Verde solar panel expansion

Award Notice Posted

Solicitation number
AG-8191-S-16-0012
Agency
Awarded
to Sky Construction And Engineering, Inc.
Set-aside
Total Small Business

Opportunity facts

Contract number
AG8191C160005 Federal contract award
PSC
Not on record
Place of performance
Verde Ranger District 300 Highway 260 Camp Verde, Arizona 86322, United States

Notice details come from SAM.gov. Updated .

Notice text

3 versions

Update #3 · Latest ·

The purpose of this amendment is to change the Schedule of Items (change the base bid description and delete the additive bid item), Statement of Work, and correct the magnitude of the contract.

Please see attachment.

Update #2 ·

Verde Ranger District Solar Panel Expansion Amendment 0001

The purpose of this amendment is for clarification purposes and to respond to questions from emails and prebid that was scheduled on August 10, 2016.

Update #1 ·

Verde Ranger District Solar Panel Expansion


Notice of 100% Set-Aside Total Small Business Concerns


This project consists of providing all labor, supervision, materials, equipment and incidentals to complete the project of work in the solicitation and the resulting contract.


This project will consist of a project on the Verde Ranger District, Prescott National Forest. The intent of this project is to design, supply and installation of a ground-mount two-axis tracking photovoltaic (PV) system at the USDA Forest Service's Verde Ranger District Office in the Prescott National Forest and shall include all components for a complete and operational system when finished. The supplier will be required to coordinate tie-in with Arizona Public Service Electric Company (APS) for net-metering. The supplier will also be required to work with APS to receive any discounts or credits available for install for solar related products. Proposal shall include all labor, equipment, materials to install and hookup a complete system as required.


Project Location: Verde Ranger District, 300 Highway 260 Camp Verde, AZ 86322


Estimated project start date is September 15, 2016. Quotes are due August 31, 2016. Alternate Payment Protection is required. Price range is estimated between $100,000.00 and $150,000.00. NAICS Code 238210 applies. Small Business Size Standard is $15.0 million. Project is set-aside 100% for TOTAL SMALL BUSINESS CONCERNS.

Files

File Type Posted
amendment_0002.pdf PDF
AG-8191-S-16-0012_Amd_000001.pdf PDF
APS_utility_bills.pdf PDF
VerdeRangerStationAdminSitePlan04252015.pdf PDF
site_plans.pdf PDF
Verde_PV_info.pdf PDF
Verde_Energy_Audit_-_Solar_exerpt.pdf PDF
Prescott_Fire_Plan.doc DOC document
Past_Performance_Questionnaire.docx DOCX document
AG-8191-S-16-0012.pdf PDF
Photos.docx DOCX document
WD_AZ35.docx DOCX document
Show all 12

Notice history

Notice Type Posted
Verde solar expansion project Latest Award Notice
This notice Original Award Notice

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors