Wilds Bend Stabilization Construction Project
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- W912ES23B0009
- Agency
- ENDIST St Paul US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- Place of performance
- Fountain City, Wisconsin, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers, St. Paul District is soliciting proposals for the Wilds Bend Bank Stabilization Construction Project located in Fountain City, Wisconsin. The contractor will be required to construct a sand berm, sand bench, and riprap vanes as specified in the solicitation plans and specifications. Bids will be evaluated based on price, and the contract will be awarded as a single firm-fixed price contract following sealed bidding procedures. The deadline for questions is 10 days prior to the bid opening on October 31, 2023.
This 100% set-aside for small businesses has a NAICS code of 237990 for other heavy and civil engineering construction. The estimated construction cost is between $500,000 to $1,000,000, involving placement of 11,513 cubic yards of sand and 1,237 tons of riprap. The place of performance is Fountain City, WI 54629. Bids were received from seven contractors ranging from $347,400 to $1,287,480.50 for the base work, with Legacy Corporation of Illinois submitting the lowest bid.
Notice text
4 versions
Update #4 · Latest ·
Sealed Bid Opening Abstract 31Oct23 Attached.
Amendment 0002 - Spec Change and Wage Determination Update. See attached W912ES23B0009-0002.
Amendment 0001 - Revised Bidder Inquiry Key provided. See attached W912ES23B0009-0001.
The U.S. Army Corps of Engineers, St. Paul District, has a requirement for the Wilds Bend Bank Stabilization Construction Project, Upper Mississippi River Basin Pool 5A near Fountain City, Buffalo County, Wisconsin. Wilds Bend is a temporary dredge material storage island. The dredged material is generated from the Mississippi River navigation channel and is mostly sand. To stabilize the island, a Contractor will need to construct a sand berm, sand bench, and riprap vanes as specified in the specifications and plans provided herein.
This project is solicited in accordance with FAR 14 - Sealed Bidding procedures with the intention of awarding a single firm-fixed price contract.
The Invitation for Bid solicitation is 100% set aside for Small Business. The North American Industry Classification System (NAICS) code for this project is 237990 Other Heavy and Civil Engineering Construction, with a size standard of $45.0M.
The estimated magnitude of construction is between $500,000 and $1,000,000.
Update #3 ·
Amendment 0002 - Spec Change and Wage Determination Update. See attached W912ES23B0009-0002.
Amendment 0001 - Revised Bidder Inquiry Key provided. See attached W912ES23B0009-0001.
The U.S. Army Corps of Engineers, St. Paul District, has a requirement for the Wilds Bend Bank Stabilization Construction Project, Upper Mississippi River Basin Pool 5A near Fountain City, Buffalo County, Wisconsin. Wilds Bend is a temporary dredge material storage island. The dredged material is generated from the Mississippi River navigation channel and is mostly sand. To stabilize the island, a Contractor will need to construct a sand berm, sand bench, and riprap vanes as specified in the specifications and plans provided herein.
This project is solicited in accordance with FAR 14 - Sealed Bidding procedures with the intention of awarding a single firm-fixed price contract.
The Invitation for Bid solicitation is 100% set aside for Small Business. The North American Industry Classification System (NAICS) code for this project is 237990 Other Heavy and Civil Engineering Construction, with a size standard of $45.0M.
The estimated magnitude of construction is between $500,000 and $1,000,000.
Update #2 ·
Amendment 0001 - Revised Bidder Inquiry Key provided. See attached W912ES23B0009-0001.
The U.S. Army Corps of Engineers, St. Paul District, has a requirement for the Wilds Bend Bank Stabilization Construction Project, Upper Mississippi River Basin Pool 5A near Fountain City, Buffalo County, Wisconsin. Wilds Bend is a temporary dredge material storage island. The dredged material is generated from the Mississippi River navigation channel and is mostly sand. To stabilize the island, a Contractor will need to construct a sand berm, sand bench, and riprap vanes as specified in the specifications and plans provided herein.
This project is solicited in accordance with FAR 14 - Sealed Bidding procedures with the intention of awarding a single firm-fixed price contract.
The Invitation for Bid solicitation is 100% set aside for Small Business. The North American Industry Classification System (NAICS) code for this project is 237990 Other Heavy and Civil Engineering Construction, with a size standard of $45.0M.
The estimated magnitude of construction is between $500,000 and $1,000,000.
Update #1 ·
The U.S. Army Corps of Engineers, St. Paul District, has a requirement for the Wilds Bend Bank Stabilization Construction Project, Upper Mississippi River Basin Pool 5A near Fountain City, Buffalo County, Wisconsin. Wilds Bend is a temporary dredge material storage island. The dredged material is generated from the Mississippi River navigation channel and is mostly sand. To stabilize the island, a Contractor will need to construct a sand berm, sand bench, and riprap vanes as specified in the specifications and plans provided herein.
This project is solicited in accordance with FAR 14 - Sealed Bidding procedures with the intention of awarding a single firm-fixed price contract.
The Invitation for Bid solicitation is 100% set aside for Small Business. The North American Industry Classification System (NAICS) code for this project is 237990 Other Heavy and Civil Engineering Construction, with a size standard of $45.0M.
The estimated magnitude of construction is between $500,000 and $1,000,000.
Attachments
| File | Type | Posted |
|---|---|---|
| W912ES23B0009 Bid Abstract - Wilds Bend 31Oct23.pdf | ||
| W912ES23B0009-0002 Wilds Bend Stabilization - Spec Change WD Update 25Oct23.pdf | ||
| W912ES23B0009-0001 Wilds Bend Stabilization - Bidder Inquiry Key 29Sep23.pdf | ||
| W912ES23B0009 Wilds Bend Stabilization PLANS 28Sep23.pdf | ||
| W912ES23B0009 Wilds Bend Stabilization SPECS 28Sep23.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Wilds Bend Stabilization Construction Project | Award Notice | |
| Wilds Bend Stabilization Construction Project | Solicitation | |
| Wilds Bend Stabilization Construction Project | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity