Y- FTFA043000 FY17 advanced munitions technology complex

Closed Special Notice Posted

This opportunity was awarded. See the award notice from .

Solicitation number
W91278-17-R-0029
Agency
ENDIST Mobile US Army Corps of Engineers, Department of Defense
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
236220 Commercial and Institutional Building Construction
Place of performance
Eglin Afb Fl 32542 USA

Notice details come from SAM.gov. Updated .

Notice text

1. Notice of Pre-Advertisement Meeting: Firms/business entities interested in Project Number FTFA043000 FY17 ADVANCED MUNITIONS TECHNOLOGY COMPLEX, EGLIN AIR FORCE BASE, FL, are invited to participate in a- Pre-Advertisement informational meeting at the University of Florida (UF) Research & Engineering Education Facility (REEF), 1350 N. Poquito Road, Shalimar, FL to be held Wednesday March 29, 2017 commencing at 9:00 a.m.

2. The Government is interested in building awareness of the upcoming solicitation for construction of the Advanced Munitions Technology Complex (AMTC) at Eglin Air Force Base (AFB), FL. This project requires the construction of eight primary facilities for development of nano energetic/explosive technologies and the development, integration, rapid prototyping, and fielding of advance munitions. The buildings incorporate reinforced concrete construction and concrete masonry units (CMU) with a combination of CMU split face veneer, metal panel system, pre-cast panels, and translucent fiberglass panel system in clerestory applications for the exterior of the facility; superflat floors; flat roof systems consisting of white PVC membrane over tapered insulation and a concrete deck; and earth berm (with shotcrete top slab) covered operational and storage bunkers. The design incorporates explosives safety, anti-terrorism force protection (AT/FP) physical security, and life safety requirements, as well acoustic and vibration mitigation techniques. Mitigation of explosive effects, including blast, thermal and fragment hazards, is provided with hardened reinforced concrete framing and steel fragment shields. Blast doors include single-swing to sliding doors, for intentional detonation or accidental detonation, to meet blast loading, response criteria, minimum fragment shield thickness, and seal requirements.

LEED Silver certification is required for the AMTC campus with the objective to reduce total ownership cost through long-term energy performance, conservation of potable water and resources, reduced maintenance and operating costs, and a healthy and productive work environment. Project site work includes clearing, cut/fill, grading, security fence, storm water drainage, utilities, and pavements. Mechanical systems include individual chiller plants, condensing type, gas-fired boilers, single duct variable air volume air handling units, with direct digital control (DDC) system. Plumbing systems include domestic hot and cold water, natural gas, sanitary sewer, industrial waste, storm, compressed air, purge gas generator system, ODCA (oxygen depleted compressed air) gas generator system, vacuum systems, as well as process cooling water chillers, split DX systems, and low pressure steam for process heating and humidification. Electrical systems include power, lighting, communication/Data, audio visual, intrusion detection system, access control system, and lightning protection. Fire protection systems include new fire water distribution system (with central fire pump house), fire alarm with mass notification (including strobes, beacons, horns, and audible notification) and fire sprinkler system (wet sprinkler and ultra-high-speed deluge systems). "

Construction duration is estimated to be approximately eight hundred eighty (880) calendar days. Contractors shall have capability of performing construction similar to this project, prepare detailed project schedules, and conduct intensive coordination with government to execute construction in the vicinity of explosives maintaining distance from explosives quantity-distance arcs.

3. Small Businesses, Service-Disabled Veteran-Owned Small Businesses, 8(a), WOSB, EDWOSB and Hubzone small businesses will have the opportunity to reach out to prospective prime contractor proposers for teaming/subcontracting opportunities.

The approximate cost range of this work is $25,000,000 to $100,000,000.

The NAICS code related to this work is 236220.

There is no charge to participate.

TO BE ELIGIBLE TO ATTEND THE PRE-ADVERTISEMENT MEETING, FIRMS/BUSINESS ENTITIES ARE REQUIRED TO REGISTER TO ATTEND BY REGISTRATION ON https://www.eventbrite.com/e/pre-advertisement-meeting-for-fy-17-advance-munitiions-technology-complex-tickets-32660599733?aff=utm_source%3Deb_email%26utm_medium%3Demail%26utm_campaign%3Dnew_event_email&utm_term=eventurl_text

Contracting Office Address:
Attn: CESAM-CT
109 Saint Joseph Street
Mobile, Alabama
United States 36602

Place of Performance:
1350 N. Poquito Road
Shalimar, FL
United States

Primary Points of Contact:
Antonia S. Ortiz, PE, PMP
Project Manager
Antonia.s.ortiz@usace.army.mil
Phone: 251-690-2708

Linda L. Spadaro,
Deputy, Small Business Programs
Linda.L.Spadaro@usace.army.mil
Phone: 251-690-3597

Attachments

Files attached to this notice, newest first
File Type Posted
17-R-0029_Pre-Solicitation_List_of_Attendees.pdf PDF
17-R-0029_Pre-Solicitation_Q&As.pdf PDF
17-R-0029_Pre-Solicitation_Presentation.pdf PDF

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Advanced Munitions Technology Complex Award Award Notice
Y- FTFA043000 FY17 advanced munitions technology complex This notice · Latest special notice Special Notice

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity