Z2DA-- 618-23-102 Correct Electrical Deficiencies - MPLS *Design-Build*

Closed Pre-Solicitation Posted

This opportunity was awarded. See the award notice from , or the latest solicitation from .

Solicitation number
36C26324R0057
Agency
Veterans Integrated Service Network 23 Veterans Health Administration, Department of Veterans Affairs
Responses due
Set-aside
Service-Disabled Veteran-Owned Small Business

Opportunity facts

NAICS code
238210 Electrical Contractors and Other Wiring Installation Contractors
PSC
Z2DA Repair Or Alteration Of Hospitals And Infirmaries
Place of performance
Minneapolis VA Health Care System One Veterans Drive Minneapolis, Minnesota 55417, United States

Notice details come from SAM.gov. Updated .

About this opportunity

This pre-solicitation notice is for a two-phase design-build contract (36C26324R0057) issued by the Department of Veterans Affairs (VA) to correct electrical deficiencies at the Minneapolis VA Health Care System. The contract will require the selected contractor to provide all design, labor, materials, tools, equipment, and construction services necessary to modernize the main 13.8kV electrical utility switchgear and related infrastructure at the medical facility. The procurement will follow a two-phase design-build selection process in accordance with FAR Subpart 36.3, with Phase I responses due by April 5, 2024 and no more than four contractors moving forward to Phase II.

This opportunity is set aside for 100% Service-Disabled Veteran Owned Small Businesses (SDVOSB) under NAICS code 238210 (Electrical Contractors and Other Wiring Installation Contractors) with a $19 million small business size standard. The project magnitude is estimated between $2,000,000 and $5,000,000, with an anticipated completion of 542 calendar days for design and 343 calendar days for construction after the respective Notices to Proceed.

Notice text

Page 3 of 3

This is a Pre-Solicitation Notice regarding project: 618-23-102, Correct Electrical Deficiencies at the Minneapolis VA Health Care System (VAHCS), Minnesota. The Department of Veterans Affairs, Network Contracting Office 23 (NCO 23), is preparing to issue a solicitation for a Two-Phase Design-Build contract for this project.

Note: This is a Pre-Solicitation Notice only, the Solicitation will not be posted for at least 15 days from the date of this notice. This is NOT a request for proposal.

Estimated SOLICITATION DATE (Phase I): on or about 04/8/2024

Estimated AWARD DATE: 09/15/2024

SET-ASIDE: 100% Service-Disabled Veteran Owned Small Business (SDVOSB)

NAICS: 238210, Electrical Contractors and Other Wiring Installation Contractors

SMALL BUSINESS SIZE STANDARD: $19 million

PROJECT MAGNITUDE: $2,000,000 to $5,000,000

Project Overview

The project will require the selected contractor to provide all design, labor, materials, tools and equipment, and construction services necessary for the design and construction of the project:618-23-102 is to correct electrical deficiencies as defined by the Scope of Work (SOW).

The Two-Phase Design-Build solicitation and evaluation process shall be conducted in

accordance with Federal Acquisition Regulation (FAR) Subpart 36.3 (Two-Phase Design-Build

Selection Procedures). The issued RFP shall set forth the requirements for responding to Phase

I of the solicitation, as well as all technical evaluation factors and sub-factors for both Phase I

and Phase II.

At the closing date of the Phase I Solicitation, the government shall evaluate responsive

proposals received in response to Phase I of the solicitation. No more than four (4)

contractors will move forward to Phase II. Only those successful firms selected as a result of Phase I evaluations will be requested to submit technical and pricing proposals for Phase II. Phase II proposals shall be evaluated in accordance with the Phase II Evaluation Process.

Project Description

Background

The Minneapolis VA Medical Center is undertaking initiatives to improve utility Infrastructure systems for healthcare services. The Medical facility currently has two major infrastructure projects in-progress, Correct Electrical Deficiencies FY18 and EHRM Infrastructure upgrades. The power demands for new equipment and healthcare services are placing a heavy demand on the electrical system. Aging electrical equipment is susceptible to failure if the electrical utility infrastructure is not updated to keep up with the power demands from new equipment and healthcare services.

This Project, Correct Electrical Deficiencies FY23, will deliver utility infrastructure upgrades to the facilities main electrical utility switchgear which is aging. The main electrical utility switchgear provides power to the entire medical facility. This switchgear has been in operation since the medical facility first opened in 1988. The main electrical utility switchgear is housed at the boiler plant (Bldg. 69), located on the Medical Center Campus. The objective of this project is to modernize the main electrical utility switchgear which has aged and needs new replacement parts that are not procurable anymore and difficult to procure. In the past few years, failures have occurred to the main electrical utility switchgear. Outdated technology has proven to be an issue with isolating the FboNotice cause of the failure. Installation of new equipment with modern technology is introducing harmonic distortion into the electrical system. Harmonic distortion is causing bad power quality to be transmitted in the electrical system.

Modernizing the main electrical utility switchgear will replace the existing components with new modern technology capable of advanced metering and monitoring capabilities. Modernizing the main electrical utility switchgear would also help improve the quality of electrical power received from the local utility company before the power is transmitted to the Medical Center.

The requirement will be fulfilled by awarding a Firm-Fixed-Price contract for construction to Correct Electrical Deficiencies FY18 and EHRM Infrastructure upgrades at the Minneapolis (VAHCS).

Intent

Task 1 Modernize 13.8Kv electrical utility switchgear service including:

a. Replace ten (10) 1200amp Porcel-line Type DHP Magnetic Air circuit breakers. Provide an emergency spare 1200amp breaker. The emergency spare is to remain in the electrical room and available for emergencies.

b. Replace upper feeder relay compartment doors (11) with new doors and monitoring devices. Monitoring devices includes but is not limited to; fault protection devices, voltage relays, overcurrent relays, meters, switches, indicating lights and wire harnesses for each feeder section. The color of the new doors is to match the existing color of the switch gear.

c. Replace all feeder section CTx s and PTx s in the 13.8kv utility switchgear.

d. Conduct preventive maintenance to the 13.8kv utility feeder BUS assembly

e. Remove and demo all old components.

Task 2 Replace outdated substation, high voltage transformer, and feeder switchboard in Bldg. 69.

a. Remove and demo existing substation with new substation, high voltage transformer, and feeder switchboard.

b. Replace with new substation, high voltage transformer, and feeder switchboard.

c. Update incoming feed conductors to substation if necessary.

Task 3 Replace existing LeMarche battery charger and battery pack in Bldg. 69.

a. Remove and demo the existing single battery charger and battery system.

b. Replace with dual (2) battery chargers and 2 battery packs.

c. Arrange the new battery chargers to function as primary and secondary backup

sources.

Task 4 Utility Switchgear monitoring

a. Integrate VAMC 13.8kva electrical utility service to Engineering s Building Automation System, JCI or provide an alternate means of monitoring the utility switchgear activity in Building 70 of the main hospital.

Task 5 ATS sequencing

a. Correct ATS sequencing to transfer generator loads as prescribed by VA Electrical Design guide in the following order: 1. life safety, 2. critical, 3. Equipment

b. Balance loads to Emergency Generator set to improve the efficiency and synchronization of the Generator set.

Task 6 Replace degraded light bollards at the main entrance of the Medical Center.

a. Remove and demolish existing light bollards.

b. Replace with (VCBA) Voltaire Concrete Bollard Archi-linear LED type bollard.

Anticipated Period of Performance: The anticipated completion of this project is 542 calendar days after Notice to Proceed (NTP)to Design. The required completion of this project is 343 calendar days from the Notice to Proceed (NTP) with Construction. The time stated for completion includes final cleanup of the premises, as-builts and closeout documents.

Attachments

Files attached to this notice, newest first
File Type Posted
36C26324R0057.docx DOCX document

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Z2DA--618-23-102, Correct Electrical Deficiencies 36C26324C0080; PO 618C40304 Award Award Notice
Z2DA-- 618-23-102 Correct Electrical Deficiencies - MPLS *Design-Build* Latest solicitation Solicitation
Z2DA-- 618-23-102 Correct Electrical Deficiencies - MPLS *Design-Build* This notice · Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity