Z2LZ--Resurface and Stripe Parking Lot at Fort Thomas, KY. Project #539-23-201
Closed Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- 36C25023B0046
- Agency
-
Veterans Integrated Service Network 10
Veterans Health Administration, Department of Veterans Affairs
- Responses due
- Set-aside
- Service-Disabled Veteran-Owned Small Business
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Place of performance
- Fort Thomas Cincinnati Vamc Fort Thomas, Kentucky 41075, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This pre-solicitation notice seeks bids for a construction project to resurface and re-stripe the parking lot at the Fort Thomas Division of the Cincinnati VA Medical Center located in Fort Thomas, Kentucky. The Department of Veterans Affairs seeks to award a contract to complete repairs, resurfacing, and re-striping of the existing parking lot and adjacent sidewalk areas in four phases to minimize disruption for patients and employees. Bids are due by May 5, 2023 and the period of performance is 90 calendar days from notice to proceed. Evaluation will prioritize minimizing disruption and maintaining access during work.
The opportunity is set aside for Service-Disabled Veteran-Owned Small Businesses. The project involves repairing and resurfacing approximately 150 parking spaces and will utilize NAICS codes 237310 for highway, street, and bridge construction and PSC code C211 for construction of buildings and structures. No incumbent or budget is listed, but the work is divided into four phases to be completed within 90 days to repair, resurface, and re-stripe the VA medical center parking areas while maintaining operations.
Notice text
STATEMENT OF WORK (SOW)
Fort Thomas Division (Cincinnati VAMC)
1000 S. Ft Thomas Ave
Ft Thomas, Kentucky 41075
1. Contract Title. Project # 539-23-201 Resurface and Stripe Parking Lot at Fort Thomas, Kentucky.
2. Background. The chosen contractor shall provide complete construction services including labor, materials, equipment, and supervision required to complete Project# 539-23-201 Resurface and Stripe Parking Lot at Fort Thomas, Kentucky for the Cincinnati VAMC. This project will consist of repairing, resurfacing, and re-striping the existing Fort Thomas, Kentucky parking lot and adjacent sidewalk areas while adhering to the appropriate design guide requirements. Fulfillment of this project will further enhance a professional appearance, curb appeal, visibility of parking lines and improve the maneuverability and safety for the veteran patients and employees at the Fort Thomas facility.
3. Place of Performance. The project work will occur at the Fort Thomas Division, 1000 S. Ft Thomas Ave, Ft Thomas, Kentucky 41075 specifically within the existing on-site parking lot location.
4. Scope. The Resurface and Stripe Parking Lot at Fort Thomas project will include, but is not limited to, various repairs, milling, removal/replacement and crack filling of the existing parking lot, adjacent curbs & sidewalk areas at the Fort Thomas location of the Cincinnati VAMC. This work is divided into the following four (4) phases:
Phase 1 Site Repairs
Phase 2 Entrance Resurfacing
Phase 3 North Parking Resurfacing
Phase 4 South Parking Resurfacing.
This construction project requires general contracting, demolition of existing conditions and safety and security for successful completion.
5. Specific Tasks. A general summary of tasks involved with this project are listed below by phase as currently documented in the project drawings & specifications. The intent of this phasing is to minimize impact on patients and employees throughout the course of this project. For a full and complete understanding of all required work to be completed under this project, carefully read through all aspects of the project drawings and specifications.
Note 1: Contractor to field verify measurements and quantities of all items needed to complete this project. Utilize drawing plans as guides for planning and striping parking lot once repairs & resurfacing have been completed.
Note 2: Any requirements listed in the project solicitation documentation that are unclear to the contractor or requires further clarification are to be documented and submitted via Request for Information (RFI) to be formally answered by the project s CO/COR.
Phase 1 Site Repairs: This phase will include small site repairs including curb ramp reconstruction, concrete sidewalk milling, concrete sidewalk removal & replacement, concrete pavement removal & replacement, and concrete sidewalk milling/crack filling. Work shall be performed in such a manner to minimize disruption to the VA patients and employees. Patient and employee access to the building shall be maintained at all times. Contractor to provide detour signage around road or sidewalk closures. This phase may not be construction concurrently with any other phase.
Phase 2 Entrance Resurfacing. This phase will include the resurfacing and repairs to the main entrance drop off and access roadways. Work shall be performed in such a manner to minimize disruption to the VA patients and employees. Patient and employee access to the building shall be maintained at all times. Contractor to provide detour signage around road closures. This phase may not be constructed concurrently with Phases 3 or 4.
Phase 3 North Parking Resurfacing. This phase will include the resurfacing and repairs of the northern portion of the onsite parking lot. Work shall be performed in such a manner to minimize disruption to the VA patients and employees. Patient and employee access to the building shall be maintained at all times. Contractor to provide detour signage around road closures. This phase may not be constructed concurrently with Phases 2 or 4.
Phase 4 South Parking Resurfacing. This phase will include the resurfacing and repairs of the southern portion of the onsite parking lot. Work shall be performed in such a manner to minimize disruption to the VA patients and employees. Patient and employee access to the building shall be maintained at all times. Contractor to provide detour signage around road closures and provide a dedicated pedestrian detour. This phase may not be constructed concurrently with Phases 2 or 3.
Deducts. It is the intent of the VA to award a contract to complete the full scope of work as defined by the project drawings and specifications. However, if available funding is insufficient to match the construction bids received for the full project scope of work, the following items have been identified as deduct alternates as noted on the project drawings and specifications:
1. Deduct #1: Elimination of work related to select areas of sidewalk removal and replacement.
2. Deduct #2: Elimination of work related to the removal and replacement of accessible concrete curb ramps.
6. Performance Monitoring. Construction contract supervision will be conducted by the Project Section of Engineering Service at the Cincinnati VA Medical Center. Inspection will be made throughout the project and delivery and installation.
7. Security Requirements. None.
8. Government-Furnished Equipment (GFE)/Government-Furnished Information (GFI). None.
9. Other Pertinent Information or Special Considerations
A. Identification of Possible Follow-on Work. None.
B. Identification of Potential Conflicts of Interest (COI). None.
C. Identification of Non-Disclosure Requirements. None.
D. Packaging, Packing and Shipping Instructions. None
E. Inspection and Acceptance Criteria. Project COR to conduct the final acceptance of satisfactory installation.
10. Period of Performance. Total Period of Performance: 90 calendar days from the effective date of the notice to proceed.
11. Technical/Administrative Requirements. Contracted work shall be conducted in accordance with the below VA Specifications.
Support features for each room can be found within U.S. Department of Veterans Affairs Office of Construction & Facilities Management Technical Information Library.
This resource provides information regarding construction specifications, construction procedures, design manuals, design guides, room finishes, and door/hardware schedules which should be followed throughout the administration of this contract.
12. Additional Info. The above SOW constitutes a basic outline of work required for this project but does not include all details required for the design, construction, and completion of this project. A pre-construction walkthrough and inspection of current conditions is recommended to determine all needs and requirements prior to starting the project.
Files
| File | Type | Posted |
|---|---|---|
| 36C25023B0046.docx | DOCX document |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Z2LZ--Resurface & Stripe Parking Lot at Fort Thomas 539-23-201 | Award Notice | |
| Z2LZ--Resurface and Stripe Parking Lot at Fort Thomas, KY. Project #539-23-201 | Solicitation | |
| This notice | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Z1DA--528A5-27-504 Seal and Stripe Parking Lots | Veterans Integrated Service Network 2 | No set-aside | |
| Z1LZ--Re-slurry and Re-stripe Bldg. 88 and 98 Parking Lots | Veterans Integrated Service Network 21 | No set-aside | |
| Y1DA--Project 596A4-26-105 - Construction to Repair Parking Garage Structural Concrete | Veterans Integrated Service Network 9 | Service-Disabled Veteran-Owned Small Business | |
| Z2DA--612A4-27-018 | Replace B650 3rd and 2nd Flooring | Veterans Integrated Service Network 21 | Service-Disabled Veteran-Owned Small Business | |
| Z2DA--657-24-102JC - Prepare Site for New PET/CT, Room A011D | Veterans Integrated Service Network 15 | Service-Disabled Veteran-Owned Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity