- NAICS code
- 238160 Roofing Contractors
- Place of performance
- Tennessee Valley Healthcare System, VA Medical Center, 1310 24th Avenue South Nashville, Tennessee 37212, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of Veterans Affairs, Veterans Health Administration is seeking construction services to repair the Acre North Stairwell at the Tennessee Valley Healthcare System, VA Medical Center in Nashville, TN under Project #626-24-509. The contractor shall furnish all labor, material, equipment, and supervision necessary to restore the stairwell to original condition due to water damage and wear, including installation of new drywall, tile floors, door, electrical, lighting, rust inhibitor, and painting. The period of performance is 32 calendar days from the Notice to Proceed, with a one-year warranty on all work and materials, and a two-year warranty on flooring. The contractor must adhere to specific requirements regarding work hours, safety, badging, waste removal, and inspections.
This is a set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB). The response date is June 11, 2024 at 10:30am Central Time. No potential incumbents or current contractors are named, and the award value or budget range is not specified.
Notice text
STATEMENT OF WORK
Department of Veterans Affairs TVHS, Nashville Campus
Requirements for Construction Services
Project 626-24-509
Repair Acre North Stairwell
GENERAL INFORMATION
Title of Project: Project# 626-24-509 Repair Acre North Stairwell
Scope of Work: The contractor shall furnish all labor, material, equipment, and supervision necessary to accomplish the work for this project. This project shall restore the stairwell to original condition due to water damage and wear. The work will include but is not limited to installation of new drywall, tile floors, door, electrical outlet, conduit, lighting fixtures, rust inhibitor, and paint to complete the project, to the satisfaction of the VA and COR. Relating to Project# 626-24-509 Repair Acre North Stairwell at the Tennessee Valley Healthcare System, VA Medical Center, 1310 24th Avenue South, Nashville, TN 37212.
3. Statement of Bid Item(s):
Base Bid: Complete Project 626-24-509 Repair Acre North Stairwell in strict accordance with the specifications and drawings at the Tennessee Valley Healthcare System, VAMC, 1310 24th Avenue South, Nashville, TN 37212.
Period of Performance: 32 calendar days from the issuance of the Notice to Proceed to complete the work.
GENERAL REQUIREMENTS
All work, including materials, shall have a one-year warranty, or as noted in project specifications. Flooring shall have a minimum of a two-year warranty.
Contractor shall paint entire stairwell.
Contractor shall repair damaged drywall, underside of damaged landings, and underside of damage staircases.
Contractor shall paint damaged staircases and landings with rust-inhibitor.
Contractor shall paint exposed metal studs with rust-inhibitor.
Contractor shall replace flooring on all stairway landings.
Stairwell shall have a level 3 finish.
Contractor shall replace damaged lighting fixtures.
Contractor shall provide submittals for items to COR and CO 2 weeks before the start of work.
Medical Center normal working hours are Monday thru Friday from 6 a.m. to 5:00 p.m. On-site work time shall be managed to minimize the effect on the medical center and Acre building operations.
Portions of work that require shutdowns, noise, vibration, chemicals or interrupt adjacent service operations will be performed from 5:00 p.m. to 7:00 a.m. On weekends the work can be performed between 6:00 p.m. Friday to 9:00 p.m. Sunday.
Before evening and weekend work begins, the project schedule shall be submitted by the contractor and approved by the VA COR 72 hours in advance of the work being performed.
The contractor will coordinate all work in advance with the VA COR.
The prime contractor s superintendent will always be on-site during the performance of the work associated with this contract.
When using furnish , provide , install , or similar term is used regarding all labor, materials, and equipment to perform the job it shall mean a complete installation that is ready for use.
The contractor shall identify all employees that will be working under the awarded contract. The contractor personnel shall include employees, sub-contractors, suppliers, and delivery personnel entering the medical center. Those employees shall bring one photo ID and the second form of state /federally issued id to obtain a VA Contractor identification badge. This badge must always be worn above the belt while on medical center property. The contractor s employees shall return all I.D. badges to designated personnel at the end of the period of performance of the contract. Lost badges will result in a surcharge.
The contractor's safety manager is responsible for safety inspections of all contract operations and will be identified to the contractor. All VA and OSHA safety regulations shall be observed during the performance of work identified on this contract. Provide signage and barricades, as required, to maintain safety and protection of work around the project work site. Daily safety reports shall be provided to the COR each day.
The contractor shall visit the job site to thoroughly familiarize themselves with all the details of this work and working conditions. The contractor shall also verify all dimensions in the field and shall advise the CO and COR of any discrepancy before performing any work. The contractor shall be responsible for the coordination and proper relation of his work to the building, structure, phasing, ensuring the safety of employees, and workmen.
The contractor shall not allow smoking in any building or vehicle or connex (located on VA property) and shall ensure employees do not smoke on VA property. This is a smoke free facility.
The contractor will take adequate precautions to protect all adjacent equipment, concrete pads, and walkways in the work area from spills, drips, runs, and damage from the use of power tools.
The general contractor will be provided one (1) parking space. Employees can park in designated areas if available. Paid parking is available in adjacent Vanderbilt parking garages. Drivers should be particularly concerned with pedestrian traffic and yield to pedestrians. Seat Belt use is mandatory on all VA grounds.
The Contractor shall always keep the work area and stored materials/equipment(s) areas free from the accumulation of waste materials. The Contractor shall remove from the work and premises any rubbish, tools, scaffolding, equipment, and materials that are not the property of the Government. This includes the area around the dumpster/Connex. Material stored on-site shall be organized and inside a conditioned storage space. Materials shall not be stored on connex.
Equipment (building service equipment and systems) shall be provided by nationally recognized manufacturers that produce and distribute mechanical products across the United States for over 5 years. Manufacturers must have local vender representatives.
When fixture/devices are being removed, remove all appurtenances related or connected to the items being removed or demolished. Utilities shall be removed back to the source or active main/branch. Do not leave any abandoned utilities/lines or dead-end lines. Final verification required by COR before covering up connection.
The type of controls throughout project work shall be consistent. Controls must be of the same manufacturer and type.
Contractor shall conduct investigative analysis prior to starting work to get an accurate assessment.
Due to space limitations, the contractor will have space for one small dumpster. A space for a small connex may become available, but it will be determined by the COR. For equipment/material that is no longer needed and/or waste, the contractor is responsible for their proper and daily removal. Staging area location will be determined by the COR.
There is only one final inspection at the end of the project, contractor shall request a final inspection two weeks after providing a certified inspection report (in writing), and a copy of their completed and corrected QA inspection. At the time of the request there shall be no incomplete work.
When work is not being performed, the first floor of the stairwell shall remain accessible and usable for emergency situations unless coordinated with VA COR 72 hours in advance.
Files
| File | Type | Posted |
|---|---|---|
| 36C24924B0010.docx | DOCX document |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Z2DA--Project# 626-24-509 Repair ACRE North Stairwell | Award Notice | |
| Z2DA--Project# 626-24-509 Repair ACRE North Stairwell | Solicitation | |
| This notice | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| TVHS AC VRF System Installation | Veterans Integrated Service Network 9 | Service-Disabled Veteran-Owned Small Business | |
| Z2DA--Renovate Space for Patient Care Improvements | Veterans Integrated Service Network 6 | Service-Disabled Veteran-Owned Small Business | |
| Z2DA--Repair & Replace Flooring in BLDG 10A | Veterans Integrated Service Network 7 | Total Small Business | |
| Building 13 Stair and Roof Replacement at Castle Point VAMC | Veterans Integrated Service Network 2 | Service-Disabled Veteran-Owned Small Business | |
| Z2DA--612A4-27-018 | Replace B650 3rd and 2nd Flooring | Veterans Integrated Service Network 21 | Service-Disabled Veteran-Owned Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity