Whitney Power House Glazed Wall Restoration
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- W9126G22R0053
- Agency
-
ENDIST Fort Worth
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 236210 Industrial Building Construction
- Place of performance
- Clifton, Texas 76634, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation seeks restoration services for the glazed walls and doors at the Whitney Power House in Clifton, Texas. The Army Corps of Engineers Fort Worth District will remove lead paint and corrosion from the existing steel structure, replace single-pane glass units with new safety glass, repaint the steel, and make repairs to doors and hinges. Optional work includes adding a lubrication system and laminating all new glass. Proposals are due February 2nd and will be evaluated using the lowest price technically acceptable process.
The opportunity is a total small business set-aside, with an estimated value between $500,000 to $1 million. The NAICS code is 238990 and PSC code is J029. Work must be completed within 150 days of award. The place of performance is the Whitney Power House located at Clifton, Texas 76634. Proposals exceeding the budget range or submitted after the February 2nd deadline will be deemed unacceptable.
Notice text
2 versions
Update #2 · Latest ·
Please See Amendment 01 (attachment) For Current Changes to this Solitication.
This project includes the removal of existing single-pane glass units and existing paint system to base steel. Existing paint contains lead and will require specialized removal and disposal as defined in specifications. Removal and disposal of lead contaminated debris shall be in compliance with Society for Protective Coatings (SSPC) GUIDE 6 and Society for Protective Coatings (SSPC) Guide 7 which can be found at www.sspc.org . Corrosion and pack rust shall be removed from the steel structure and edges of the built-up members shall be seal welded. Debris in openings of built-up members of wall and doors shall be removed. Pins in the door hinges shall be removed and the hinges disassembled to be cleaned from paint, pack rust and corrosion. Welds of the door hinges shall be tested for cracks using Non-Destructive Test (NDT)methods. If the welds are deemed unacceptable, they shall be grinded out and re-welded. Door latch systems shall also be disassembled, and removed of any paint, pack rust and corrosion. Openings at ends of built-up members shall be closed with steel plates welded on to prevent future debris build-up. Weep holes shall be drilled at specified locations on built-up members. Each door shall be profiled such that it does not make contact with the wall frame when being opened and closed. Door latch insert holes shall be modified to allow door to be latched when fully closed without slamming or excessive manipulation of doors. Doors when fully closed and latching rods extended shall have minimal movement.
The door hinges and latching systems shall be re-assembled, reinstalled and lubricated after paint, corrosion, and rust are completely removed. The steel wall and door structures, including hinges and latching systems, shall be repainted with a new paint system. New single-pane safety glass units shall be installed in place of existing glazing. The bottom two rows of glass units in the wall and doors shall be laminated safety glass to protect power plant personnel. Paint shall be retouched as necessary to provide an adequate coating. Weep holes shall be cleaned out if new paint is clogging exits.
Options to the contract will be installing a single-point lubrication system at a specified location and using laminate reinforcing for all new glass units.
This magnitude of construction of the proposed work is between $500,000 - $1,000,000 in accordance with (IAW) FAR 36.204.
Update #1 ·
This project includes the removal of existing single-pane glass units and existing paint system to base steel. Existing paint contains lead and will require specialized removal and disposal as defined in specifications. Removal and disposal of lead contaminated debris shall be in compliance with Society for Protective Coatings (SSPC) GUIDE 6 and Society for Protective Coatings (SSPC) Guide 7 which can be found at www.sspc.org . Corrosion and pack rust shall be removed from the steel structure and edges of the built-up members shall be seal welded. Debris in openings of built-up members of wall and doors shall be removed. Pins in the door hinges shall be removed and the hinges disassembled to be cleaned from paint, pack rust and corrosion. Welds of the door hinges shall be tested for cracks using Non-Destructive Test (NDT)methods. If the welds are deemed unacceptable, they shall be grinded out and re-welded. Door latch systems shall also be disassembled, and removed of any paint, pack rust and corrosion. Openings at ends of built-up members shall be closed with steel plates welded on to prevent future debris build-up. Weep holes shall be drilled at specified locations on built-up members. Each door shall be profiled such that it does not make contact with the wall frame when being opened and closed. Door latch insert holes shall be modified to allow door to be latched when fully closed without slamming or excessive manipulation of doors. Doors when fully closed and latching rods extended shall have minimal movement.
The door hinges and latching systems shall be re-assembled, reinstalled and lubricated after paint, corrosion, and rust are completely removed. The steel wall and door structures, including hinges and latching systems, shall be repainted with a new paint system. New single-pane safety glass units shall be installed in place of existing glazing. The bottom two rows of glass units in the wall and doors shall be laminated safety glass to protect power plant personnel. Paint shall be retouched as necessary to provide an adequate coating. Weep holes shall be cleaned out if new paint is clogging exits.
Options to the contract will be installing a single-point lubrication system at a specified location and using laminate reinforcing for all new glass units.
This magnitude of construction of the proposed work is between $500,000 - $1,000,000 in accordance with (IAW) FAR 36.204.
Files
Notice history
| Notice | Type | Posted |
|---|---|---|
| Whitney Power House Glazed Wall Restoration | Award Notice | |
| This notice | Solicitation | |
| Whitney Power House Glazed Wall Restoration | Pre-Solicitation |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity