XB443-0. 4 Bartlett AOP Culvert Replacement over Tributary to Albany Brook

Award Notice Posted

Solicitation number
12148418R0002
Agency
Awarded
to John Khiel III Logging & Chipping, Inc.
Set-aside
Total Small Business

Opportunity facts

Contract number
12148418C0004 Federal contract award
NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Not on record
Place of performance
From the intersection of Bear Notch Road and US 302 in Bartlett, New Hampshire, travel south on Bear Notch Road for approximately 1.8 miles. Turn west onto Nfsr XB443 and drive for approximately 2.0 miles. Bartlett, New Hampshire, United States

Notice details come from SAM.gov. Updated .

Notice text

7 versions

Update #7 · Latest ·

Added: May 20, 2019 11:53 am. Awarded Vendors: JOHN KHIEL III LOGGING CHIPPING INC. Contract Award Dollar Amount: $311,041.09. Contract Award Date: 2018-07-05.

Update #6 ·

The Forest Service is soliciting bids to complete the removal and replacement of a culvert on National Forest System Road (NFSR) XB443, over a tributary to Albany Brook in Bartlett, NH within the White Mountain National Forest, Bartlett Experimental Forest.

The contractor(s) shall provide all expertise, labor, supervision, services, equipment, tools, supplies, permits, coordination with utilities, transportation, and incidentals necessary to perform the roadway repairs and other associated minor activities. The desired outcome is in strict accordance with the standards attached to this solicitation and adherence to the contract awarded. The awarded contract shall constitute the entire agreement including all terms and conditions applicable to the contract.


Work shall be completed as shown in the drawings, maps and specifications as referenced or included in this contract. Work includes, but is not limited to soil erosion and sediment control, excavation, embankment, select borrow and surface gravel haul and placement, removal of obstructions, steel reinforced concrete placement, riprap placement, structural plate-arch installation, streambed simulation, installation of guardrail, and seeding and mulch.


Pre-bid Tour - April 18, 2018 @ 10:00 am - From the intersection of Bear Notch Road and US 302 in Bartlett, New Hampshire, travel south on Bear Notch Road for approximately 0.7 miles to road gate. Meeting will start at gate. Questions and answers from the pre-bid tour will be posted to the solicitation.


THE BID DUE DATE HAS CHANGED - PROPOSALS ARE DUE AT 2:00 PM MAY 17TH, 2018. REVISED Q & AS ARE ATTACHED

.

Update #5 ·

The Forest Service is soliciting bids to complete the removal and replacement of a culvert on National Forest System Road (NFSR) XB443, over a tributary to Albany Brook in Bartlett, NH within the White Mountain National Forest, Bartlett Experimental Forest.

The contractor(s) shall provide all expertise, labor, supervision, services, equipment, tools, supplies, permits, coordination with utilities, transportation, and incidentals necessary to perform the roadway repairs and other associated minor activities. The desired outcome is in strict accordance with the standards attached to this solicitation and adherence to the contract awarded. The awarded contract shall constitute the entire agreement including all terms and conditions applicable to the contract.


Work shall be completed as shown in the drawings, maps and specifications as referenced or included in this contract. Work includes, but is not limited to soil erosion and sediment control, excavation, embankment, select borrow and surface gravel haul and placement, removal of obstructions, steel reinforced concrete placement, riprap placement, structural plate-arch installation, streambed simulation, installation of guardrail, and seeding and mulch.


Pre-bid Tour - April 18, 2018 @ 10:00 am - From the intersection of Bear Notch Road and US 302 in Bartlett, New Hampshire, travel south on Bear Notch Road for approximately 0.7 miles to road gate. Meeting will start at gate. Questions and answers from the pre-bid tour will be posted to the solicitation.


THE BID DUE DATE HAS CHANGED - PROPOSALS ARE DUE AT 2:00 PM MAY 17TH, 2018.  REVISED Q&AS ARE ATTACHED

Update #4 ·

The Forest Service is soliciting bids to complete the removal and replacement of a culvert on National Forest System Road (NFSR) XB443, over a tributary to Albany Brook in Bartlett, NH within the White Mountain National Forest, Bartlett Experimental Forest.

The contractor(s) shall provide all expertise, labor, supervision, services, equipment, tools, supplies, permits, coordination with utilities, transportation, and incidentals necessary to perform the roadway repairs and other associated minor activities. The desired outcome is in strict accordance with the standards attached to this solicitation and adherence to the contract awarded. The awarded contract shall constitute the entire agreement including all terms and conditions applicable to the contract.


Work shall be completed as shown in the drawings, maps and specifications as referenced or included in this contract. Work includes, but is not limited to soil erosion and sediment control, excavation, embankment, select borrow and surface gravel haul and placement, removal of obstructions, steel reinforced concrete placement, riprap placement, structural plate-arch installation, streambed simulation, installation of guardrail, and seeding and mulch.


Pre-bid Tour - April 18, 2018 @ 10:00 am - From the intersection of Bear Notch Road and US 302 in Bartlett, New Hampshire, travel south on Bear Notch Road for approximately 0.7 miles to road gate. Meeting will start at gate. Questions and answers from the pre-bid tour will be posted to the solicitation.


THE BID DUE DATE WILL NOT CHANGE - PROPOSALS ARE DUE AT 2:00 PM MAY 4TH, 2018. PICTURES OF THE SITE ARE ATTACHED.

.

Update #3 ·

The Forest Service is soliciting bids to complete the removal and replacement of a culvert on National Forest System Road (NFSR) XB443, over a tributary to Albany Brook in Bartlett, NH within the White Mountain National Forest, Bartlett Experimental Forest.

The contractor(s) shall provide all expertise, labor, supervision, services, equipment, tools, supplies, permits, coordination with utilities, transportation, and incidentals necessary to perform the roadway repairs and other associated minor activities. The desired outcome is in strict accordance with the standards attached to this solicitation and adherence to the contract awarded. The awarded contract shall constitute the entire agreement including all terms and conditions applicable to the contract.


Work shall be completed as shown in the drawings, maps and specifications as referenced or included in this contract. Work includes, but is not limited to soil erosion and sediment control, excavation, embankment, select borrow and surface gravel haul and placement, removal of obstructions, steel reinforced concrete placement, riprap placement, structural plate-arch installation, streambed simulation, installation of guardrail, and seeding and mulch.


Pre-bid Tour - April 18, 2018 @ 10:00 am - From the intersection of Bear Notch Road and US 302 in Bartlett, New Hampshire, travel south on Bear Notch Road for approximately 0.7 miles to road gate. Meeting will start at gate. Questions and answers from the pre-bid tour will be posted to the solicitation.


THE BID DUE DATE WILL NOT CHANGE - PROPOSALS ARE DUE AT 2:00 PM MAY 4TH, 2018.  PICTURES OF THE SITE ARE ATTACHED.

Update #2 ·

The Forest Service is soliciting bids to complete the removal and replacement of a culvert on National Forest System Road (NFSR) XB443, over a tributary to Albany Brook in Bartlett, NH within the White Mountain National Forest, Bartlett Experimental Forest.

The contractor(s) shall provide all expertise, labor, supervision, services, equipment, tools, supplies, permits, coordination with utilities, transportation, and incidentals necessary to perform the roadway repairs and other associated minor activities. The desired outcome is in strict accordance with the standards attached to this solicitation and adherence to the contract awarded. The awarded contract shall constitute the entire agreement including all terms and conditions applicable to the contract.


Work shall be completed as shown in the drawings, maps and specifications as referenced or included in this contract. Work includes, but is not limited to soil erosion and sediment control, excavation, embankment, select borrow and surface gravel haul and placement, removal of obstructions, steel reinforced concrete placement, riprap placement, structural plate-arch installation, streambed simulation, installation of guardrail, and seeding and mulch.


Pre-bid Tour - April 18, 2018 @ 10:00 am - From the intersection of Bear Notch Road and US 302 in Bartlett, New Hampshire, travel south on Bear Notch Road for approximately 0.7 miles to road gate. Meeting will start at gate. Questions and answers from the pre-bid tour will be posted to the solicitation.


SOLICITATION WILL BE POSTED ON MARCH 30TH, 2018

.

Update #1 ·

The Forest Service is soliciting bids to complete the removal and replacement of a culvert on National Forest System Road (NFSR) XB443, over a tributary to Albany Brook in Bartlett, NH within the White Mountain National Forest, Bartlett Experimental Forest.

The contractor(s) shall provide all expertise, labor, supervision, services, equipment, tools, supplies, permits, coordination with utilities, transportation, and incidentals necessary to perform the roadway repairs and other associated minor activities. The desired outcome is in strict accordance with the standards attached to this solicitation and adherence to the contract awarded. The awarded contract shall constitute the entire agreement including all terms and conditions applicable to the contract.


Work shall be completed as shown in the drawings, maps and specifications as referenced or included in this contract. Work includes, but is not limited to soil erosion and sediment control, excavation, embankment, select borrow and surface gravel haul and placement, removal of obstructions, steel reinforced concrete placement, riprap placement, structural plate-arch installation, streambed simulation, installation of guardrail, and seeding and mulch.


Pre-bid Tour - April 18, 2018 @ 10:00 am - From the intersection of Bear Notch Road and US 302 in Bartlett, New Hampshire, travel south on Bear Notch Road for approximately 0.7 miles to road gate. Meeting will start at gate. Questions and answers from the pre-bid tour will be posted to the solicitation.


SOLICITATION WILL BE POSTED ON MARCH 30TH, 2018

Files

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors