B08-Solicitation Amendment 01- W9126G22R0053 Whitney Power House Glazed Wall Restoration .pdf

PDF 857 KB Posted

Attached to
Whitney Power House Glazed Wall Restoration
Solicitation number
W9126G22R0053
Issued by

About this file

This document contains a federal contract solicitation and related opportunity details. The solicitation seeks restoration services for the glazed wall and doors at the Whitney Power House, including removal and disposal of lead paint, steel repair and welding, reglazing, and repainting. The project value is estimated between $500,000 to $1,000,000. Interested vendors must submit technical and price proposals through the Procurement Integrated Enterprise Environment system by February 2nd, 2022. The Army Corps of Engineers Fort Worth District will evaluate proposals using the lowest price technically acceptable process. Award is expected to be made to the offeror with the lowest evaluated price meeting the technical acceptability standards for non-cost factors.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Amendment 01

Solicitation No. W9126G22R0053 Whitney Pow erhouse Glazed Wall Restoration is amended as follow s:

1. Correct the link for the PIEE vendor registration and update Contract Specialist POC in the Proposal Preparation Section 002200.

2. Contract Specialist: Shayla Lucas, email: shayla.j.lucas@usace.army.mil Contract Officer: Robert M. Duran, email: robert.m.duran@usace.army.mil

1. CONTRACT ID CODE PAGE OF PAGES

J 1 16

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9126G22R0053

X 9B. DATED (SEE ITEM 11)

05-Jan-2022

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

U0001

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

28-Jan-2022

CODE

US ARMY CORPS OF ENGINEERS FORT WORTH

819 TAYLOR ST, CT OFC RM 2A17

FORT WORTH TX 76102-0300

W9126G 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

X 1

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 22 00 - INSTRUCTIONS

The following have been modified:

INSTRUCTIONS TO OFFERORS

SECTION 00 22 00

LOWEST PRICE TECHNICALLY ACCEPTABLE (LPTA)

PROPOSAL PREPARATION

Amendment 01 <Amd01>

PART I – GENERAL INFORMATION

1. INQUIRIES

OFFEROR'S QUESTIONS AND COMMENTS

Questions and/or comments relative to these documents should be submitted via e-mail or mailed to:

Contract Specialist – Primary POC U.S. Army Corps of Engineers, SWF-CT: Civil Works/Construction Section ATTN: <Amd01> Sequoria Wilson Shayla Lucas </Amd01> 819 Taylor Street, RM 2A19 Fort Worth, TX 76102

Phone:<Amd01> 817/886-1111 817/886-1188 </Amd01> Fax: 817/886-1111 Email: <Amd01> sequoria.l.wilson@usace.army.mil shayla.j.lucas@usace.army.mil and robert.m.duran@usace.army.mil </Amd01>

Bidder Inquiry Technical inquiries and questions relating to proposal procedures or bonds are to be submitted via:

Bidder Inquiry in ProjNet at http://www.projnet.org/projnet

To submit and review bid inquiry items, bidders will need to be a current registered user or self-register into system. To self-register go to web page, click BID tab select Bidder Inquiry, select agency USACE, enter Key for this solicitation listed below, and your e-mail address, click login. Fill in all required information and click create user. Verify that information on next screen is correct and click continue.

From this page you may view all bidder inquiries or add inquiry.

Bidders will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.

The Solicitation Number is: W9126G22R0053 The Bidder Inquiry Key is: MMSVAT-3X4B29

The Bidder Inquiry System will be unavailable for new inquires 5 days prior to proposal submission in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation, if necessary.

Offerors are requested to review the specification in its entirety, review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.

The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). Telephone number for the Call Center is 800-428-HELP.

Identify other method required or enter N/A

Offers will NOT be publicly opened. Information concerning the status of the evaluation and/or award will NOT be available after receipt of proposals

Oral explanations or instructions are not binding. Any information given to an offeror which impacts the solicitation and/or offer will be given in the form of a written amendment to the solicitation.

As this is a competitive negotiation acquisition, there is no public bid opening; and no information will be given out as to the number of offerors or the results of the competition until all awards are made.

2. DIRECTIONS FOR SUBMITTING PROPOSALS

a. Offers must be in sealed envelopes/packages, marked and addressed as follows:

PACKAGES: Whitney Dam Glazing Wall and Door Repairs Solicitation No. W9126G22R0053 Offer Closing Date: 02-FEB-2022 Offer Closing Time: 2:00 PM CDT

(LOCAL TIME)

ADDRESS PACKAGES TO:

U.S. Army Corps of Engineers (USACE), Fort Worth District Attention: <Amd01> Sequoria Wilson Shayla Lucas </Amd01> 819 Taylor Street, RM 2A19 Fort Worth, TX 76102

<Amd01> Proposals: ALL SUBMISSIONS TO THIS PROPOSAL ANNOUNCEMENT SHALL BE SUBMITTED ELECTRONICALLY THROUGH PIEE. No paper copies, CD-ROMs or facsimile submissions will be accepted.

Electronic Proposal Submission is required through the Army’s Electronic File Sharing Service, Procurement Integrated Enterprise Environment (PIEE) (https://piee.eb.mil/). The PIEE Application is used to send large files to individuals that would normally be too large to send via email. Information regarding how to set up a vendor registration is included in this link- https://pieetraining.eb.mil/wbt/portal/portal/Vendor_Registration.pdf. If you plan on submitting a proposal, be sure to select “SOL-Solicitation” in the top drop down list and choose the “Proposal Manager” role to be able to submit a proposal in PIEE.

Further training is available at this link: https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml. This link shows information regarding the Solicitation application in PIEE and the different roles available.

Link for Offerors regarding an Overview of the Proposal Manager function and instruction on submitting a proposal -https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/solicitation/proposals.xhtml

File Size Limitations: Offerors are advised to follow the PIEE instructions for uploading files. PIEE supports delivery up to 1.9 GB per file, with no limit on the number of files, as well as multiple file formats. If needed, Offerors are advised to break the files down into smaller sections in order to upload it to the system. In such cases, please divide the sections as logically as possible and be sure to clearly name the files as specified below.

Offerors ENSURE proposals are submitted via PIEE and Email to robert.m.duran@usace.army.mil and shayla.j.lucas@usace.army.mil. </Amd01>

Special Instruction Pertaining to Hand Carried Offers: Hand-carried offers must be delivered to the USACE Office at the address above. Offerors who desire to hand-deliver their offers must notify the Contract Specialist in advance due to security requirements. NOTE: Due to Covid restrictions. Hand-carried offers is not available at this time.

b. OFFERS BY TELEGRAPH. Offers received by telegraph, modifications thereto, or cancellations of offers will or will not be accepted.

c. FACSIMILE OFFERS. Facsimile offers, modifications thereto, or cancellations of offers will or will not be accepted.

d. E MAIL OFFERS. Offers received by e mail, modifications thereto, or cancellations of offers will or will not be accepted.

3. PREPROPOSAL CONFERENCE / SITE VISIT

SITE VISIT. See Section 01 11 00.00 44 paragraph 2.3.2 Location

IMPORTANT NOTES. (1) Remarks and explanations addressed during the conference shall not qualify or alter the terms and conditions of the solicitation. (2) The terms and conditions of the solicitation remain unchanged unless the solicitation is formally amended in writing.

INTENTIONALLY LEFT BLANK

PART II -- PROPOSAL INSTRUCTIONS

1. PROPOSAL SUBMISSION REQUIREMENTS AND INSTRUCTIONS

a. REQUIREMENT FOR SEPARATE PRICE AND TECHNICAL PROPOSALS.

(1) Each Offeror must submit both a Price Proposal and a Technical Proposal. The Price Proposal and the Technical Proposal must be submitted as separate volumes. Ensure that the outside of each separate volume is clearly marked to indicate its contents and the identity of the offeror. Additionally, clearly identify the “original” cost/price proposal and the “original” technical proposal on the outside cover.

(2) Both the Price Proposal and the Technical Proposal must be received by the closing date and time set for receipt of proposals.

(3) No dollar amounts from the Price Proposal are to be included in the Technical Proposal.

(4) All information intended to be evaluated as part of the Technical Proposal must be submitted as part of the Technical Proposal. Do not merely cross-reference similar material in the Price Proposal, or vice versa. Also, do not include links to websites in lieu of incorporating information into your proposal.

(5) Do not include exceptions to the terms and conditions of the solicitation in either the technical or price proposal. Should the offer include any standard company terms and conditions that conflict with the terms and conditions of the solicitation, the offer may be determined "unacceptable" and thus ineligible for award. Should the offeror have any questions related to specific terms and conditions, these should be resolved prior to submission of the offer.

b. DISCUSSIONS. The Government intends to evaluate proposals and award a contract without discussions with offerors, in accordance with FAR 52.215-1, Instructions to Offerors—Competitive Acquisitions. The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary.

c. COST OR PRICING DATA. Offerors are not required to submit Cost or Pricing Data with their offers.

d. GENERAL INSTRUCTIONS.

(1) Submit only the hard-copy paper documents and the electronic files specifically authorized and/or required elsewhere in this section. Do not submit excess information, to include audio-visual materials, electronic media, etc. All pages should be numbered.

(2) Use only 8 ½ by 11 inch paper for hard copy submissions, unless another paper size is specifically authorized elsewhere in this section for a particular submission. Do not use fold-outs (e.g., 11” x 14” or 11” x 17” sheets) unless specifically authorized in this section for a particular submission. Do not use a font size smaller than 10, an unusual font style such as script, or condensed print for any submission. All page margins must be at least 1 inch wide, but may include headers and footers.

(3) The preferred method for assembling your proposals is to use three-ring binders; however, the use of pressboard or other report covers with compression or other type fasteners is acceptable. Do not use spring clamps or exceed the recommended capacity of the fastener or binder. Do not use plastic multi-hole/spiral binding systems, heat binding systems, or other systems which do not facilitate the ready insertion of additional pages.

(4) “Confidential” projects cannot be submitted to demonstrate capability unless all of the information required for evaluation as specified herein can be provided to the Government as part of the Offeror’s technical proposal. Offerors that include in their proposals information that they do not want disclosed to the public for any purpose, or used by the Government except for evaluation purposes, must be clearly marked in accordance with the instructions at FAR 52.215-1, “Instructions to Offerors— Competitive Acquisition”, paragraph (e), “Restriction on disclosure and use of data”.

(5) In the case of an Offeror that is part of a large, multi-segmented business concern, provide information directly pertaining to the specific segment of the business concern (i.e., the division, group, unit, etc.)

that will perform work under the prospective contract.

(6) For submissions with page limitations, the pages will be counted as follows: One side of the paper is one page; information on both the back and front of one sheet of paper will be counted as two pages. Where authorized, fold-out pages (11" x 14" or 11" x 17") will count as one page. Pages furnished for organizational purposes only, such as a “Table of Contents” or divider tabs, are not included in the page limitation.

(7) Proposal revisions shall be submitted as page replacements with revised text readily identifiable, e.g., bold face print or underlining. The source of the revision, e.g., Error, Omission, or Clarification, or amendment shall be included and be annotated for each revision. Proposal replacement pages shall be numbered, shall be clearly marked “REVISED”, shall show the date of revision, shall be submitted in appropriate number of copies (e.g., if two (2) copies of the original page was required, then two (2) copies of the revised page will also be required, and shall be a different color than the original pages they are to replace).

(8) : Within three (3) days of contract award, the awardee shall submit a conformed Technical Offer on an electronic CD Rom or DVD +/-R.

e. SPECIFIC INSTRUCTIONS FOR THE PRICE PROPOSAL

(1) Number of Sets of the Price Proposal. Submit the ORIGINAL and No additional hard copy sets of the Price Proposal.

(2) Size Restrictions and Page Limits. Use only 8 ½” x 11” pages. There are no page limits set for the price proposal. However, limit your response to information required by this solicitation. Excess information will not be considered in the Government’s evaluation.

(3) Format and Contents of the Price Proposal and List of Tabs. The Price Proposal shall be appropriately labeled as such and shall be organized as indicated in the following chart. Note: If the Offeror is not required to submit any information under a listed Tab in accordance with the instructions below, that tab can be omitted. However, do not renumber the subsequent tabs.

TAB

CONTENTS OF THE PRICE PROPOSAL

#1

The Proposal Cover Sheet

#2

The SF1449 and Acknowledgement of Amendments

#3

Section 00 11 00, Pricing Schedule

#4

Section 00 45 00, Representations, Certifications, and Other Statements of Offerors or Clause 52.204-8 if offeror has electronic certifications in SAM.GOV

#5

JV Agreement or Articles of Organization for LLC, if applicable.

#6

Bid Guarantee (Bid Bond)

(4) Detailed Submission Instructions for the Price Proposal

TAB 1: The proposal cover sheet is required by FAR 52.215-1(2) (c) (i)-(v) and must be submitted by all offerors. This provision, titled “Instructions to Offerors—Competitive Acquisition,” and the format for the proposal cover sheet as shown here:

TAB 2: The SF 1449, Solicitation, Offer, and Award is to be completed by all Offerors and duly executed with an original signature by an official authorized to bind the company in accordance with FAR

4.102. All amendments must be acknowledged by all Offerors in accordance with the instructions on the Standard Form 30, Amendment of Solicitation.

TAB 3: Section B, Pricing Schedule is to be completed in its entirety by all Offerors. See Section B with attached notes, for further instructions.

PROPOSAL COVER

SHEET

1. Solicitation Number:

2. The name, address, and telephone and facsimile numbers of the Offeror (and electronic address if available):

3. Names, titles, and telephone and facsimile numbers (and electronic addresses if available) of persons authorized to negotiate on the Offeror’s behalf with the Government in connection with this solicitation:

4. Name, title, and signature of person authorized to sign the proposal.

Proposals signed by an agent shall be accompanied by evidence of that

TAB 4: All Offerors must have electronically completed the annual representations and certifications on the “Online Representations and Certifications Application” (ORCA) website or respond with the completed representations / certifications found in the solicitation. The offerors are responsible for ensuring that these on-line Representations and Certifications are updated as necessary to reflect changes, but at least annually to ensure that they are kept current, accurate and complete. Additionally, the offeror must also complete and return the “Representations, Certifications, and Other Statements of Offerors” included in the solicitation. If the offeror is a Joint Venture, all participants must separately complete both the ORCA Representations and Certifications.

TAB 5: If the Offeror is a Joint Venture (JV), include a copy of the JV Agreement. If a JV Agreement has not yet been finalized/approved, indicate its status. JV Agreements must clearly indicate the percentages of the JV participants, in particular the percent of the controlling party, and a clear delineation of responsibilities and authorities between the JV parties. If the Offeror is a Limited Liability Compnay, include a copy of the Articles of Organization.

TAB 6: Provide a fully executed Bid Bond as required by FAR Clause 52.228-1, Bid Guarantee.

f. SPECIFIC INSTRUCTIONS FOR THE TECHNICAL PROPOSAL

(1) Number of Sets of the Technical Proposal. Submit the ORIGINAL and TWO additional sets of the written Technical Proposal, with each set separately packaged.

(2) Format and Contents of the Technical Proposal and List of Tabs. The original and all copies of the technical proposal will be appropriately labeled as such. Each set shall be organized using the tabs specified in the following chart.

SELECT FACTORS NEEDED FOR SPECIFIC PROJECT FROM THOSE BELOW AND THE

APPROPRIATE ATTACHMENTS THAT CORRESPOND

TAB

CONTENTS OF THE TECHNICAL

PROPOSAL

Factor #1

EXPERIENCE

Factor #2

PERSONNEL

Factor #3

PAST PERFORMANCE

(3) Page Limitations. The following page limitations are established for each factor described above:

Factor #1, Experience - Limited to 5 pages (a maximum of 5 forms)

Factor #2, Personnel - Limited to 1 page for each resume provided

Factor #3, Past Performance – Total 12 pages limitation

Tables of content, proposal cover letters, and tabs between proposal information do not count toward any page limitations in the proposal.

(4) Detailed Submission Requirements for the Technical Proposal. Refer to attachment numbers for a detailed description of the information to be submitted under each TAB.

Part III. EVALUATION OF OFFEROR PROPOSALS

1. ELIGIBILITY FOR CONTRACT AWARD. In accordance with the FAR, no contract shall be entered into unless the contracting officer ensures that all requirements of law, executive orders, regulations, and all other applicable procedures, including clearances and approvals, have been met. This includes the FAR requirement that no award shall be made unless the contracting officer makes an affirmative determination of responsibility. To be determined responsible, a prospective contractor must meet the general standards in FAR Part 9 and any special standards set forth in the solicitation.

2. SOURCE SELECTION USING THE LOW-PRICED, TECHNICALLY ACCEPTABLE PROCESS. An evaluation for acceptability will be performed on each proposal in accordance with FAR 15.101-2(b)(3). The proposal that provides the lowest price and is otherwise technically acceptable in all factors will be selected for award. To be considered technically acceptable, no technical factor in the proposal may be determined to be unacceptable. The failure of a proposal to meet any of the acceptability standards for non-cost factors will result in a technically unacceptable rating and preclude award.

3. BASIS OF AWARD. Award will be made based on the lowest evaluated price of proposals meeting or exceeding the acceptability standards for non-cost factors. Tradeoffs are not permitted. Proposals are evaluated for acceptability but not ranked using non-cost/price factors.

4. EVALUATION OF THE PRICE PROPOSALS

a. Price will be evaluated and considered but will not be scored or combined with other aspects of the proposal evaluation. The proposed prices will be analyzed for reasonableness. They may also be analyzed to determine whether they are realistic for the work to be performed, reflect a clear understanding of the requirements, and are consistent with the information provided by the Offeror. Additionally, all offers will be analyzed for unbalanced pricing.

b. The otherwise technically acceptable, lowest-priced offeror may be required to confirm its price on either a

CLIN, element, or total price basis, and/or provide additional information in support of their price, prior to contract award at the Government’s request and discretion.

5. EVALUATION OF THE TECHNICAL PROPOSAL. The Technical Proposal will be evaluated based on the criteria identified in the individual attachments for the Factors.

6. GENERAL TECHNICAL CRITERIA

a. Material omission(s) may cause the technical proposal to be rejected as unacceptable.

b. Proposals which are generic, vague, or lacking in detail may be considered unacceptable. The offeror’s failure to include information that the Government has indicated should be included in the proposal may result in the offer being found deficient.

c. The Government cannot make award based on a deficient offer. Therefore, receipt of a “NO GO” determination of acceptability for any factor will make the offer ineligible for award, unless the Government elects to enter into discussions with that Offeror and all deficiencies are remedied in a revised proposal.

7. 52.217-5 EVALUATION OF OPTIONS (JUL 1990)

Except when it is determined in accordance with FAR 17.206(b) not to be in the Government's best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).

(End of provision)

PROPOSAL PREPARATION

TAB 1: FACTOR # 1, EXPERIENCE: Demonstrate the experience of the offeror and/or proposed team, including subcontractors, on projects same/similar in size, scope, and complexity to that described in the solicitation for same/similar services. The projects submitted should also demonstrate that the offeror and/or the team have performed a same/similar type of services at multiple sites simultaneously. If using Subcontractors as team members in demonstrating experience, describe the role they will play in the project and the percentage of work they will be performing.

The Contractor shall complete a minimum of three (3), but no more than five (5), “Experience Information” forms, (See attachment 1), in response to this factor. All blocks must be filled in and all data should be accurate, current, and complete. All projects submitted must be at least 50% complete and completed within the last 5 years. At least two (2) of the projects provided must be valued at over $500,000.00. .

If any of the information required is not included in the form, then the contractor will be considered non- responsive and evaluated as unacceptable.

EXPERIENCE WILL BE EVALUATED BASED ON THE FOLLOWING CRITERIA:

The Government will review the project experience of the offeror, including subcontractors, on projects provided in response to the Experience Factor. Offerors must meet all of the following minimum acceptability standards to receive a “GO” on this factor:

(1) Offeror must have at least three (3) projects that are same/similar in size, scope, and complexity to that of the work found in this solicitation; AND

(2) At least two (2) of the projects submitted must be valued at over $500,000.00, and they must have been at least 50% complete within the last 5 years.

Failure to demonstrate the minimally acceptability standards under this factor will result in a “NO GO” rating and possible elimination from further consideration for contract award.

ATTACHMENT 1

EXPERIENCE INFORMATION

(To be completed by Contractor)

1. Contractor:

Name:

Address:

2. Relevant Contract /Task Order (TO) /Purchase Order (PO) Number:

3. Contract/TO/PO Dollar Value:

4. Contract/TO /PO Status: Active Complete

Completion Date (w/ extensions):

5. Project Title:

Location:

6. Project Description-- to include the role of the contractor on the project and specific responsibilities of the contractor in performance of the effort:

7. Project Owner or Project Manager for the Client – provide:

Telephone Number and E-mail:

TAB 2: FACTOR 2, PERSONNEL: The offeror must provide resume data for the following key personnel:

Examples follow but should be tailored to the requirement: Project Manager, Safety Officer, Quality Control Manager, Site Superintendent

Resume information to be provided shall be limited to no more than one (1) page per person and shall include the following information as a minimum:

(a) Name and title

(b) Project assignment

(c) Name of firm with which associated

(d) Years’ experience with this firm and with other firms

(e) Active professional registration, year first registered, if applicable

(f) Other experience and qualifications relevant to same/similar work required under this contract

PERSONNEL WILL BE EVALUATED BASED ON THE FOLLOWING CRITERIA:

The Government will review the resumes provided in response to the Personnel Factor. Offerors must demonstrate all of the following minimum acceptability standards to receive a “GO” on this factor.

The offeror must demonstrate in all resumes that the key personnel proposed have:

(1) a minimum of 5 years of specialized experience in their field; AND

(2) experience on projects same/similar to the work in this solicitation working in the position they are assigned to under this contract.

Failure to demonstrate the minimally acceptability standards under this factor will result in a “NO GO” rating and possible elimination from further consideration for contract award.

TAB 3: FACTOR 3, PAST PERFORMANCE: For the projects listed under the factor for Experience, the Government will query the Contractor Performance Assessment Reporting System (to include ACASS, CCASS, and CPARS) to validate past performance ratings on Department of Defense contracts and any other past performance information the Government deems necessary to evaluate a contractor’s past performance. Firms without a history of past performance will be given a “go” rating.

For each project that does not have ACASS, CCASS, or CPARS evaluation, Offerors shall forward a copy of the Past Performance Evaluation Questionnaire included at Attachment 1 to the points of contact responsible for monitoring performance under such contracts. These questionnaires shall be returned directly to the Contract Specialist identified in Part I, Paragraph 1. Any questionnaires not returned directly to the Specialist will not be reviewed and evaluated. The information contained in the questionnaires will be used to evaluate the offeror’s past performance. If any negative past performance information is received, the contractor will be given an opportunity to provide rebuttal. Each contractor shall provide at least three (3) past performance ratings. Any rating an offeror has in ACASS, CCASS, and CPARS will count toward this requirement. The offeror is responsible for ensuring that the KO has received a minimum of three (3) questionnaires prior to that date/time or has provided written notification to the KO that they have current ratings in ACASS, CCASS, and CPARS. New entities that have no past customers shall notify the KO in writing, prior to the date and time established for the RFP closing, that they have had no previous clients and that the minimum number of questionnaires cannot be provided. It is the contractor’s responsibility to ensure that the reference documentation is provided, as the Government may not make additional requests for past performance information from the references.

The evaluation form shall be provided to the Contract Specialist directly from the reference. Do not request past performance questionnaires on projects that have final ACASS, CCASS, or CPARS evaluations. If a past performance questionnaire is received on a project where a final ACASS, CCASS, or CPARS evaluation exists, the ACASS, CCASS, or CPARS evaluation will serve as the official rating of record for evaluation purposes.

The Government may contact references provided as part of the Factor for Experience, for information regarding the offeror’s past performance on the project and for the purposes of assessing and verifying the scope of the work performed. Offerors should provide accurate, current, and complete contact information for references provided in the project descriptions.

PAST PERFORMANCE WILL BE EVALUATED BASED ON THE FOLLOWING CRITERIA:

The Government will review all CPARS, ACASS, CCASS evaluations regardless of project and past performance questionnaires for projects submitted under the Factor for Experience. The Government may contact points of contacts listed on the “Experience Information” forms submitted. Offerors must demonstrate the following minimum acceptability standards:

All past or current references must have overall ratings of satisfactory or above.

FAR 15.101-2(b)(1) requires if the KO determines that a small business' past performance is not acceptable, the matter is referred to the SBA for a COC determination.

Failure to demonstrate the minimally acceptable criteria under this factor will result in a “NO GO” rating and elimination from further consideration for contract award. Offerors with no past performance information will receive a “GO” rating for this factor.

ATTACHMENT 1

PAST PERFORMANCE EVALUATION QUESTIONNAIRE

Part I (To be completed by the Offeror)

A. Contract Identification Contractor/Company Name/Division:

Address:

Program Identification/Title:

Contract Number:

Prime Contractor Name (if different from the contractor’s name cited above):

Contract Award Date:

Forecasted or Actual Contract Completion Date:

B. Identification of Offeror’s Representative

Title:

Telephone Number:

FAX Number:

E-mail Address:

Part II. Evaluation (To be completed by Point of Contact – Respondent)

1. Type of Contract: Fixed Price Cost Reimbursement Other (Specify)

2. Description of Work:

3. Complexity of Work: High Mid Routine

4. Location of Work:

5. Status: Active (Please provide percent complete) Complete (Please provide completion date)

OVERALL RATING FOR THE PROJECT:

Outstanding

Above Average

Satisfactory

Marginal

Unsatisfactory

W9126G22R0053

Part III – Respondent Identification

Organization:

Title:

Date:

Telephone Number:

Address:

Fax Number:

E-mail Address:

Part IV – Return Information Please return this completed Questionnaire to the Contract Specialist identified below. Contract

Contract Specialist – Primary POC U.S. Army Corps of Engineers, SWF-CT: Civil Works/Construction Section ATTN: <Amd01> Sequoria Wilson Shayla Lucas </Amd01> 819 Taylor Street, RM 2A19 Fort Worth, TX 76102

Phone: <Amd01> (817) 886-1111 (817) 886-1188 <Amd01>

Email: <Amd01> sequoria.l.wilson@usace.army.mil shayla.j.lucas@usace.army.mil <Amd01>

(End of Summary of Changes)

File details come from the government source that posted it. Updated .