Weston hills 2024
Closed Solicitation Posted
- Solicitation number
- 140L6224R0008
- Agency
-
Wyoming Region
Bureau of Land Management, Department of the Interior
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- 1425 Fort St Buffalo WY
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Department of the Interior Bureau of Land Management (BLM) Wyoming Region is seeking offers for a firm-fixed-price construction contract to perform work on the Weston Hills road in Campbell County, Wyoming. The scope of work includes ditch blading, installing an 18-inch culvert, repairing water bars, and screening and stockpiling borrow material. Proposals are due by August 19, 2024 at 2:00 pm Mountain Time, and a pre-proposal site visit is scheduled for August 7, 2024. The contract will be awarded based on a Lowest Price Technically Acceptable (LPTA) evaluation.
This contract opportunity is a 100% small business set-aside under NAICS code 237310 (Highway, Street, and Bridge Construction). The contract value is between $25,000 and $100,000, and the performance period is 60 calendar days from the notice to proceed. The work will be performed at various locations along the Weston Hills road in Campbell County, Wyoming.
Notice text
Furnishing labor, equipment, supplies, and materials to perform ditch blading (75 feet), install one eighteen (18) inch CMP culvert 25 ft. in length. Repair existing 10 water bars, screen and stockpile 150 cubic yards of in-situ borrow with a 3 inch minus screen. Rejected aggregate greater than 3 inches can remain at the borrow site. The stockpiled aggregate will also be at the borrow site. The contractor shall provide at least one week notice to the BLM before starting work on the road. The road has aggregate surfacing. A Pre-award site visit will occur at the Weston Road.
Location: Work under this Contract is in Campbell County, Wyoming.
Weston Hills road entrance: 44.6371, -105.33629
Weston Hills In-situ borrow area and stockpile area: 44.63858, -105.38081.
Weston Hills 18¿ CMP culvert installation and ditch blading: 44.64308, -105.38584
Existing water bars repair, TBD upon pre-bid site visit.
Files
| File | Type | Posted |
|---|---|---|
| Sol_140L6224R0008.pdf | ||
| Wage_Determination.pdf | ||
| A04_BFO_Weston_Hills_2024_SOW.doc | DOC document |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| WY BR WYAO US20(1) US 20 and Hayden Arch Bridge Repairs | Federal Highway Administration | No set-aside | |
| 4 GAOA Flaming Gorge Water System Buckboard in Ashley NF, Wyoming | Forest Service | Total Small Business | |
| GRTE 237343 - Rehab 4 Lazy F Ranch | National Office | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity