APPENDIX E Salt Load Reduction Worksheet (1).docx

DOCX document 122 KB Posted

Attached to
Basinwide & Basin States Salinity Control Programs Federal grant opportunity
Opportunity number
BOR-UC-17-F003
Issued by
Department of the Interior

About this file

Salt Load Reduction 2

View the file

Other files for this federal grant opportunity

Other files attached to Basinwide & Basin States Salinity Control Programs, newest first.
File Type Posted
FOA Number BOR-UC-17-F003 AMENDED.docx DOCX document
WWDO Concurrence Letter.pdf PDF
UDAF Concurrence Memo.pdf PDF
StateRepSignatureLetter .pdf PDF
NM ISC Concurrence Memo.pdf PDF
CSCB Concurrence Memo.pdf PDF
Applicant Signature Approval Letter.docx DOCX document
Electronic Application Form.docx DOCX document
Cost Estimate Sheet - Budget Table Appendix D.xlsx XLSX spreadsheet
Appendix C - Enable On-Farm Worksheet.xlsx XLSX spreadsheet
Salt Load Reduction Table.docx DOCX document
Appendix C - Enable On-Farm Worksheet.xlsx XLSX spreadsheet
Cost Estimate Sheet - Budget Table Appendix D.xlsx XLSX spreadsheet
APPENDIX E - Salt Load Reduction Table.xlsx XLSX spreadsheet
Applicant Signature Approval Letter.docx DOCX document
Electronic Application Form.docx DOCX document
APPENDIX E Salt Load Reduction Worksheet.docx DOCX document
oppBOR-UC-17-F003-instructions.docx DOCX document
oppBOR-UC-17-F003.pdf PDF
FOA Number BOR-UC-17-F003.docx DOCX document
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bureau of Reclamation Colorado River Basinwide and Basin States Salinity Control Programs Salt Load Reduction Worksheet

Funding Opportunity Announcement

FOA # BOR-UC-17-F003

Colorado River Basinwide and Basin States Salinity Control Programs

BOR-UC-17-F003APPENDIX E – SALT LOAD REDUCTION
BOR-UC-17-F003APPENDIX E – SALT LOAD REDUCTION

Funding opportunity announcement (FOA) The Bureau of Reclamation, Upper Colorado Region, will be soliciting applications for reducing salinity contributions to the Colorado River through a Funding Opportunity Announcement (FOA) that will open August 14, 2017, and close November 14, 2017. Such applications may propose measures to reduce salinity contributions originating from saline springs, leaking wells, irrigation sources, municipal and industrial sources, erosion of public and private land, or other sources in the upper basin of the Colorado River. Anyone interested in submitting an application in the upcoming FOA should contact the appropriate Reclamation Technical Contact listed in Section B.

SECTION A: INSTRUCTIONS FOR COMPLETING THE SALT LOAD REDUCTION WORKSHEET (WORKSHEET)

All potential applicants must obtain salt load reduction estimates by completing a Worksheet and submitting it to Reclamation for review prior to submission of their application.

Worksheet submittal instructions & Schedule Completed Worksheets shall be submitted to the Salinity Program Manager with a copy to the appropriate Technical Contact listed in Section B. Reclamation will process requests on a first-come first-served basis and will provide a salt load reduction estimate once the FOA has been released. The salt load reduction estimates will be provided in a letter from the Salinity Program Manager.

The schedule and deadlines for Worksheet submittals will be specified in the FOA document. It is anticipated that for a single project, applicants will be allowed an initial submittal and one revised submittal for a total of two submittals of the Worksheet. Though Reclamation will not provide official salt load reduction estimates prior to release of the FOA, applicants are encouraged to submit the Worksheet prior to the release of the FOA. Early submissions allow Reclamation to begin processing the salt load reduction estimate and provide responses as soon as possible following the release of the FOA. Applicants should be aware that submittals may require 30 or more calendar days to process.

Applicants are encouraged to submit the Salt Load Reduction Worksheet as early as possible following the release of the FOA, especially if applicants anticipate submitting a revised version of the Salt Load Reduction Worksheet. Final submissions of Salt Load Reduction Worksheet must be received by Reclamation no later than October 2, 2017. Electronic submission of the Salt Load Reduction Worksheet by email is acceptable.

Proposed salinity control Irrigation delivery system improvements Prior to preparing the responses for the Worksheet, applicants proposing salinity control projects through irrigation delivery system improvements should contact the appropriate Reclamation Technical Contact listed in Section B to learn if salt load reduction estimates are available for your area. Salt load reduction estimates for agricultural areas can only be provided where Reclamation has been able to make estimates from Reclamation, Natural Resources Conservation Service (NRCS), or United States Geological Survey (USGS) salinity studies. For proposed salinity control projects through irrigation delivery system improvements, applicants must complete and submit the Worksheet including Part D.1 of the Background & Information section describing the facilities to be improved or replaced and Appendix B detailing the facility data. Describe plans for abandoning any facilities. If the project plan does not remove or fill in the canal please describe why this will be left open. (Leaving a ditch/canal open will decrease the salt loading and will increase cost effectiveness) Other Types of Salinity Control Applications for other types of salinity control (non-irrigation related) will be accepted for evaluation in the FOA. Applicants proposing other types of salinity control must complete and submit the Worksheet including Part D.2 of the Background & Information section and Appendix C. The Worksheet is to include relevant information and data regarding the salinity source and proposed salinity control process and must quantify the salt load reduction. Reclamation will review the information regarding the salinity source and control process and may request additional information. In the a response letter to the applicant, Reclamation will either confirm and accept the applicant’s estimated salt load reduction or provide a revised estimate based on Reclamation’s analysis of the information.

Water impoundment structures This section contains special provisions for applications involving new pond or reservoir construction.

It is allowable to include the construction of a new pond or reservoir in a salinity control proposal if that structure is needed for the operation of a piped irrigation water delivery system or for other essential purposes. Justification for the pond or reservoir must be provided in the application. To be acceptable the design and construction must meet standards developed by Reclamation. The standards are aimed at providing the impoundment structure liner and other components sufficient to last for the life of the entire project (50 years if coupled with buried pipelines) and that they are built to acceptable standards. Applicants contemplating a new pond or reservoir can obtain these standards from the appropriate Technical Contact listed in Section B. A successful applicant’s funding agreement will require a complete Reclamation review and approval of the proposed design, specification, and construction standards.

Additional seepage will likely occur from the new pond or reservoir and must be accounted for in the application’s overall salt load reduction estimate. This seepage must be identified and multiplied by the appropriate local salt loading rate to estimate new salt loading which will then be deducted from the application’s total salt load reduction estimate. Applicants proposing new water impoundment structures as part of a salinity control project must obtain a salt load reduction estimate from Reclamation by completing and submitting the Salt Load Reduction Worksheet.

- RECLAMATION SALINITY TECHNICAL CONTACTS

Colorado River Basin Salinity Control Program Manager

Mr. Kib Jacobson 125 South State Street, Room 8100 Salt Lake City, UT 84138 Phone: 801-524-3753 Email: kjacobson@usbr.gov

Western Colorado & Southwest Colorado, New Mexico, and Arizona

Mr. John Sottilare
Bureau of Reclamation
445 West Gunnison Ave Suite 221
Grand Junction CO 81501-5711
Phone: 970-248-0640

Email: jsottilare@usbr.gov

Eastern Utah and Western Wyoming

Mr. Ben Radcliffe
Bureau of Reclamation
302 East 1860 South
Provo UT 84606
Phone: 801-379-1213
Email: bradcliffe@usbr.gov

Colorado River Basinwide and Basin States Salinity Control Programs

PROJECT NAME & LOCATION

Applicant Name

Date requestor information

This worksheet may only be submitted by the owner/operator of the facilities proposed to be improved or constructed. The owners may, at their discretion, designate an engineering/consulting company or individual as their representative by formally notifying the Salinity Program Manager and appropriate Technical Contact (see Section B). Salt load reduction estimates will be provided directly to the Entity Manager with a copy to any designated representative.

A.
REQUESTING ENTITY NAME:

City/town, State

Response:

B.
PROJECT NAME:

Response:

C.
WORKSHEET PREPARED BY:

Response:

D.
ENTITY MANAGER CONTACT INFORMATION:

Name:

Title:

Address:

Telephone:

Fax:

E-mail:

E.
ENGINEER CONTACT INFORMATION (if applicable):

Name:

Title:

Address:

Telephone:

Fax:

E-mail:

BACKGROUND & INFORMATION FOR SALT LOAD REDUCTION ESTIMATE

In order to obtain salt load reduction estimates FOR FOA APPLICATIONS, THis WORKSHEET must be submitted TO THE salinity program manager with a copy to the APPROPRIATE RECLAMATION TECHNICAL CONTACT (Listed IN SECTION B).

Provide a brief narrative or tabular data responding to each of the following sections that apply to the proposed salinity control project. All information must be entered into the response boxes provided in the application, with the exception of data tables which may be inserted in Appendix B. Additional instructions for completing this worksheet are provided in Section A. (It is important to confer with or contact the appropriate Technical Contact listed in Section B, prior to preparing the responses for this worksheet)

A.
BACKGROUND & DESCRIPTION OF PROJECT AREA: Describe project setting and geographic location. For irrigation-related applications, include general hydrology, geology, soils, climate (average rainfall, temperature, and growing season), water storage facilities, existing irrigation facilities (total mileage of canals & laterals and number of users), irrigated acreage, types of crops, etc.

Response:

B.
PROJECT MAP(S): Attach a detailed map(s) as Appendix A scaled appropriately to easily identify the project area, existing facilities, and major geographic features including roads, streams, reservoirs, towns, etc. If the proposed project is irrigation related, the map should show locations of canals, laterals, and irrigated lands and land ownership (Federal, state, Tribal, private etc). Those canals or laterals proposed for improvement or abandonment under this application should be identified. Existing lined or piped sections of canals or laterals should also be clearly identified.
C.
WATER RIGHTS AND SUPPLY: Describe the water rights for both diversion and storage. Describe irrigation water supply and water shortages.

Response:

D.
DESCRIPTION OF PROPOSED SALINITY CONTROL: Describe proposed process or changes (in parts D.1, D.2, or D.3) anticipated by the proposed project that will lead to salt load reductions to the Colorado River system. This would include improvements to or elimination of existing facilities or operations. Describe plans for abandoning any facilities. If the project plan does not remove or fill in the canal please describe why this will be left open. (leaving a ditch/canal open will raise cost effectiveness) If the application does not contemplate changes in one of the three categories below, please indicate by entering “NA” or “Not Applicable”.
D.1
IRRIGATION DELIVERY SYSTEM (CANALS, LATERALS, DITCHES) IMPROVEMENTS: If specific facilities are to be improved or replaced, include a detailed description of the facilities and complete Appendix B.

Response:

D.2
OTHER TYPES OF SALINITY CONTROL (NON-IRRIGATION RELATED): For desalinization, evaporation or other salinity control measures, clearly describe the proposed project, identify the salinity sources and quantify the salt (in tons/year) that will be controlled or eliminated. Include data that defines the salt loading and control in tabular format in Appendix C.

Response:

D.3

NEW WATER IMPOUNDMENT STRUCTURES: If new ponds, reservoirs, settling basins, or other water impoundment structures are to be constructed for any purpose (e.g., re-regulation, evaporation pond, etc.) as part of this application, address the requirements listed in Section A.2.C. If the size of a proposed or existing water impoundment structure increases later a new salt load calculation will be developed and funding may be reduced and/or the application ranking may change. Modifications to the structures would require Reclamation review and approval of the proposed design, specification, and construction standards”.

Response:

APPENDIX A. PROJECT MAPS

APPENDIX B:

EXISTING IRRIGATION DELIVERY FACILITIES DATA SHEET (Use required format) (Please click on word icon for the Salt Load Reduction Table)

APPENDIX C: SUPPLEMENTAL DATA TABLES AND/OR DATA FOR OTHER TYPES OF SALINITY CONTROL (NON IRRIGATION RELATED) image2.emf

Salt Load Reduction Table.docx Item

Units

Identify individual canal, lateral, or ditch

(Insert name here)

Length of existing canal/lateral/ditch feet

Irrigated acreage served acres

Irrigation season

Average diversion flow cfs

Average seasonal diversion ac-ft

Average no. of days water carried days

Non-irrigation season (stockwater)

Average diversion flow cfs

Average seasonal diversion ac-ft

Average no. of days water carried days

Length of ditch carrying winter water feet

Describe EXISTING lined or piped sections

Lined length (see Note 3) feet

Liner type (concrete, earth, etc)

See

Note 1

Year installed year

Liner condition

See

Note 2

Piped length (see Note 3) feet

Remaining unlined/unpiped length feet

Unlined Length to be replaced/improved feet

Existing piped/lined Length to be replaced/improved feet

Proposed replacement material pressurized pipe, non-pressurized pipe, or liner

Notes:

1. Type of liner may be concrete, earth (clay), membrane or other (please specify).

2. Condition of liner should be rated as poor, satisfactory, good.

3. Disregard dispersed piped or concrete lined segments with individual lengths of less than 100 feet image1.wmf