Y1DZ--NRM project 662-22-702 EHRM NextGen WIFI Final AP Installation MACC Group 1
Closed Solicitation Posted
- Solicitation number
- 36C26123R0053
- Agency
-
Veterans Integrated Service Network 21
Veterans Health Administration, Department of Veterans Affairs
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
Notice details come from SAM.gov. Updated .
Notice text
2 versions
Update #2 · Latest ·
36C26123R0053 EHRM NextGen WIFI Final AP Installation
The government is in receipt of the below Request for Information (RFIs). The below RFI s were submitted in writing and in a timely manner, prior to the deadline specified on RFP 36C26123R0053. The RFIs are answered and hereby incorporated into the RFP and distributed to ensure Fair Opportunity for all interested vendors.
Question No. 1 Will each access point require one or two CAT6A cable?
Answer: One Cat6A per access point.
Question No. 2 Are there any requirements for line voltage? Will any electrical work be required in IT/Server rooms?
Answer: Power for the AP is via POE (Power Over Ethernet). No electrical work is required in the IT/Server room.
Question No. 3 - Are there any RCP as-built available?
Answer: AutoCAD is available and will be made available to awardee.
Question No. 4 - Box 10 it states that an offer guarantee is required, but box 13b has checked that an offer guarantee is not required. Please clarify if a bid bond is required.
Answer: Solicitation is amended to reflect a bid guarantee is not required, however payment bond is required for contracts greater than $35,000. Successful contractor shall submit payment bond within ten (10) calendar days of notice of award.
Question No. 5 Please provide reflected ceiling drawings for the buildings that have the (16) new AP s installation.
Answer: Drawings will be provided to the awardee.
Questions No. 6 Are the AP units VA provided? If not, please provide brand and model. Answer: AP units are provided and will be installed by the VA.
Question No. 7 Please provide the total amount of cores that are needed to bring the cabling to a different floor level.
Answer: Contractor shall assume 9 out of the 16 would require cores.
Update #1 ·
None
Files
| File | Type | Posted |
|---|---|---|
| 36C26123R0053 0001.docx | DOCX document | |
| Encl 1 Pricing Breakdown TORFP Proj 662-22-702 NexGen WiFi.docx | DOCX document | |
| 36C26123R0053.docx | DOCX document | |
| Encl 2 REQUEST FOR INFORMATION RFI FORM.docx | DOCX document | |
| Atch 4 Wage Determination CA20230018 San Fran County.pdf | ||
| Atch 2 Specifications 662-NexGen WIFI.pdf | ||
| Atch 1 Drawings and Floor Plans.pdf | ||
| Atch 3 Wage Determination CA20230007 Sonoma.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Solicitation | |
| Y1DZ--NRM project 662-22-702 EHRM NextGen WIFI Final AP Installation MACC Group 1 | Pre-Solicitation |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity