Waste Water Treatment Plant Renovations, Ft. McCoy, WI
Closed Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- W9128F-20-R-0082
- Agency
-
ENDIST Omaha
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237110 Water and Sewer Line and Related Structures Construction
- Place of performance
- Fort McCoy WI 54656 USA
Notice details come from SAM.gov. Updated .
About this opportunity
This pre-solicitation notice is for upgrades and renovations to the Waste Water Treatment Plant at Fort McCoy, Wisconsin. The U.S. Army Corps of Engineers Engineering District Omaha will replace the influent wet well, construct an oxidation ditch, replace sludge pumps, replace the existing UV disinfection system with a more energy efficient system, install additional air diffusers, construct a new building to house blowers and pumps, and install PLC systems for new process equipment control with feedback to the existing control building. Offerors must be registered in SAM and proposals will be evaluated based on specialized experience, project management plan, key personnel, small business participation, and past performance using an adjectival method. The RFP will be issued on June 8, 2020 with questions due by that date.
There is no set-aside designated for this procurement. The estimated construction cost is between $8-12 million and the contractor must commence work within 10 days of notice to proceed and complete the work within 665 calendar days. Performance and payment bonds will be required.
Notice text
This acquisition is for the following upgrades, replacements, and construction at the Ft McCoy Wisconsin, Waste Water Treatment Plant (WWTP): Replace the Influent Wet Well , Construct an Oxidation Ditch, Replace the Sludge Pumps, Replace the existing UV disinfection system with a more energy efficient system, Install additional air diffusers, Construct a new building to house the blowers for the converted Aerobic Digester and the new RAS and WAS pumps and control systems. Install PLC system(s) for all new process equipment control and provide control/feedback loop to existing Control Building for eventual integration (by others) into future supervisory control and data acquisition.
Files
| File | Type | Posted |
|---|---|---|
| Pre-Solicitation_Ft McCoy_Revised.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Waste Water Treatment Plant Renovations, Ft. McCoy, WI | Award Notice | |
| Waste Water Treatment Plant Renovations, Ft. McCoy, WI | Solicitation | |
| This notice | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Upgrade multiple campsites at pineview campground | MICC Fort McCoy | Service-Disabled Veteran-Owned Small Business | |
| Design-Bid-Build - Rough River Lake Axtel Wastewater Treatment Plant (WWTP) | ENDIST Louisville | No set-aside | |
| Waste Water Treatment Plant Services | Air Forces Europe and Africa | No set-aside | |
| WWYK240015 - Rehab Tanks 62501E & 62501W | Air Force Sustainment Center | No set-aside |