Vglz 182035 repair base perimeter road
Closed Pre-Solicitation Posted
Not the latest version. See the latest solicitation from .
- Solicitation number
- W50S8526BA001
- Agency
-
Michigan National Guard
Army National Guard, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Selfridge Angb Base Perimeter Road to include the main drive onto the base and some higher traffic areas. Road work to be done all around the base perimeter road. 48045
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Army Michigan Army National Guard is seeking contractor services for the repair of base perimeter road infrastructure. The procurement involves the construction and repair of approximately 4.2 miles of roadway, including 2 and 3-lane roads, with Jefferson Avenue comprising one mile of the total project scope. Key contract requirements include full-depth pavement repairs, mill/overlay operations, crack repairs, installation of subsurface edge drainage, localized grading to address drainage deficiencies, and new paint and markings on all new pavement surfaces. The contractor must maintain constant traffic flow during construction, obtain and comply with a Macomb County Soil Erosion Permit, and remove and reinstall steel wedge barriers and jersey barriers per security staff direction. Interested vendors must respond through the Procurement Integrated Enterprise Environment (PIEE) by March 17, 2026, submitting full capabilities statements that include socio-economic status, applicable NAICS codes, prior experience in road construction and repair, past performance records, government contract numbers for highway work, and bonding status letters from financial institutions.
This procurement carries no set-aside designation and does not identify any incumbent contractors or award value. The project scope encompasses Highway, Street, and Bridge Construction (NAICS 237310) and falls under the PSC category Y1LB for Construction of Highways, Roads, Streets, Bridges, and Railways. The base perimeter road surfacing will be primarily Hot Mix Asphalt (HMA) pavement, and all work must be completed in accordance with specified drawings, project specifications, and the Statement of Work, with the SOW sections superseding any conflicting specification requirements to ensure the most stringent standards are applied. Work will be coordinated with Base Operations throughout the project execution, and contractors must demonstrate relevant experience and qualifications in road construction and repair projects to be considered for this federal contract opportunity.
Notice text
2 versions
Update #2 · Latest ·
The work shall be in strict compliance with the SOW, the project specifications, and the project drawings. Sections of the SOW may supersede the requirements found in the specifications, in which case, the more stringent/higher quality requirements will apply. All work will be coordinated with Base Operations. A Macomb County Soil Erosion Permit will be required for this project. The Contractor shall obtain, pay for, and follow the requirements of this permit. The work will consist of Construction of new 2 and 3 lane roads. The requirement includes full-depth pavement repairs, mill/overlay, crack repairs, and work along the entire Perimeter Road and Jefferson Ave. All work will be completed IAW drawings Repair Perimeter Rd VGLZ 182035. Installation of subsurface edge drainage for all new pavement sections. Localized grading of the project site to address current inadequate drainage. New paint and markings on all new pavements. The Contractor must maintain a constant flow of traffic during construction. Base perimeter road surfacing to be primarily of HMA Pavement. Existing base perimeter road distance to be resurfaced unofficially is 4.2 miles of primarily two and three lane road, with Jefferson Ave from Main Gate to Wilbur Wright Blvd. being three lanes. Those three lanes make up one mile of the projects 4.2 total miles. Contractor to remove and reinstall steel wedge barriers and jersey barriers throughout construction per the direction of SANGB Security Staff. Steel barriers to be reinstalled at grade to match pre-construction condition. Interested vendors should respond to this sources sought announcement through the Procurement Integrated Enterprise Environment (PIEE) solicitation module by providing a full capabilities statements, socio-economic status, applicable NAICS codes, prior experience in road construction and repair, past performance, government contract numbers for highway work, bonding status letter from financial institution, Please see Sources Sought Notice attached with this announcement. (See attachments for further needed information)
Update #1 ·
The work shall be in strict compliance with the SOW, the project specifications, and the project drawings. Sections of the SOW may supersede the requirements found in the specifications, in which case, the more stringent/higher quality requirements will apply. All work will be coordinated with Base Operations. A Macomb County Soil Erosion Permit will be required for this project. The Contractor shall obtain, pay for, and follow the requirements of this permit. The work will consist of Construction of new 2 and 3 lane roads. The requirement includes full-depth pavement repairs, mill/overlay, crack repairs, and work along the entire Perimeter Road and Jefferson Ave. All work will be completed IAW drawings Repair Perimeter Rd VGLZ 182035. Installation of subsurface edge drainage for all new pavement sections. Localized grading of the project site to address current inadequate drainage. New paint and markings on all new pavements. The Contractor must maintain a constant flow of traffic during construction. Base perimeter road surfacing to be primarily of HMA Pavement. Existing base perimeter road distance to be resurfaced unofficially is 4.2 miles of primarily two and three lane road, with Jefferson Ave from Main Gate to Wilbur Wright Blvd. being three lanes. Those three lanes make up one mile of the projects 4.2 total miles. Contractor to remove and reinstall steel wedge barriers and jersey barriers throughout construction per the direction of SANGB Security Staff. Steel barriers to be reinstalled at grade to match pre-construction condition. Interested vendors should respond to this sources sought announcement through the Procurement Integrated Enterprise Environment (PIEE) solicitation module by providing their full capabilities statements to include socio-economic status and applicable NAICS codes, and prior experience in road construction and repair. Please see Sources Sought Notice attached with this announcement.
Notice history
| Notice | Type | Posted |
|---|---|---|
| Vglz 182035 repair base perimeter road | Solicitation | |
| Vglz 182035 repair base perimeter road | Pre-Solicitation | |
| This notice | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| W912EK27BA003 - Detroit Project Office Detroit, MI Wayne County Roads, Parking, and Grounds Renovation | ENDIST Rock Island | Competitive 8(a) | |
| WWYK100209-Repair Perimeter Dr and Industrial Blvd | Air Force Sustainment Center | Woman-Owned Small Business Sole Source |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity