Improving Lake Superior outflow regulation and quantifying uncertainty
Closed Posted
- Opportunity number
- W81EWF-26-SOI-0004
- Agency
-
Engineer Research and Development Center
US Army Corps of Engineers, Department of Defense
- Applications due
- Award size
- Up to $200,000
Opportunity facts
- Assistance listings
- Funding instrument
- Cooperative Agreement
- Category
-
- Science and Technology and other Research and Development
- Eligible applicants
-
- Other
Opportunity details come from Grants.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers Engineer Research and Development Center seeks proposals to conduct a comprehensive uncertainty analysis for new outflow rating equations associated with a critical water control structure on Lake Superior. The primary deliverable is a quantified uncertainty band for discharge rates corresponding to various gate openings and water levels, with results integrated into the Large Lake Statistical Water Balance Model for consistency with existing Great Lakes operational models. Applicants must demonstrate a well-defined plan for collaborative integration with the University of Michigan modeling team developing the new rating equations, and the work must be completed within a 12-month performance period to support an upcoming regulatory study. Evaluation criteria emphasize technical merit of the proposed research, potential relationship to Department of Defense missions, and demonstrated capacity to integrate efforts with ongoing University of Michigan research. The opportunity employs a two-phase application process, with Statements of Interest due June 4, 2026 at 2:00 PM Central Time, followed by full proposal submissions due July 6, 2026 at 2:00 PM Central Time.
The total program funding is $400,000 with an estimated award ceiling of $200,000 per award, with the government anticipating three federal awards. Awards will be structured as cooperative agreements with a five-year performance period and are 100% federally funded with no cost-sharing requirement. Eligibility is restricted to non-federal partners of the Great Lakes Northern Forest Cooperative Ecosystems Studies Unit (CESU), with a negotiated indirect rate of 17.5% applicable to awards. Work will be performed at recipient institutions in collaboration with University of Michigan researchers, with quarterly reporting requirements and compliance obligations as specified in 2 CFR 200.
Synopsis
A. The U.S. Army Corps of Engineers (USACE) invites proposals for a project to conduct a comprehensive uncertainty analysis for new outflow rating equations associated with a critical water control structure on Lake Superior. The primary focus of this funding opportunity is to enhance the accuracy and reliability of discharge measurements, which are fundamental to the effective management of the Great Lakes system under the Lake Superior Regulation Plan. The base task, along with both options, are all tasks that are related to improving Lake Superior outflow regulation. However, these tasks are not interdependent. The base, option 1 and option 2, are simply a priority given to these tasks if funding should be available.
Task 1:
Current operational procedures for the structure's gates include partially open settings that are not accounted for in historical rating equations. To address this, new rating equations are currently under development by a team at the University of Michigan using advanced physical and computational fluid dynamics (CFD) modeling. A key requirement for a successful proposal under this announcement is a well-defined plan for the awardee to work collaboratively and integrate their efforts with the existing University of Michigan modeling team. This partnership will be essential to ensure the resulting uncertainty analysis is robust and directly applicable to the new ratings. The principal outcome of this work will be a quantified uncertainty band for discharge rates corresponding to various gate openings and water levels. The uncertainty analysis should use the publicly available Large Lake Statistical Water Balance Model, so the uncertainty values are consistent with already operational uncertainty models for all other components of the Great Lakes water balance. This task will require a 12 month performance period so the results can be used in an upcoming study.
Depending on availability of funding, the U.S. Army Corps of Engineers may award the following optional work:
Task 2:
The development and calibration of a high-fidelity hydrodynamic model of the St. Marys River built using the Delft3D FM suite. The scope of this model be the entire St Marys River from Point Iroquois on Lake Superior to the outlet of the River near Detour Village on Lake Huron. The domain shall include the North Channel of Lake Huron to Little Current Ontario but exclude connections to Georgian Bay. The model will be fully three-dimensional, focus on the St Marys Rapids and be able to incorporate the rating equations and uncertainty analysis proposed above. Delft3D FM must be used as the United States Government as well as partners at Environment Climate Change Canada both have access to this modeling suite. The United States Government will provide water level and velocity data to calibrate the model as well as computational resources.
Successful projects will deliver technically sound uncertainty metrics that can be immediately integrated into USACE operational models, contributing to improved ecological outcomes and more effective water resource management. As well as the ability to provide scopes of work for the additional tasks should they be funded.
Files
| File | Type | Posted |
|---|---|---|
| FOA_W81EWF-26-SOI-0004 (Lake Superior Reg).pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar grant opportunities
- Ask GovTribe AI about this opportunity