Attach_3_Plan_Clarifications_BartlettAOP_XB443_PlanClarification.docx

DOCX document 63 KB Posted

Attached to
XB443-0. 4 Bartlett AOP Culvert Replacement over Tributary to Albany Brook
Solicitation number
12148418R0002
Issued by

About this file

Attach 3 Plan Clarifications BartlettAOP_XB443_PlanClarification

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bartlett AOP XB443-0.4 Bartlett Experimental Forest/ Saco Ranger District White Mountain National Forest Bartlett, New Hampshire

Plan Clarifications A. Design Plans:

Sheet 2, Notes Sheet (1 of 2): General Notes:

· Delete Note 4 and replace with: “The contractor shall be responsible for obtaining all environmental permits. An erosion control plan shall be included in the permit submittal. The Forest Service shall review and sign the permit application(s) prior to submittal. The contractor shall ensure that all permit conditions are met during construction.”

· Delete the first sentence of Note 5.

Sheet 7, Typical Sections (2 of 2): OM-3L Typical and OM-3R Typical:

· Add installation detail below.

image1.png

File details come from the government source that posted it.