Attach_3_Plan_Clarifications_BartlettAOP_XB443_PlanClarification.docx
DOCX document 63 KB Posted
- Solicitation number
- 12148418R0002
About this file
Attach 3 Plan Clarifications BartlettAOP_XB443_PlanClarification
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 12148418R0002-0001.pdf | ||
| 12148418R0002_XB443-0.4_REVISED_Q-A_041818.docx | DOCX document | |
| 12148418R0002_XB443-0.4_Bartlett_AOP_Culvert_Pictures.pdf | ||
| 12148418R0002_XB443-0.4_Q-A_041818.docx | DOCX document | |
| Attach_5_GovtProvidedTechnicalProposalForms.docx | DOCX document | |
| 12148418R0002_XB443_Solicitation.pdf | ||
| Attach_1_Supp_Specs_BartlettAOP_XB443_SectJ_FSSupSpecs.docx | DOCX document | |
| Attach_4_DBWD_NH180026_010518__NH26_Highway_Carroll_Co.docx | DOCX document | |
| Attach_2_Plans_BartlettAOP_XB443_FinalPlans.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bartlett AOP XB443-0.4 Bartlett Experimental Forest/ Saco Ranger District White Mountain National Forest Bartlett, New Hampshire
Plan Clarifications A. Design Plans:
Sheet 2, Notes Sheet (1 of 2): General Notes:
· Delete Note 4 and replace with: “The contractor shall be responsible for obtaining all environmental permits. An erosion control plan shall be included in the permit submittal. The Forest Service shall review and sign the permit application(s) prior to submittal. The contractor shall ensure that all permit conditions are met during construction.”
· Delete the first sentence of Note 5.
Sheet 7, Typical Sections (2 of 2): OM-3L Typical and OM-3R Typical:
· Add installation detail below.
image1.png
File details come from the government source that posted it.