WA NP MORA 123(2) SR-123: Laughingwater Creek Bridge to Panther Creek Bridge

Pre-Solicitation Posted

This opportunity was awarded. See the award notice from , or the latest solicitation from .

Solicitation number
69056723B000008
Agency
Responses due
Not on record
Set-aside
No set-aside

Opportunity facts

Place of performance
Washington, United States
Points of contact

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of Transportation Federal Highway Administration is seeking bids for a highway construction project on State Route 123 in Washington, between the Laughingwater Creek Bridge and Panther Creek Bridge. The work includes subexcavation, grading, drainage, stone masonry, bridge surfacing, and paving. Technical and general questions can be submitted by email, and solicitation documents will be available in the summer of 2024, with the actual release date to be posted on the SAM.gov website.

The pre-solicitation notice does not indicate any set-aside designations. The estimated price range for the work is between $7 million and $10 million, with a tentative completion date of fall/winter 2024/2025. The project involves replacing two bridges and performing other highway construction and repair work along a 2.79-mile stretch of road within Mount Rainier National Park.

Notice text

3 versions

Update #3 · Latest ·

Updated Presolicitation Notice

Project: WA NP MORA 123(2)  SR-123: Laughingwater Creek Bridge to Panther Creek Bridge

This project calls for asphalt roadway surfacing, subsurfacestrengthening within the roadway, re-grading at inlet and outlet of select culvert, thin epoxy overlay, new signing and striping, erosion control and protection, and the construction of new
box culverts along 2.77 miles of roadway at the Mount Rainier National Park.

Estimated Price Range: Between $10  and $20 Million

Tentative Solicitation Date: Spring/Summer 2024

Tentative Completion Date: Summer 2027

This will be solicited as Full and Open 

Update #2 ·

Updated Presolicitation Notice

Project: WA NP MORA 123(2)  SR-123: Laughingwater Creek Bridge to Panther Creek Bridge

This project calls for asphalt roadway surfacing, subsurfacestrengthening within the roadway, re-grading at inlet and outlet of select culvert, thin epoxy overlay, new signing and striping, erosion control and protection, and the construction of new
box culverts along 2.77 miles of roadway at the Mount Rainier National Park.

Estimated Price Range: Between $10  and $20 Million

Tentative Solicitation Date: Spring/Summer 2024

Tentative Completion Date: Summer 2027

This will solicited as Full and Open 

Update #1 ·

Project: WA NP MORA 123(2)  SR-123: Laughingwater Creek Bridge to Panther Creek Bridge

See attachments for additional information.

Files

Notice history

Notice Type Posted
WA NP MORA 123(2) SR-123: Laughingwater Creek Bridge to Panther Creek Bridge Award Award Notice
WA NP MORA 123(2) SR-123: Laughingwater Creek Bridge to Panther Creek Bridge Latest solicitation Solicitation
WA NP MORA 123(2) SR-123: Laughingwater Creek Bridge to Panther Creek Bridge Pre-Solicitation
This notice Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
WA ERFO NPS OLYM 2022-1(3), OLYMPIC NPS ERFO REPAIRS 2022 Road 107 MP 0.3 TO 0.5 & MP 0.8 Forks, Washington, United States · NAICS 237310 Federal Highway Administration No set-aside
WA NP OLYM 12(8), Hurricane Ridge Rockfall Mitigation MP 9.4 Port Angeles, Washington, United States · NAICS 237310 Federal Highway Administration Total Small Business
UT NP ARCH 100(2) Bridges on Delicate Arch Road Moab, Utah 84532, United States · NAICS 237310 Federal Highway Administration No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors