Yaskawa Motoman 6-Axis Robotics - RFQ Due 08/28 - Extension

Closed Solicitation Posted

Solicitation number
W15QKN-20-0086
Agency
ACC Picatinny Army Contracting Command, Department of Defense
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
333992 Welding and Soldering Equipment Manufacturing
PSC
AE34 R&D- Economic Growth: Manufacturing Technology (Engineering Development)
Place of performance
Picatinny Arsenal NJ 07806 USA

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation notice seeks quotes for a Motoman 6-axis robotic manufacturing cell to support Army manufacturing operations. The Department of the Army Materiel Command Contracting Command at Picatinny Arsenal requests delivery within 12 weeks of award of a robotic system including a Motoman 6-axis robot and controller, auxiliary equipment, safety features, and an operations console. Offerors must also provide installation, training at the OEM's facility, and an operators manual. Quotes will be evaluated based on technical acceptability of the quote to meet the requirements and price reasonableness. Quotes are due by August 21, 2020.

The opportunity is set aside for total small business and has a place of performance of Building 60 at Picatinny Arsenal in New Jersey. The NAICS code is 333512 and PSC code is J019. No incumbent or current contractor is identified. The solicitation does not provide award values or budget details but requests a single robotic cell with installation and training to be completed within 12 weeks.

Notice text

5 versions

Update #5 · Latest ·

*****Proposal due date has changed to 08/28****

Please see attached Request for Quote for the Motoman 6-axis Robotic Manufacturing Cell. Please note that all of Section J Attachments to the RFQ are included in this posting. It is requested that a quote is be returned by 4 PM est on 28 August 2020.

Please review attached notice for all vendors, that the Government intends to include the provision FAR 52.204-21 and the clause at FAR 52.204-25 in all contracts, task orders, delivery orders. The purpose of the letter is to  implement the Section 889(a)(1)(B) Prohibition on Contracting with Entities Using Certain Telecommunications and Video Surveillance Services or Equipment Clauses.

Please see below some questions and answers regarding the RFQ:

1.   You indicate 3 additional external motors. Are these motors for the 3 Axis robot positioner? 

Answer: We require a minimum of three (3) input and three (3) out controls for external devices/machines/peripherals.

2.  You mention a Schunk End Effector package.  Can you let us know what the tooling will be handling?  Size, weight, configuration etc.?

Answer: The contractor shall deliver a Schunk End Effector Package that includes standard tools for various operation. (i.e. different operations need different shapes.)

3.  On the 3 Axis Robot positioner.  Are you moving the 6-axis robot arm with this?  If so, I assume this is an overhead gantry type configuration.  Please confirm. 6 axis robot is on gantry

Answer: Yes.  6- axis robot with overhead configuration.

4. Do you have any tolerances or specification requirement for the Renishaw  CMM package?

Answer: No just standard tolerances tables will be bolted too floor.

5.  The application included additive manufacturing.  Is this a welding additive system? Welding is an additive but is not a standard IE settings for PLA.  If so, what welding system are you using?

Answer: Not using any welding machine only part move printer to printer or finish, place or rotate for inspection or completion. 

6.  The statement of work appears to be in reference to an existing layout, could you please provide that for us?

Answer:Space dimensions that gantry must fit in:  23' x 25' x 16.5' (W x L X H)

7.   We manufacture a few 2-axis positioners with the requested payload.  Please see below if either one of these would work?

Answer: I don't see the alternatives, but 6-axis robotic arm is required.

8. In 4.2.2 of the requirements in the SOW, do you mean "quantity", not "quality?" 

         Answer:     Yes Quantity.

 9. What size Motoman external motors are required?

             Answer: One tilt turn turntable 500 lbs limit

 10. Can we receive more details on the ATI Tool Changer Package and Schunk End Effector Packages? 

              Answer:Schunk tools PGN-plus-p 40-1,PGNPLUS 64-1-AS-P,PGN-PLUS-P50-1,DPZ-PLUS50-1AS,DPZ-PLUS80-2-AS,PZH-PLUS20,PZN-PLUS64-1-AS-P,GSM-P32-AS-E-180,GSM-P64-AS-E-180, ATI TSS TO support 9 tools ex post module, horizontal module, verical toolings interface plate, mounting module assembly, proximity sensors, tooling interface plate assembly

             

11. What are the required dimensions of the Ultra-flat heavy duty steel table?

         Answer:   34in X 48in X 30in

             

12.What is the size of the cell to help calculate the required safety fencing 

  Answer:37 linear feet of fence and 2 doors for room size 23ft x25ft plus.  Once door is for personnel to enter.  One door should be 8 foot roling door for equipment to enter.

13. Could you please tell me if this is a new requirement, or if there is a current or previous contractor who has performed similar services? If available, can you please send along the incumbent contract or task order number?

Answer: This is a new requirment. 

14. You indicate 3 additional external motors. Are these motors for the 3 Axis robot positioner?

Answer: We require a minimum of three (3) input and three (3) out controls for external devices/machines/peripherals.

15.Are these the Yaskawa motors that will drive the Overhead 3 axis Gantry; as add-on peripherals to the Motoman/Yaskawa Controller?

Answer: Overhead gantry shall be controlled with the DX200 Controller.

16.  On the 3 Axis Robot positioner.  Are you moving the 6-axis robot arm with this?  If so, I assume this is an overhead gantry type configuration.  Please confirm. 6 axis robot is on gantry

Answer: Yes.  6- axis robot with overhead configuration.

17. Overhead Gantry with X,Y,Z motion?

Answer:  Yes the Gantry shall have X,Y,Z motion and controlled by the DX200 software/controller.

18. Can we receive more details on the ATI Tool Changer Package and Schunk End Effector Packages?

Answer:

Schunk tools:

PGN-plus-p 40-1

PGNPLUS 64-1-AS-P

PGN-PLUS-P50-1

DPZ-PLUS50-1AS

DPZ-PLUS80-2-AS

PZH-PLUS20

PZN-PLUS64-1-AS-P

GSM-P32-AS-E-180

GSM-P64-AS-E-180

19.ATI TSS to support (9) tools ex post module, horizontal module, vertical toolings interface plate, mounting module assembly, proximity sensors, tooling interface plate assembly

EX Post Module– Does this mean Tool Buffer to hold the (9) Schunk EoAT’s

Answer:  Both Controller and Tool Stand must support 9 tools.  Controller configured for 9 tools.  Tool stand must hold 9 tools.

20. What are the required dimensions of the Ultra-flat heavy duty steel table?

Answer:   34in X 48in X 30in

21.“Ultra-Flat” – Blanchard Ground meet this requirement?  Or is there a specific “flatness” tolerance?

Answer:  Blanchard Ground should meet the requirement.

Update #4 ·

Please see attached Request for Quote for the Motoman 6-axis Robotic Manufacturing Cell. Please note that all of Section J Attachments to the RFQ are included in this posting. It is requested that a quote is be returned by 4 PM est on 26 August 2020.

Please review attached notice for all vendors, that the Government intends to include the provision FAR 52.204-21 and the clause at FAR 52.204-25 in all contracts, task orders, delivery orders. The purpose of the letter is to  implement the Section 889(a)(1)(B) Prohibition on Contracting with Entities Using Certain Telecommunications and Video Surveillance Services or Equipment Clauses.

Please see below some questions and answers regarding the RFQ:

1.   You indicate 3 additional external motors. Are these motors for the 3 Axis robot positioner? 

Answer: We require a minimum of three (3) input and three (3) out controls for external devices/machines/peripherals.

2.  You mention a Schunk End Effector package.  Can you let us know what the tooling will be handling?  Size, weight, configuration etc.?

Answer: The contractor shall deliver a Schunk End Effector Package that includes standard tools for various operation. (i.e. different operations need different shapes.)

3.  On the 3 Axis Robot positioner.  Are you moving the 6-axis robot arm with this?  If so, I assume this is an overhead gantry type configuration.  Please confirm. 6 axis robot is on gantry

Answer: Yes.  6- axis robot with overhead configuration.

4. Do you have any tolerances or specification requirement for the Renishaw  CMM package?

Answer: No just standard tolerances tables will be bolted too floor.

5.  The application included additive manufacturing.  Is this a welding additive system? Welding is an additive but is not a standard IE settings for PLA.  If so, what welding system are you using?

Answer: Not using any welding machine only part move printer to printer or finish, place or rotate for inspection or completion. 

6.  The statement of work appears to be in reference to an existing layout, could you please provide that for us?

Answer:Space dimensions that gantry must fit in:  23' x 25' x 16.5' (W x L X H)

7.   We manufacture a few 2-axis positioners with the requested payload.  Please see below if either one of these would work?

Answer: I don't see the alternatives, but 6-axis robotic arm is required.

8. In 4.2.2 of the requirements in the SOW, do you mean "quantity", not "quality?" 

         Answer:     Yes Quantity.

 9. What size Motoman external motors are required?

             Answer: One tilt turn turntable 500 lbs limit

 10. Can we receive more details on the ATI Tool Changer Package and Schunk End Effector Packages? 

              Answer:Schunk tools PGN-plus-p 40-1,PGNPLUS 64-1-AS-P,PGN-PLUS-P50-1,DPZ-PLUS50-1AS,DPZ-PLUS80-2-AS,PZH-PLUS20,PZN-PLUS64-1-AS-P,GSM-P32-AS-E-180,GSM-P64-AS-E-180, ATI TSS TO support 9 tools ex post module, horizontal module, verical toolings interface plate, mounting module assembly, proximity sensors, tooling interface plate assembly

             

11. What are the required dimensions of the Ultra-flat heavy duty steel table?

         Answer:   34in X 48in X 30in

             

12.What is the size of the cell to help calculate the required safety fencing 

  Answer:37 linear feet of fence and 2 doors for room size 23ft x25ft plus.  Once door is for personnel to enter.  One door should be 8 foot roling door for equipment to enter.

13. Could you please tell me if this is a new requirement, or if there is a current or previous contractor who has performed similar services? If available, can you please send along the incumbent contract or task order number?

Answer: This is a new requirment. 

14. You indicate 3 additional external motors. Are these motors for the 3 Axis robot positioner?

Answer: We require a minimum of three (3) input and three (3) out controls for external devices/machines/peripherals.

15.Are these the Yaskawa motors that will drive the Overhead 3 axis Gantry; as add-on peripherals to the Motoman/Yaskawa Controller?

Answer: Overhead gantry shall be controlled with the DX200 Controller.

16.  On the 3 Axis Robot positioner.  Are you moving the 6-axis robot arm with this?  If so, I assume this is an overhead gantry type configuration.  Please confirm. 6 axis robot is on gantry

Answer: Yes.  6- axis robot with overhead configuration.

17. Overhead Gantry with X,Y,Z motion?

Answer:  Yes the Gantry shall have X,Y,Z motion and controlled by the DX200 software/controller.

18. Can we receive more details on the ATI Tool Changer Package and Schunk End Effector Packages?

Answer:

Schunk tools:

PGN-plus-p 40-1

PGNPLUS 64-1-AS-P

PGN-PLUS-P50-1

DPZ-PLUS50-1AS

DPZ-PLUS80-2-AS

PZH-PLUS20

PZN-PLUS64-1-AS-P

GSM-P32-AS-E-180

GSM-P64-AS-E-180

19.ATI TSS to support (9) tools ex post module, horizontal module, vertical toolings interface plate, mounting module assembly, proximity sensors, tooling interface plate assembly

EX Post Module– Does this mean Tool Buffer to hold the (9) Schunk EoAT’s

Answer:  Both Controller and Tool Stand must support 9 tools.  Controller configured for 9 tools.  Tool stand must hold 9 tools.

20. What are the required dimensions of the Ultra-flat heavy duty steel table?

Answer:   34in X 48in X 30in

21.“Ultra-Flat” – Blanchard Ground meet this requirement?  Or is there a specific “flatness” tolerance?

Answer:  Blanchard Ground should meet the requirement.

Update #3 ·

Please see attached Request for Quote for the Motoman 6-axis Robotic Manufacturing Cell. Please note that all of Section J Attachments to the RFQ are included in this posting. It is requested that a quote is be returned by 4 PM est on 26 August 2020.

Please see below some questions and answers regarding the RFQ:

1.   You indicate 3 additional external motors. Are these motors for the 3 Axis robot positioner? 

Answer: We require a minimum of three (3) input and three (3) out controls for external devices/machines/peripherals.

2.  You mention a Schunk End Effector package.  Can you let us know what the tooling will be handling?  Size, weight, configuration etc.?

Answer: The contractor shall deliver a Schunk End Effector Package that includes standard tools for various operation. (i.e. different operations need different shapes.)

3.  On the 3 Axis Robot positioner.  Are you moving the 6-axis robot arm with this?  If so, I assume this is an overhead gantry type configuration.  Please confirm. 6 axis robot is on gantry

Answer: Yes.  6- axis robot with overhead configuration.

4. Do you have any tolerances or specification requirement for the Renishaw  CMM package?

Answer: No just standard tolerances tables will be bolted too floor.

5.  The application included additive manufacturing.  Is this a welding additive system? Welding is an additive but is not a standard IE settings for PLA.  If so, what welding system are you using?

Answer: Not using any welding machine only part move printer to printer or finish, place or rotate for inspection or completion. 

6.  The statement of work appears to be in reference to an existing layout, could you please provide that for us?

Answer:Space dimensions that gantry must fit in:  23' x 25' x 16.5' (W x L X H)

7.   We manufacture a few 2-axis positioners with the requested payload.  Please see below if either one of these would work?

Answer: I don't see the alternatives, but 6-axis robotic arm is required.

8. In 4.2.2 of the requirements in the SOW, do you mean "quantity", not "quality?" 

         Answer:     Yes Quantity.

 9. What size Motoman external motors are required?

             Answer: One tilt turn turntable 500 lbs limit

 10. Can we receive more details on the ATI Tool Changer Package and Schunk End Effector Packages? 

              Answer:Schunk tools PGN-plus-p 40-1,PGNPLUS 64-1-AS-P,PGN-PLUS-P50-1,DPZ-PLUS50-1AS,DPZ-PLUS80-2-AS,PZH-PLUS20,PZN-PLUS64-1-AS-P,GSM-P32-AS-E-180,GSM-P64-AS-E-180, ATI TSS TO support 9 tools ex post module, horizontal module, verical toolings interface plate, mounting module assembly, proximity sensors, tooling interface plate assembly

             

11. What are the required dimensions of the Ultra-flat heavy duty steel table?

         Answer:   34in X 48in X 30in

             

12.What is the size of the cell to help calculate the required safety fencing 

  Answer:37 linear feet of fence and 2 doors for room size 23ft x25ft plus.  Once door is for personnel to enter.  One door should be 8 foot roling door for equipment to enter.

13. Could you please tell me if this is a new requirement, or if there is a current or previous contractor who has performed similar services? If available, can you please send along the incumbent contract or task order number?

Answer: This is a new requirment. 

Please review attached notice for all vendors, that the Government intends to include the provision FAR 52.204-21 and the clause at FAR 52.204-25 in all contracts, task orders, delivery orders. The purpose of the letter is to  implement the Section 889(a)(1)(B) Prohibition on Contracting with Entities Using Certain Telecommunications and Video Surveillance Services or Equipment Clauses.

Update #2 ·

Please see attached Request for Quote for the Motoman 6-axis Robotic Manufacturing Cell. Please note that all of Section J Attachments to the RFQ are included in this posting. It is requested that a quote is be returned by 4 PM est on 26 August 2020.

Please see below some questions and answers regarding the RFQ:

1.   You indicate 3 additional external motors. Are these motors for the 3 Axis robot positioner? 

Answer: We require a minimum of three (3) input and three (3) out controls for external devices/machines/peripherals.

2.  You mention a Schunk End Effector package.  Can you let us know what the tooling will be handling?  Size, weight, configuration etc.?

Answer: The contractor shall deliver a Schunk End Effector Package that includes standard tools for various operation. (i.e. different operations need different shapes.)

3.  On the 3 Axis Robot positioner.  Are you moving the 6-axis robot arm with this?  If so, I assume this is an overhead gantry type configuration.  Please confirm. 6 axis robot is on gantry

Answer: Yes.  6- axis robot with overhead configuration.

4. Do you have any tolerances or specification requirement for the Renishaw  CMM package?

Answer: No just standard tolerances tables will be bolted too floor.

5.  The application included additive manufacturing.  Is this a welding additive system? Welding is an additive but is not a standard IE settings for PLA.  If so, what welding system are you using?

Answer: Not using any welding machine only part move printer to printer or finish, place or rotate for inspection or completion. 

6.  The statement of work appears to be in reference to an existing layout, could you please provide that for us?

Answer:Space dimensions that gantry must fit in:  23' x 25' x 16.5' (W x L X H)

7.   We manufacture a few 2-axis positioners with the requested payload.  Please see below if either one of these would work?

Answer: I don't see the alternatives, but 6-axis robotic arm is required.

8. In 4.2.2 of the requirements in the SOW, do you mean "quantity", not "quality?" 

         Answer:     Yes Quantity.

 9. What size Motoman external motors are required?

             Answer: One tilt turn turntable 500 lbs limit

 10. Can we receive more details on the ATI Tool Changer Package and Schunk End Effector Packages? 

              Answer:Schunk tools PGN-plus-p 40-1,PGNPLUS 64-1-AS-P,PGN-PLUS-P50-1,DPZ-PLUS50-1AS,DPZ-PLUS80-2-AS,PZH-PLUS20,PZN-PLUS64-1-AS-P,GSM-P32-AS-E-180,GSM-P64-AS-E-180, ATI TSS TO support 9 tools ex post module, horizontal module, verical toolings interface plate, mounting module assembly, proximity sensors, tooling interface plate assembly

             

11. What are the required dimensions of the Ultra-flat heavy duty steel table?

         Answer:   34in X 48in X 30in

             

12.What is the size of the cell to help calculate the required safety fencing 

  Answer:37 linear feet of fence and 2 doors for room size 23ft x25ft plus.  Once door is for personnel to enter.  One door should be 8 foot roling door for equipment to enter.

Update #1 ·

Please see attached Request for Quote for the Motoman 6-axis Robotic Manufacturing Cell. Please note that all of Section J Attachments to the RFQ are included in this posting. It is requested that a quote is be returned by 4 PM est on 21 August 2020.

 

Attachments

Files attached to this notice, newest first
File Type Posted
Temp Enc 2 - FAR 52.204-26.docx DOCX document
Temp Enc 1 - Federal Register 2020-15293.pdf PDF
Temp Enc 3 - FAR 52.204-24.docx DOCX document
QASP_RoboticArm.docx DOCX document
Attachment 0004 - Non-Disclosure and Non-Use Agreement.doc DOC document
Attachment 0001 - Quality Assurance Requirements.pdf PDF
W15QKN20Q0086- Motoman Request for Quote (8-4-2020).pdf PDF
Attachment 0005 - Additional Solicitation Requirements.docx DOCX document

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Yaskawa Motoman 6-Axis Robotics - RFQ Due 08/28 - Extension This notice · Latest solicitation Solicitation
Yaskawa Motoman 6-Axis Robotics Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity