Basinwide & Basin States Salinity Control Programs

Closed Posted

Opportunity number
BOR-UC-17-F003
Agency
Applications due
Award size
Not on record

Opportunity facts

Funding instrument
Cooperative Agreement
Category
  • Environment
Eligible applicants
  • Other

Opportunity details come from Grants.gov. Updated .

Synopsis

The Colorado River Basin Salinity Control Program (Salinity Control Program) was designed to meet the objectives of the Colorado River Basin (Basin) Water Quality Standards. These standards include a Plan of Implementation to limit further degradation of water quality in the Colorado River that provides water to southern California, Arizona, Nevada, and New Mexico. The objective of the Salinity Control Program has been to minimize salt loading in the Colorado River system by seeking cost-effective regional solutions to the problem. The Bureau of Reclamation solicits, ranks, and selects new Salinity Control Projects based on a competitive process open to the public. Cooperative agreements are awarded with selected applicants. Projects have typically involved converting unlined canals and ditches to pipelines located in the Upper Basin States of Utah, Colorado, New Mexico, and Wyoming to reduce seepage that picks up salt and carries it into the Colorado River system. Reclamation also utilizes the services of state agencies in the states of Colorado, Utah, and Wyoming, to assist in funding cost-effective activities to reduce salinity in the Colorado River system.

Eligibility

Basinwide Program: A legal entity that is the owner or operator of the features to be replaced and/or to be constructed and capable of contracting with Reclamation. Basin States Program (BSP): A legal entity or individual that is owner or operator of the features to be replaced and/or to be constructed and capable of contracting with the state in which it is located - Utah, Colorado, or Wyoming. Both: Propose projects that are located in the Colorado River Basin above the Hoover Dam. Be responsive to the FOA requirements. Only use proven technology. Not be of a nature that creates undue financial risk for Reclamation. Be in an area where salt load can be provided. Provide sufficient pressure and appropriate velocity where topography enables it to allow for the future installations of high efficiency on-farm improvements (i.e. sprinkler systems).

Files

File Type Posted
FOA Number BOR-UC-17-F003 AMENDED.docx DOCX document
WWDO Concurrence Letter.pdf PDF
UDAF Concurrence Memo.pdf PDF
StateRepSignatureLetter .pdf PDF
NM ISC Concurrence Memo.pdf PDF
CSCB Concurrence Memo.pdf PDF
Applicant Signature Approval Letter.docx DOCX document
Electronic Application Form.docx DOCX document
Cost Estimate Sheet - Budget Table Appendix D.xlsx XLSX spreadsheet
Appendix C - Enable On-Farm Worksheet.xlsx XLSX spreadsheet
APPENDIX E Salt Load Reduction Worksheet (1).docx DOCX document
Salt Load Reduction Table.docx DOCX document
Appendix C - Enable On-Farm Worksheet.xlsx XLSX spreadsheet
Cost Estimate Sheet - Budget Table Appendix D.xlsx XLSX spreadsheet
APPENDIX E - Salt Load Reduction Table.xlsx XLSX spreadsheet
Applicant Signature Approval Letter.docx DOCX document
Electronic Application Form.docx DOCX document
APPENDIX E Salt Load Reduction Worksheet.docx DOCX document
oppBOR-UC-17-F003-instructions.docx DOCX document
oppBOR-UC-17-F003.pdf PDF
FOA Number BOR-UC-17-F003.docx DOCX document
Show all 21

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar grant opportunities
  • Ask GovTribe AI about this opportunity