDERAL, STATE AND LOCAL REGULATIONS. THE COST OF THIS TESTING SHALL BE SUBSIDIARY TO THE TANK EXTERIOR COATING BID ITEM (BID ITEM NO.
11) OR THE TANK INTERIOR COATING BID ITEMS (BID ITEM NOS. 12 AND 13), DEPENDING UPON THE
LOCATION WHERE THE SPENT CLEANING DEBRIS WAS USED TO REMOVE THE EXISTING COATING
MATERIAL. REFER TO TECHNICAL SPECIFICATION SECTION 13 50 00 - "REMOVAL OF HEAVY METAL
CONTAMINATED PAINT" FOR FURTHER DETAIL.
34. CONTRACTOR SHALL VISIT THE SITE PRIOR TO MOBILIZATION AND DOCUMENT THE ENTIRE SITE VIA PHOTOS AND/OR VIDEO. THIS PHOTO/VIDEO SHALL BE SUBMITTED TO THE CITY FOR REVIEW PRIOR TO MOBILIZATION. THE CITY WILL REVIEW THE PHOTO/VIDEO AND NOTIFY THE CONTRACTOR ONCE THE
PHOTO/VIDEO IS SATISFACTORY SO THAT CONTRACTOR MOBILIZATION MAY BEGIN.
35. UNLESS OTHERWISE PROVIDED IN THE CONTRACT OR BID PROPOSAL AS A SEPARATE BID ITEM, NO SEPARATE PAY SHALL BE MADE FOR WORK SPECIFIED IN THE CONTRACT DOCUMENTS AND FOR WHICH NO PAY ITEM IS INDICATED, BUT SUCH WORK SHALL BE CONSIDERED AS INCIDENTAL WORK AND THE COST THEREOF SHALL BE INCLUDED IN THE CONTRACT PAY ITEMS PROVIDED IN THE PROPOSAL AND
THE CONTRACT.
SITE SPECIFIC CONSTRUCTION NOTES
1. PROVIDE PROTECTIVE COATINGS FOR ALL PIPING AND VALVES IN ACCORDANCE WITH SECTION
09-97-13 OF THE PROJECT SPECIFICATIONS.
2. HAND DIG AS REQUIRED AROUND EXISTING UTILITIES.
3. THE CONTRACTOR SHALL SCHEDULE ALL SHUT-DOWNS A MINIMUM OF 48 HOURS IN ADVANCE. ALL
SHUT-DOWNS SHALL BE APPROVED BY AND COORDINATED WITH THE OWNER.
4. CONTRACTOR TO PROTECT AREAS NOT BEING BLASTED FROM BLAST MATERIAL DEFLECTION.
DAMAGE FROM BLAST DEFLECTION SHALL BE CORRECTED BY THE CONTRACTOR AT NO COST TO THE
OWNER.
5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DISPOSAL OF THE DEMOLISHED EQUIPMENT IN
ACCORDANCE WITH LOCAL AND FEDERAL REGULATIONS AND OWNER'S REQUIREMENTS.
6. PROVIDE SAFETY LABELING AS PER OSHA STANDARDS FOR CONFINED SPACE ENTRYWAYS ON THE
ROOF HATCH AND SHELL MANWAYS.
7. CONTRACTOR TO DISPOSE OF THE EXISTING EQUIPMENT AND MATERIAL IN ACCORDANCE WITH THE
CONTRACT DOCUMENTS.
EROSION AND SEDIMENTATION CONTROL NOTES
1. PRIOR TO START OF CONSTRUCTION, CONTRACTOR SHALL INSTALL EROSION AND SEDIMENTATION
CONTROLS AT LOCATION SHOWN ON PLANS.
2. CONTRACTOR SHALL INSPECT ALL EROSION AND SEDIMENTATION CONTROL SYSTEMS SPECIFIED
HEREIN, AT A MINIMUM OF ONCE EVERY WORKING DAY.
3. CONTRACTOR SHALL MAINTAIN, REPAIR AND/OR REPLACE DAMAGED EROSION AND SEDIMENTATION
CONTROL SYSTEM THROUGHOUT THE DURATION OF THE CONTRACT. (NO SEPARATE PAY)
4. CONTRACTOR SHALL PROVIDE PROTECTED STORAGE AREAS FOR CHEMICALS, PAINTS, SOLVENTS, FERTILIZERS, AND OTHER POTENTIALLY TOXIC MATERIALS.
5. CONTRACTOR SHALL LOCATE FUEL/MATERIAL STORAGE AREAS AWAY FROM STORM WATER
CONVEYANCE SYSTEMS. CONTRACTOR SHALL USE SILT FENCING, HAY BALES, OR BERMS AROUND
FUEL STORAGE AREAS. (NO SEPARATE PAY)
6. CONTRACTOR SHALL ADVISE OWNER IMMEDIATELY, VERBALLY, AND IN WRITING, OF ANY FUEL OR
TOXIC MATERIAL SPILLS ONTO THE PROJECT/CONSTRUCTION AREA AND THE ACTION TAKEN TO
REMEDY THE PROBLEM.
7. CONTRACTOR IS RESPONSIBLE FOR DISPOSING OF HIS FUELS, MATERIALS, AND CONTAMINATED
EXCAVATIONS IN A LEGALLY APPROVED MANNER. (NO SEPARATE PAY)
8. CONTRACTOR IS RESPONSIBLE FOR COMPLYING WITH ALL APPLICABLE ENVIRONMENTAL LAWS.
9. CONTRACTOR IS RESPONSIBLE FOR PROVIDING ADEQUATELY MAINTAINED SANITARY FACILITIES.
10. AT COMPLETION OF THE CONTRACT, OWNER AND/OR OWNER'S REPRESENTATIVE SHALL EXAMINE
EROSION AND SEDIMENTATION CONTROL SYSTEM BEFORE RELIEVING CONTRACTOR OF HIS
MAINTENANCE RESPONSIBILITIES.
11. CONTRACTOR SHALL BE RESPONSIBLE FOR STREET CLEANING, ON A DAILY BASIS, ALL MUD AND DIRT
DEPOSITED ON THE EXISTING PAVEMENT DUE TO HIS CONSTRUCTION ACTIVITY.
12. CONTRACTOR SHALL IMPLEMENT INLET PROTECTION DEVICES AND REINFORCED FILTER FABRIC BARRIER ALONG ROAD AND SIDE DITCHES AT LOCATION SHOWN ON THE EROSION CONTROL PLANS TO KEEP SILT AND OR EXCAVATED MATERIALS FROM ENTERING INTO THE STORM WATER INLETS AND
DITCHES EVENTUALLY POLLUTING THE RECEIVING STORM.
13. DURING THE EXCAVATION PHASE OF THE PROJECT, CONTRACTOR SHALL SCHEDULE THE WORK SO THAT EXCAVATION MATERIAL CAN BE QUICKLY HAULED AWAY FROM THE SITE AND TO PREVENT IT
FROM STAYING UNCOLLECTED ON THE EXISTING PAVEMENT. ANY LOOSE EXCAVATED MATERIAL
WHICH FALLS BACK ON PAVEMENTS OR DRIVEWAYS SHALL BE SWEPT BACK INTO THE EXCAVATED
AREA.
14. CONTRACTOR SHALL CLEAN UP THE EXISTING STREET INTERSECTIONS AND DRIVEWAYS DAILY, AS NECESSARY, TO REMOVE ANY EXCESS MUD, SILT OR ROCK TRACKED FROM THE EXCAVATED AREA.
15. CONTRACTOR SHALL FOLLOW GOOD HOUSEKEEPING PRACTICES DURING THE CONSTRUCTION OF THE
PROJECT, ALWAYS CLEANING UP DIRT AND LOOSE MATERIAL AS CONSTRUCTION PROGRESSES.
16. CONTRACTOR TO INSPECT AND MAINTAIN THE AREAS LISTED BELOW EVERY WORKING DAY:
o DISTURBED AREAS OF THE CONSTRUCTION SITE THAT HAVE NOT BEEN FINALLY STABILIZED.
o AREAS USED FOR STORAGE OF MATERIALS THAT ARE EXPOSED TO PRECIPITATION.
o STRUCTURAL CONTROL MEASURES.
o LOCATIONS WHERE VEHICLES ENTER OR EXIT THE SITE.
17. CONTRACTOR TO BE RESPONSIBLE TO MAINTAIN EXISTING DITCHES AND OR CULVERTS FOR
UNOBSTRUCTED DRAINAGE AT ALL TIMES. WHERE SODDING IS DISTURBED BY EXCAVATION ON
BACKFILLING OPERATIONS, SUCH AREAS SHALL BE REPLACED BY SEEDING OR SODDING. SLOPES 4:1
OR STEEPER SHALL BE REPLACED BY BLOCK SODDING.
18. FILTER FABRIC TO BE CLEANED OR REPLACED WHEN IT CEASES TO FUNCTION PROPERLY OR AS
DIRECTED BY THE ENGINEER AND/OR INSPECTOR.
19. CONTRACTOR MAY SUBMIT PLANS FOR ALTERNATE METHODS OF PROTECTION. THESE ALTERNATE
METHODS MUST BE APPROVED BY THE ENGINEER PRIOR TO USE IN THE FIELD.
PROPOSED FEATURES
NOTE: NOT EVERY LEGEND FEATURE IS USED ON EVERY SITE PLAN.
-1
7-
M G
G
LE
N V
IL
LE
E
LE
V A
TE
D
W A
TE
R
S
TO
R A
G E
T A
N K
R E
H A
B
IL
IT
A
TI
O
N
E S
TI
M
A
TE
D Q
U A
N
TI
TI
E
S
G-03
ESTIMATED QUANTITY SCHEDULE
Item No.
Quantity Unit Description
BASE BID
Item No.
Quantity Unit Description
BASE BID
1 1 LS Mobilization 22 1 LS Repair / Retrofitting Existing Catwalk Railing
2 400 LF
Furnish and Install Construction Staging Area Security Fence, With Privacy Screening Material 23 100 LF
Repair Handrail in Locations With Gap Larger Than 0.25" Between Roof and Toe Plate to Reduce Gap
3 1 LS Barricades, Traffic Control, Protection of Public 24 10 EA Foundation Preparation and Surface Coating - Column Legs
4 350 LF 4" Wide Solid White Parking Space Striping 25 1 LS Foundation Preparation and Surface Coating - Center Column
5 1 EA Project Sign 26 1 LS Install Self-closing gate at Top Platform Safety Railling
6 400 LF Silt Fence for Erosion Control 27 1 EA Install Safety Climb Device to Existing Cone Ladder
7 1 LS Provide Site Grading Improvements 28 1 LS Remove and Replace Interior Wet Ladder
8 1500 SY Bermuda Block Sod and Site Restoration 29 1 EA Remove and Replace Safety-Climb Rail at Interior Wet Ladder
9 1 LS
Remove and dispose of Heavy Metal Coating Material in accordance with Project Specifications and Federal, State, and Local Requirements
30 1 LS Repair and recoat valve vault access ladder
10 1 LS
Containment System for Exterior Coating Removal and Application for 1,000,000 gallon elevated storage tank 31 1 LS Replace valve vault vent screen
11 1 LS Paint Exterior coating system for 1.0 MG elevated storage tank 32 1 LS Modify overflow piping and replace flap-valve
12 1 LS
Paint Interior coating system (Wet) for 1.0 MG elevated storage tank 33 1 LS Inlet / Outlet Pressure Gauge
13 1 LS
Paint Interior coating system (Dry) for 1.0 MG elevated storage tank 34 4 EA Furnish & Install "CONFINED SPACE ENTRY" placards
14 10 GAL Surface Filler 35 1 LS Adjust Conduits / Coaxial Cable at Ladder Locations
15 1 LS Paint Three City Logos 36 1 LS Remove and Re-Install and Calibrate Per Manufacturer's Recommendations Existing Cathodic Protection System
16 1 LS Remove and dispose of dirt and other material from inside of tank bowl 37 1 LS Replace FAA obstruction lighting in place
17 1000 SI Metal repair for corrosion or pitted areas as required to meet NACE standards 38 1 LS Misc Electrical Ajustments
18 2000 LB
Remove and Replace roof beams or rafters that are pitted beyond repair 39 100000 EA Construction Contingency Allowance (authorized for use by City only)
19 5 EA Reuse existing rafters to be reconstructed at original locations in accordance with structural details ADD ALTERNATE BID ITEMS
20 25 LF Misc Welding Repairs #2-1 1 LS Remove existing 20" MOV and replace with 20" electronic interface and altitude control valve in valve vault
21 5 EA
Repair or replace corroded nuts on tank support legs with greater than 10% material loss #3-1 1 LS
Remove, replace in kind, and Calibrate Per Manufacturer's Recommendations Cathodic Protection System
-1
7-
M G
G
LE
N V
IL
LE
E
LE
V A
TE
D
W A
TE
R
S
TO
R A
G E
T A
N K
R E
H A
B
IL
IT
A
TI
O
N
A E
R
IA
L
IM
A G
E
G-04
( IN FEET )
1 INCH = FT
0 4020
N G
LE
N
V
IL
LE
D
R
COLUMBIA DR
LOT 1, BLOCK 1
RICHARDSON SERVICE
CENTER ADDITION
INST. 201800271316
P.R.D.C.T.
CITY OF RICHARDSON
VOL. 296, 203
D.R.D.C.T.
T.P.&L. ELECTRIC
EASEMENT
INST. 196400304440
D.R.D.C.T.
GLENVILLE
EST
-1
7-
M G
G
LE
N V
IL
LE
E
LE
V A
TE
D
W A
TE
R
S
TO
R A
G E
T A
N K
R E
H A
B
IL
IT
A
TI
O
N
E X
IS
TI
N G
S
IT
E P
LA
N
C-01
( IN FEET )
1 INCH = FT
0 2010
N G
LE
N
V
IL
LE
D
R
COLUMBIA DR
CAUTION!
EXISTING OVERHEAD ELECTRIC
LINES IN THIS AREA
CAUTION!
EXISTING OVERHEAD ELECTRIC
LINES IN THIS AREA
EXIST UTILITY
CABINET AREA
EXIST 20"
WATER LINE
EXIST SCADA
BUILDING
EXIST TOWER
PEDESTAL
EXIST TANK
SUPPORT (TYP.)
EXIST 14"
WATER LINE
EXIST 20" MOV
EXIST 14" CKV
PROPERTY LINE
ELECTRICAL
EASEMENT LINE
EXIST 20" BFV
EXIST
ACCESS GATE
-1
7-
M G
G
LE
N V
IL
LE
E
LE
V A
TE
D
W A
TE
R
S
TO
R A
G E
T A
N K
R E
H A
B
IL
IT
A
TI
O
N
SCALE: N.T.S.1 SILT FENCE
SCALE: N.T.S.2 STABILIZED CONSTRUCTION ENTRANCE
E R
O S
IO
N
C O
N
TR
O L
P
LA
N
C-02
( IN FEET )
1 INCH = FT
0 105
PROPOSED
SILT FENCE
SUGGESTED CONSTRUCTION
ENTRANCE LOCATION
(SEE 2/C-02)
-1
7-
M G
G
LE
N V
IL
LE
E
LE
V A
TE
D
W A
TE
R
S
TO
R A
G E
T A
N K
R E
H A
B
IL
IT
A
TI
O
N
P R
O P
O S
E D
S
IT
E P
LA
N
C-03
( IN FEET )
1 INCH = FT
0 105
NOTES:
1. CONTRACTOR SHALL KEEP THE SITE AND
SURROUNDING AREAS, INCLUDING THE PARKING
LOT, CLEAN OF ALL TRASH AND DEBRIS.
CONTRACTOR IS RESPONSIBLE FOR DISPOSING
OF ALL TRASH AND DEBRIS IN A LEGAL MANNER.
2. CONTRACTOR SHALL COORDINATE PARKING
AREAS FOR PERSONNEL WITH CITY. CONTRACTOR
PERSONNEL SHALL NOT PARK IN AREAS THAT
BLOCK FIRE LANES OR ANY OTHER EMERGENCY
ACCESS. EXISTING VALVES AND HANDHOLD
COVERS SHALL REMAIN UNCOVERED AND
ACCESSIBLE DURING AN EMERGENCY.
3. STAGING AREA LIMITS SHOWN ARE APPROXIMATE
AND THE CONTRACTOR IS RESPONSIBLE FOR
DETERMINING THE FINAL STAGING AREA
LOCATION AND LIMITS. ANY CONTRACTOR
STAGING AREA SHALL NOT INTERFERE WITH FIRE
LANE ACCESS TO ANY BUILDINGS. CONTRACTOR
SHALL MAINTAIN CLEAR AND OPEN FIRE LANES IN
PARKING LOT AREA AT ALL TIMES.
4. THE CONTRACTOR SHALL REPAIR ANY DAMAGE
CAUSED BY CONSTRUCTION ACTIVITIES TO
CONCRETE PARKING LOT, CURBS, OR SPLASH PAD
AT NO ADDITIONAL COST, INCLUDING REPAVING
AND RESTRIPING PARKING LOT PAVING AS
NECESSARY AT THE CONCLUSION OF
CONSTRUCTION.
5. CONTRACTOR SHALL PROVIDE SECURITY FENCING
AROUND SUGGESTED STAGING AREAS. BID ITEM
NO. 2 HAS BEEN ESTABLISHED FOR THIS WORK.
THIS FENCING SHALL INCLUDE PRIVACY
SCREENING FABRIC TO OBSCURE VISIBILITY OF
THE STAGING AREA FROM THE EXTERIOR OF THE
SITE. CONTRACTOR IS RESPONSIBLE FOR BOTH
THE SECURITY OF THE PROJECT SITE AND THE
STAGING AREA AT ALL TIMES DURING
CONSTRUCTION.
6. CONTRACTOR SHALL PROTECT TELECOM
COMPANIES' TEMPORARY POLES, ANTENNAS AND
CABLES LOCATED IN CONCRETE PARKING LOT.
THE LIMITS OF ANY STAGING AREA FENCING
SHALL BE OUTSIDE OF THE TEMPORARY POLES,
ANTENNAS AND CABLES.
7. CITY EQUIPMENT (INCLUDING SCADA CABINET AND
ANALYZER) AND PRIVATE UTILITY RADIO
ANTENNAS WILL BE REMOVED FROM TANK PRIOR
TO CONSTRUCTION. CONTRACTOR SHALL
COORDINATE WITH CITY AND PRIVATE UTILITY AS
NECESSARY FOR WORK ACTIVITIES AND MAINTAIN
WORKER SAFETY RELATED TO RF EXPOSURE
LIMITS WHILE WORKING AROUND ANY CITY AND
TELECOM ANTENNAS OR EQUIPMENT.
8. ALL RUSTED AND/OR CORRODED BOLTS AND NUTS
ON ALL TOWER LEG BASES SHALL BE REPAIRED
OR REPLACED IN KINDAPPROXIMATE TANK DIAMETER
SEE NOTE 9
BLAST AND RECOAT
TANK INTERIOR
AND EXTERIOR
TANK CENTER COLUMN
IMPROVEMENTS, REFER
SECTION ON C-05
EXIST 20" WATERLINE
EXIST 14" WATERLINE
REMOVE EXIST 20"
MOV AND REPLACE
WITH 20" CONTROL VALVE
EXIST 14" CKV
CONCRETE SPLASH PAD
(SEE 3/C-07)
SEE NOTE 8
PROPERTY LINE
ELECTRICAL EASEMENT LINE
SUGGESTED
STAGING AREA
6.
647.5
SEE NOTES 3, 6, 7, AND 8
EXISTING
ACCESS GATE
CAUTION!
EXISTING OVERHEAD ELECTRIC
LINES IN THIS AREA
SEE NOTE 2
SUGGESTED
STAGING AREA
TIE SECURITY
FENCING TO EXIST
FENCE (TYP)
TIE SECURITY
FENCING TO EXIST
FENCE (TYP)
EXIST 20" BFV
-1
7-
M G
G
LE
N V
IL
LE
E
LE
V A
TE
D
W A
TE
R
S
TO
R A
G E
T A
N K
R E
H A
B
IL
IT
A
TI
O
N
G R
A D
IN
G
P
LA
N
C-04
( IN FEET )
1 INCH = FT
0 105
SCALE: N.T.S.1 TYPICAL TOWER LEG SECTION
GROUND/SWALE GROUND/SWALE
LEGEND:
EXISTING MINOR CONTOUR (0.5' INTERVAL)
EXISTING MAJOR CONTOUR (1' INTERVAL)
PROPOSED MINOR CONTOUR (0.5' INTERVAL)
PROPOSED MAJOR CONTOUR (1' INTERVAL)
1% MIN. 1% MIN.
TOWER LEG
CONCRETE
TOWER LEG
FOUNDATION
6-IN MAX
4:1
CL
SCALE: N.T.S.2 PROPOSED DITCH CROSS SECTION
REFER SITE PLANS FOR DITCH
ELEVATION POINT TABLES
4:1
NOTES:
1. CONTRACTOR TO TAKE NOTE OF ANY PONDING ON SITE DURING
CONSTRUCTION AND ADD FILL TO AVOID PONDING ISSUES THROUGHOUT SITE.
2. CONTRACTOR TO COORDINATE WITH CITY TO PERFORM GRADING AND
DRAINAGE IMPROVEMENTS ONLY AFTER REMOVAL OF EXISTING GENERATOR
ROOM FROM SITE.
ADD GRADING FILL AROUND
TOWER LEGS (TYP)
7.
6.
647.5
ELEV = 646.40
SW
AL
E
.4
5% SW
AL
E
.9
5%
SWALE @ 0.51%
ELEV = 647.68
ELEV = 647.53
ELEV = 647.40
ELEV = 647.65
-1
7-
ROOF MANWAY
ROOF LADDER
W/ SAFETY DEVICE
BALCONY W/
HANDRAIL
(SEE 4/S-02)
RISER ROD
TOWER LADDER
W/ SAFETY DEVICE
STRUT & RISER ROD
RISER
SHELL MANWAY
INLET/OUTLET PIPE
CITY LOGOS
(SEE 1 AND 2/C-07)
BLAST AND RECOAT
TANK EXTERIOR
INCLUDING PIPING
AND APPURTENANCES
MATERIAL LOSS ON
ACCESS TUBE
TO BE PATCHED
(SEE 3/C-06)
ROOF VENT
12-IN OVERFLOW PIPE
FAA LIGHTING
(SEE 4/C-07)
OVERFLOW WEIR
GROUND ELEV = 647'
H E
IG
H
T
TO
H
IG
H W
A
TE
R L
E V
E L
9' -6
TA
N
K P
LA
N
A N
D E
LE
V
A
TI
O N
C-05
SCALE: N.T.S.3 TANK ELEVATION SCHEMATIC VIEW
NOTE:
1. ELEVATION VIEW SHOWN IS SCHEMATIC ONLY, AND DOESN'T
REPRESENT ACTUAL TANK.
1.
M G
G
LE
N V
IL
LE
E
LE
V A
TE
D
W A
TE
R
S
TO
R A
G E
T A
N K
R E
H A
B
IL
IT
A
TI
O
N
ROOF VENT
ROOF MANWAY
SCALE: N.T.S.1 ROOF PLAN SCHEMATIC VIEW
SCALE: N.T.S.2 FLOOR PLAN SCHEMATIC VIEW
ROOF LADDER
W/ SAFETY DEVICE
BLAST AND RECOAT
TANK INTERIOR
INCLUDING PIPING
AND APPURTENANCES
REPAIR/REPLACE RUSTED
AND/OR CORRODED BOLTS
AND NUTS IN KIND (TYP ALL
TOWER LEGS)
(SEE 1/C-06)
BLAST AND RECOAT
TANK INTERIOR
INCLUDING PIPING
AND APPURTENANCES
PROPOSED
FAA LIGHTING
-1
7-
M G
G
LE
N V
IL
LE
E
LE
V A
TE
D
W A
TE
R
S
TO
R A
G E
T A
N K
R E
H A
B
IL
IT
A
TI
O
N
TA
N
K P
H O
TO
S
C-06
REPAIR/REPLACE CORRODED BOLTS AND NUTS WITH1 EXISTING TOWER LEG
REMOVE AND REPLACE FLAP VALVE WITH WITH 24" CLEARANCE (SEE 3/C-07)2 EXISTING OVERFLOW PIPE
REPAIR HOLE PER STRUCTURAL DETAILS6 EXISTING DRY RISER ACCESS TUBE
3 EXISTING TANK INTERIOR LADDER
REPLACE MOV WITH CONTROL VALVE (SEE 5/C-07)9 EXISTING 20" INLET/OUTLET MOV
NOTES:
1. PHOTOGRAPHS ARE INTENDED TO ILLUSTRATE CONDITIONS THE CONTRACTOR MAY ENCOUNTER DURING CONSTRUCTION.
2. CONTRACTOR TO FIELD VERIFY THE ACCURACY OF EVERY ELEMENT SHOWN IN THE PHOTOGRAPHS. CONDITIONS OF TANK
AND ELEMENTS MAY HAVE CHANGED SINCE PHOTOS WERE TAKEN.
3. THE PHOTOGRAPHS SHOWN DO NOT INCLUDE ALL ITEMS ASSOCIATED WITH THE PROJECT SCOPE AND ARE NOT TO SCALE.
REPLACE PIPING AS NECESSARY TO ACHIEVE LAY
NEEDED FOR CONTROL VALVE - COORDINATE WITH MFR.
BLAST AND RECOAT PER SPECIFICATION4 EXISTING WET ACCESS TUBE CEILING
BLAST AND RECOAT PER SPECIFICATION7 EXISTING INTERIOR DUCTILE IRON PIPE
BLAST AND RECOAT PER SPECIFICATION8 EXISTING INTERNAL VAPOR ZONE
BLAST AND RECOAT PER SPECIFICATION10 EXISTING ROOF ACCESS HATCH
REDUCE GAP BELOW TOE BOARD TO 1/4" OR LESS FOR ALL TOE BOARD5 EXISTING ROOF AND HANDRAIL
INSTALL TOE BOARD ON ALL INTERMEDIATE LADDER LANDING HANDRAILS11 EXISTING LADDER INTERMEDIATE LANDING
REDUCE GAP
IN TOE BOARD
(SEE 4/S-02)
10% OR GREATER MATERIAL LOSS IN KIND
REPLACE IN PLACE (SEE 4/C-07)12 EXISTING FAA LIGHTING
REPLACE FAA
LIGHTING IN PLACE
REUSE EXIST
METAL PLATE
-1
7-
M G
G
LE
N V
IL
LE
E
LE
V A
TE
D
W A
TE
R
S
TO
R A
G E
T A
N K
R E
H A
B
IL
IT
A
TI
O
N
C
IV
IL
D
E
TA
IL
S
C-07
N.T.S.1 TANK LOGO DETAIL
NOTE:
1. REFER TO CITY OF RICHARDSON BRAND GUIDELINES IN
APPENDIX C OF THE CONTRACT DOCUMENTS FOR
ADDITIONAL DETAILS ON THE CITY LOGOS TO BE APPLIED
TO THE TANK.
2. COORDINATE LOGO SIZE, DETAILS, AND ORIENTATION
WITH CITY COMMUNICATIONS DEPARTMENT PRIOR TO
INSTALLATION.
3. SUBMIT PROPOSED LOGO DETAIL FOR APPROVAL PRIOR
TO INSTALLATION.
SCALE: N.T.S.2 LOGO ORIENTATION DETAIL
CENTER
LOGO
CE
NT
ER
LO
G O
N O
R
TH
90°
EAST
CENTER
LO
G
O
30°
30°
LOGO
LOGO
LOGO
SCALE: N.T.S.3 OVERFLOW PIPING AND SPLASHPAD DETAIL
EXIST SPLASH PAD REMOVE AND
REPLACE FLAP VALVE
REINSTALL PRESSURE
GAUGE ON EXISTING PIPE
NEW FLAP VALVE TO
HAVE MINIMUM 24"
CLEARANCE
NOTE:
1. DETAIL IS FOR REFERENCE ONLY.
2. CONTRACTOR SHALL COORDINATE THE PLACEMENT OF THREE
LOGOS WITH THE OWNER TO ENSURE DESIRED LOCATIONS.
3. SEE ELEVATION FOR MAXIMUM SIZE (HEIGHT) OF LOGOS.
PROP PIPE BEND
SCALE: N.T.S.4 OBSTRUCTION LIGHT DETAIL
TWR LIGHTING
OBSTRUCTION LIGHT
LED OL2 FAA
TYPE L-810
TWR LIGHTING
TRANSFER RELAY
TWR LIGHTING
PHOTOCELL-AIM EYE
NORTH
REPLACE MOUNTING
BRACKET IN PLACE
INSTALL TO
EXISTING METAL PLATE
NOTE:
1. REPLACE EXIST OBSTRUCTION LIGHTING IN PLACE
2. REUSE EXISTING CIRCUIT
3. REFER SPECIFICATION 26 55 61
EXIST FLANGED DIP
PROPOSED DIP
PROPOSED ELECTRONIC INTERFACE
AND ALTITUDE CONTROL VALVE
(SEE SPECIFICATION 22 10 00)
EXIST DISMANTLING JOINT
EXIST 20" BFV
EXIST PIPE
SUPPORT
EXIST PIPE
SEE NOTE 1
SCALE: N.T.S.5 ELECTRONIC INTERFACE AND ALTITUDE CONTROL VALVE
NOTE:
1. CONFIRM DIP LENGTH REQUIRED BASED ON ELECTRONIC
INTERFACE AND ALTITUDE CONTROL VALVE LENGTH FROM MFR.
2. ALL EXISTING PIPING AND VALVING TO REMAIN IN VALVE VAULT TO
BE COATED PER SPECIFICATIONS.
3. ALL PROPOSED PIPING AND VALVING TO BE NSF 61 CERTIFIED.
-1
7-
M G
G
LE
N V
IL
LE
E
LE
V A
TE
D
W A
TE
R
S
TO
R A
G E
T A
N K
R E
H A
B
IL
IT
A
TI
O
N
S
TR
U C
TU
R
A L
D E
TA
IL
S
O F
S-01
11/16/2026
(E) FLOOR PLATE
(E) TOE PLATE
(E) MIDRAIL
(E) HANDRAIL
REPAIR HANDRAIL TO ENSURE NO
GAP LARGER THAN 14" BETWEEN
TOE PLATE AND WALKWAY
(E) = EXISTING
1.
M G
G
LE
N V
IL
LE
E
LE
V A
TE
D
W A
TE
R
S
TO
R A
G E
T A
N K
R E
H A
B
IL
IT
A
TI
O
N
S
TR
U C
TU
R
A L
D E
TA
IL
S
O F
S-02
11/16/2026
File details come from the government source that posted it. Updated .