Windshield panel, AI- and similar replacement parts

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
SPRPA125REG73
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Notice details come from SAM.gov. Updated .

About this opportunity

The Defense Logistics Agency Aviation is seeking to procure windshield panels and related replacement parts for the V-22 aircraft, specifically a total quantity of 300 units. The solicitation requires manufacturers to produce windshield assemblies in strict accordance with Boeing drawing number 901-947-756-302, Revision P, and meet extensive quality assurance requirements. Contractors must maintain a robust quality control system compliant with Mil-I-45208A, Mil-Q-9858, or ISO-9000/9001/9002 standards, with comprehensive documentation and inspection procedures. The contract involves manufacturing, testing, and inspecting critical safety items (CSI) with rigorous quality control measures, including detailed record-keeping and potential government performance testing. The solicitation was posted on March 25, 2025, with proposals due by May 20, 2025, and requires contractors to demonstrate capability in manufacturing aerospace components with high precision and quality standards.

The contract opportunity is not set aside for any specific business category and applies to the Other Aircraft Parts and Auxiliary Equipment Manufacturing sector (NAICS 336413). The total contract quantity is 315 units to be delivered within 365 days, with a focus on right-hand (R/H) windshield assemblies for the V-22 aircraft. Contractors are responsible for providing all necessary manufacturing equipment, including fixtures, jigs, dies, and test equipment, without government provision. Packaging must comply with MIL-STD 2073, and manufacturers must follow strict marking requirements per MIL-STD-130. The contract includes detailed provisions for material control, inspection, failure analysis, and a contractor internal review board (IRB) process, with the government retaining final material review board (MRB) authority for critical dispositions.

Notice text

2 versions

Update #2 · Latest ·

ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19||||||||||||||||||||

HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (FEB 1999) (NAVICP REVIEW FEB 1999)|1|ISO 9000 EQUIVALENT OR BETTER|

TIME OF DELIVERY (JUNE 1997)|20|0001AA|315 EACH|365 DAYS||||||||||||||||||

STOP-WORK ORDER (AUG 1989)|1||

WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|TBD||TBD|TBD|TBD|TBD|TBD|TBD|||||||||

NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1||

VALUE ENGINEERING (JUN 2020)|3||||

INTEGRITY OF UNIT PRICES (NOV 2021)|1||

EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2|||

TRANSPORTATION OF SUPPLIES BY SEA (OCT 2024)|2|||

BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11||||||||||||

LIMITATION OF LIABILITY--HIGH-VALUE ITEMS (FEB 1997)|1||

ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2024)|13||||||||||||||

BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5||||||

BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (FEB 2024)|1||

ROYALTY INFORMATION (APR 1984)|1||

ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2025) (DEVIATION 2025-O0003)|12|336413|1250|||||||||||

FACSIMILE PROPOSALS (OCT 1997)|1||

NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||X|

For clarification this solicitation is considered competitive with pricing to be the decided factor.

The subject requirement is CSI.

THIS IS A CRITICAL SAFETY ITEM (CSI).

The subject requirement is for a total quantity of 300 each.

The following are acceptable parts to fulfill this requirement.

NSN 7RH 1560 01-513-4333; PN 901-947-756-302

or

NSN 7RH 1560 01-615-9024; PN 188000-04

\

1. SCOPE

1.1 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;BOEING; drawing number ( ;77272; ) ;901-947-756-302; , Revision ;P; and all details and specifications referenced therein.

1.2 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be

provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification.

1.3 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C.

2. APPLICABLE DOCUMENTS - NOT APPLICABLE

3. REQUIREMENTS - NOT APPLICABLE

4. QUALITY ASSURANCE

This is manufacture of the V-22 windshield assembly R/H. The Quality Assurance Requirements are provided via hard copy as there is extensive testing and critical requirements.

5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE

6. NOTES - NOT APPLICABLE

1. SCOPE

1.1 . Markings shall be in accordance with MIL-STD-130.

2. APPLICABLE DOCUMENTS - NOT APPLICABLE

3. REQUIREMENTS

The contractor shall maintain a quality control system which meets the requirements of Mil-I-45208A, Mil-Q 9858,ISO-9000 / 9001 / 9002 or equivalent.

RESPONSIBILITY FOR INSPECTION: Unless otherwise specified, the contractor is responsible for the performance of all inspection requirements as specified

herein. Except as otherwise specified, the contractor may use his own or any other facility suitable for the performance of the inspection requirements specified herein.

PROCEDURES:The contractor shall prepare and maintain Quality Control

Documentation, test and repair procedures, and inspection procedures which shall be made available to the Government for review and approval. The procedures shall include sequential diagrams of the test, repair, and inspection process, as well as the

performance spcifications to perform the procedures.

QUALITY ASSURANCE PROGRAM PLAN: The contractor shall develop, implement and maintain a Repair Quality Plan in compliance with the requirements of Mil-I-45208A, Mil-Q-9858, ISO,9000 / 9001 / 9002, or equvalent.The plan shall define the specific methods by which

compliance with contractual requirements

will be assured. All quality assurance data shall be provided to the Government for review and approval upon request.

PURCHASED MATERIAL CONTROL: The contractor shall establish and maintain a system of control over purchased material which shall assure that the necessary requirements of this contract are included. in all sub

contract agreements. A parts control system shall establish a record of performance for each purchased and internally manufactured part and shall be used to evaluate continued use of the source. The contractors control system shall be in compliance wil

either Mil-I 45208A/Mil-Q-9858 or equivalent Quality Quality Assurance Standared.(ISO/AS:9000, 9001, 9002).

RECEIVING INSPECTION OF PURCHASED MATERIAL: Purchased items shall be inspected upon receipt at the contractors facility to assure conformance with all requirements of the Technical Data Package (TDP). Evidence of such inspections shall be maintained for

Government review at least twelve (12) months following acceptance of the end item. Inspection reports shall be maintained by the contractor. The inspection report shall, at a minimum, include a record of all dimensional data (coordinate/positional), material,

finish, and process with appropriate pass/fail criteria, such ascertifications, and actual dimensional readings.

FAILURE ANALYSIS AND CORRECTIVE ACTION:All failure analysis and corrective action reports/plans shall be submitted to the Government.

NONCONFORMING MATERIAL:The contractor shall establish an effective system for controlling nonconforming material including procedures for identification, segregation, and disposition.

CONTRACTOR INTERNAL REVIEW BOARD (IRB):IRB authority is delegated to the contractor for this contract only. The IRB may be used only for disposition of materials exhibiting minor non-conformances, scrap or rework to return a part to conformance with drawings or

specifications as authorized by the approved repair procedures.IRB shall not use "AS-IS" disposition. A complete file of IRB actions shall be maintained for review by the Government for concurrance of classification.

MATERIAL REVIEW BOARD (MRB):Formal MRB authority for disposition of "AS-IS"and for minor non-conformances is retained by the Government. The contractor shall submit the appropriate request for Variance via the DCMC to the NAVSUP Contracting Officer.

RESPONSIBILITY FOR COMPLIANCE: All items must meet all requirements of this Statement of Work. The inspection requirements set forth in this SOW shall become part of the contractors overall inspection system or quality program. The absence of any inspection

requirements in the SOW shall not relieve the contractor of the responsibility of assuring that all Government equipment submitted for acceptance comply with all requirements. Sampling in quality conformance does not authorize submission of known defective

items, either indicated or actual, nor does it commit the procuring activity to acceptance of any defective items.

REPAIR ASSESSMENT TESTING: The Government may select samples of the Contract Line Items (CLINS) which have completed repair and have been accepted by the Government representative for the purpose of conducting performance testing, environmental testing, and

quality conformance examination in a repair assessment test program. A quantity of CLIN's may be randomly selected from each quaterly repair production completion for shipment to the CFA or other Government designated location to conduct this testing.

RECORDS OF DATA COLLECTION: The contractor shall maintain a historical record file to contain copies of applicable data and documents for individual CLIN's

and assemblies by CLIN serial number. The historical record file shall include,but not be limited to the following types of historical records:

Receipt inspection documentation.

Repair shop travelers or repair cards.

Parts replacement records.

Parts inspection data before and after repair as applicable.

Acceptance test data.

QA personnel shall maintain a complete receipt inspection,test, repair

re-test, history card for each item processed. This information shall be made available to the Government upon request.

4. QUALITY ASSURANCE PROVISIONS - NOT APPLICABLE.

5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE

6. NOTES - NOT APPLICABLE

Update #1 ·

ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19||||||||||||||||||||

HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (FEB 1999) (NAVICP REVIEW FEB 1999)|1|ISO 9000 EQUIVALENT OR BETTER|

TIME OF DELIVERY (JUNE 1997)|20|0001AA|315 EACH|365 DAYS||||||||||||||||||

STOP-WORK ORDER (AUG 1989)|1||

WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|TBD||TBD|TBD|TBD|TBD|TBD|TBD|||||||||

NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1||

VALUE ENGINEERING (JUN 2020)|3||||

INTEGRITY OF UNIT PRICES (NOV 2021)|1||

EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2|||

TRANSPORTATION OF SUPPLIES BY SEA (OCT 2024)|2|||

BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11||||||||||||

LIMITATION OF LIABILITY--HIGH-VALUE ITEMS (FEB 1997)|1||

ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2024)|13||||||||||||||

BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5||||||

BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (FEB 2024)|1||

ROYALTY INFORMATION (APR 1984)|1||

ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2025) (DEVIATION 2025-O0003)|12|336413|1250|||||||||||

FACSIMILE PROPOSALS (OCT 1997)|1||

NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||X|

The subject requirement is CSI.

THIS IS A CRITICAL SAFETY ITEM (CSI).

The subject requirement is for a total quantity of 300 each.

The following are acceptable parts to fulfill this requirement.

NSN 7RH 1560 01-513-4333; PN 901-947-756-302

or

NSN 7RH 1560 01-615-9024; PN 188000-04

\

1. SCOPE

1.1 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;BOEING; drawing number ( ;77272; ) ;901-947-756-302; , Revision ;P; and all details and specifications referenced therein.

1.2 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be

provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification.

1.3 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C.

2. APPLICABLE DOCUMENTS - NOT APPLICABLE

3. REQUIREMENTS - NOT APPLICABLE

4. QUALITY ASSURANCE

This is manufacture of the V-22 windshield assembly R/H. The Quality Assurance Requirements are provided via hard copy as there is extensive testing and critical requirements.

5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE

6. NOTES - NOT APPLICABLE

1. SCOPE

1.1 . Markings shall be in accordance with MIL-STD-130.

2. APPLICABLE DOCUMENTS - NOT APPLICABLE

3. REQUIREMENTS

The contractor shall maintain a quality control system which meets the requirements of Mil-I-45208A, Mil-Q 9858,ISO-9000 / 9001 / 9002 or equivalent.

RESPONSIBILITY FOR INSPECTION: Unless otherwise specified, the contractor is responsible for the performance of all inspection requirements as specified

herein. Except as otherwise specified, the contractor may use his own or any other facility suitable for the performance of the inspection requirements specified herein.

PROCEDURES:The contractor shall prepare and maintain Quality Control

Documentation, test and repair procedures, and inspection procedures which shall be made available to the Government for review and approval. The procedures shall include sequential diagrams of the test, repair, and inspection process, as well as the

performance spcifications to perform the procedures.

QUALITY ASSURANCE PROGRAM PLAN: The contractor shall develop, implement and maintain a Repair Quality Plan in compliance with the requirements of Mil-I-45208A, Mil-Q-9858, ISO,9000 / 9001 / 9002, or equvalent.The plan shall define the specific methods by which

compliance with contractual requirements

will be assured. All quality assurance data shall be provided to the Government for review and approval upon request.

PURCHASED MATERIAL CONTROL: The contractor shall establish and maintain a system of control over purchased material which shall assure that the necessary requirements of this contract are included. in all sub

contract agreements. A parts control system shall establish a record of performance for each purchased and internally manufactured part and shall be used to evaluate continued use of the source. The contractors control system shall be in compliance wil

either Mil-I 45208A/Mil-Q-9858 or equivalent Quality Quality Assurance Standared.(ISO/AS:9000, 9001, 9002).

RECEIVING INSPECTION OF PURCHASED MATERIAL: Purchased items shall be inspected upon receipt at the contractors facility to assure conformance with all requirements of the Technical Data Package (TDP). Evidence of such inspections shall be maintained for

Government review at least twelve (12) months following acceptance of the end item. Inspection reports shall be maintained by the contractor. The inspection report shall, at a minimum, include a record of all dimensional data (coordinate/positional), material,

finish, and process with appropriate pass/fail criteria, such ascertifications, and actual dimensional readings.

FAILURE ANALYSIS AND CORRECTIVE ACTION:All failure analysis and corrective action reports/plans shall be submitted to the Government.

NONCONFORMING MATERIAL:The contractor shall establish an effective system for controlling nonconforming material including procedures for identification, segregation, and disposition.

CONTRACTOR INTERNAL REVIEW BOARD (IRB):IRB authority is delegated to the contractor for this contract only. The IRB may be used only for disposition of materials exhibiting minor non-conformances, scrap or rework to return a part to conformance with drawings or

specifications as authorized by the approved repair procedures.IRB shall not use "AS-IS" disposition. A complete file of IRB actions shall be maintained for review by the Government for concurrance of classification.

MATERIAL REVIEW BOARD (MRB):Formal MRB authority for disposition of "AS-IS"and for minor non-conformances is retained by the Government. The contractor shall submit the appropriate request for Variance via the DCMC to the NAVSUP Contracting Officer.

RESPONSIBILITY FOR COMPLIANCE: All items must meet all requirements of this Statement of Work. The inspection requirements set forth in this SOW shall become part of the contractors overall inspection system or quality program. The absence of any inspection

requirements in the SOW shall not relieve the contractor of the responsibility of assuring that all Government equipment submitted for acceptance comply with all requirements. Sampling in quality conformance does not authorize submission of known defective

items, either indicated or actual, nor does it commit the procuring activity to acceptance of any defective items.

REPAIR ASSESSMENT TESTING: The Government may select samples of the Contract Line Items (CLINS) which have completed repair and have been accepted by the Government representative for the purpose of conducting performance testing, environmental testing, and

quality conformance examination in a repair assessment test program. A quantity of CLIN's may be randomly selected from each quaterly repair production completion for shipment to the CFA or other Government designated location to conduct this testing.

RECORDS OF DATA COLLECTION: The contractor shall maintain a historical record file to contain copies of applicable data and documents for individual CLIN's

and assemblies by CLIN serial number. The historical record file shall include,but not be limited to the following types of historical records:

Receipt inspection documentation.

Repair shop travelers or repair cards.

Parts replacement records.

Parts inspection data before and after repair as applicable.

Acceptance test data.

QA personnel shall maintain a complete receipt inspection,test, repair

re-test, history card for each item processed. This information shall be made available to the Government upon request.

4. QUALITY ASSURANCE PROVISIONS - NOT APPLICABLE.

5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE

6. NOTES - NOT APPLICABLE

Notice history

Notice Type Posted
1560 - 7RH 1560 015134333 V2 315 each Latest Limited / Sole Source Justification
Windshield panel, AI Award Award Notice
This notice Latest solicitation Solicitation
Windshield panel, AI- and similar replacement parts Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Windshield, LH Virginia 23237, United States · NAICS 336413 Aviation No set-aside
Window panel, aircraft NAICS 336413 Aviation No set-aside
Window panel, aircraft NAICS 336411 Aviation No set-aside
Canopy, fixed NAICS 336413 Aviation No set-aside
Window panel, aircraft / NSN 1560-01-384-5759 / UH-60 helicopter NAICS 336413 Aviation No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity