VA786-17-0154 | Massachusetts NC, | For: Non-Hazardous Waste Removal Services. | Previous contract VA786-12-C-0112 (NEIE Medical Waste Services, LLC)

Award Notice Posted

Solicitation number
VA78617R0154
Agency
Awarded
to DBI Waste Systems Inc.
Set-aside
Service-Disabled Veteran-Owned Small Business

Opportunity facts

Contract number
VA78617C0065 Federal contract award
NAICS code
562111 Solid Waste Collection
PSC
Not on record
Place of performance
Massachusetts National Cemetery Off Connery Avenue Bourne, MA 02532. 02532 USA

Notice details come from SAM.gov. Updated .

Notice text

SUPPLIES OR SERVICES & PRICES / COSTS



PRICE SCHEDULE: The Contractor shall furnish (F.O.B. Destination within consignee s premises) all personnel, equipment, supplies, materials, vehicles and other items / services necessary and incident to the provision NON-HAZARDOUS WASTE (TRASH) COLLECTION & REMOVAL SERVICES at the Massachusetts National Cemetery, Off Connery Avenue, Bourne, MA 02532. Services shall be provided on a weekly scheduled and as needed / as requested basis.

SITE VISIT: Offerors or quoters are urged and expected to inspect all sites where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance. In no event shall failure to inspect a one or all sites constitute grounds for a claim after contract award. If you plan to conduct a site visit / inspection of the Massachusetts National Cemetery, YOU MUST CONTACT one of the following personnel to make arrangements:



John Spruyt, Cemetery Director................................................... (508) 563-7113

Theresa Souza, Program Assistant . (508) 563-7113

FAX.............................................................................................. (508) 563-3702



Duration: The term of the contract January 2017 (or date of award whichever is sooner) thru September 30, 2017 with four (4) one year renewal options.



Type of Contract: This is a firm-fixed price type contract for the supplies / services specified and effective for the period stated in the Schedule. The unit price is all-inclusive and covers complete trash removal per line item. Quantities of services specified in the Price Schedule are estimates only and are not purchased by this contract. Evaluated via FAR 15.101-2 Lowest Price Technically Acceptable (LPTA)



Rates: If the landfill used by the Contractor for disposal of waste / trash picked-up under this contract adjusts its tonnage fee for disposal, that fact shall not constitute the basis for an equitable price adjustment.



Base Year: January 2017 or From Date of Award thru September 30, 2017

CLIN

DESCRIPTION

EST

QTY

UNIT

UNIT COST

TOTAL EST COST

0001

One (1) 6 Cubic Yard front load Container (new / like new condition) to be placed within Massachusetts National Cemetery Maintenance Facility Area . Monthly cost to include container rental and scheduled weekly removal (by Load / not Weight - estimated @ 52 total Loads per year).

MO

12

$ _________

$ ___________

0002

Rental of one (1) 30 Cubic Yard Open Top Roll-off Dumpster (new / like new condition). To be placed within Massachusetts National Cemetery Spoils Area .

MO

12

$ _________

$ ___________

0003

Dump Fee: Roll-off, Dump & Return Service for 30 Cubic Yard Open Top Dumpster listed in CLIN 0002 above. Services to be provided on an On-Call as-needed basis.

EA

12

$ _________

$ ___________

0004

Landfill Tonnage Fee to empty Container in CLIN 0002 above (estimated @ 36 tons for Base Year Period).

TON

36

$ _________

$ ___________

0005

Wreath Pick Up Haul: Provide & Haul 30 yd. roll off container for removal of Christmas wreaths from Wreaths Across America

2

Ea.

$ _________

$ ___________



GRAND TOTAL ESTIMATED COST:

$___________







Option Year I: October 1, 2017 thru September 30, 2018

CLIN

DESCRIPTION

EST

QTY

UNIT

UNIT COST

TOTAL EST COST

1001

One (1) 6 Cubic Yard front load Container (new / like new condition) to be placed within Massachusetts National Cemetery Maintenance Facility Area . Monthly cost to include container rental and scheduled weekly removal (by Load / not Weight - estimated @ 52 total Loads per year).

MO

12

$ _________

$ ___________

1002

Rental of one (1) 30 Cubic Yard Open Top Roll-off Dumpster (new / like new condition). To be placed within Massachusetts National Cemetery Spoils Area .

MO

12

$ _________

$ ___________

1003

Dump Fee: Roll-off, Dump & Return Service for 30 Cubic Yard Open Top Dumpster listed in CLIN 1002 above. Services to be provided on an On-Call as-needed basis.

EA

12

$ _________

$ ___________

1004

Landfill Tonnage Fee to empty Container in CLIN 1002 above (estimated @ 36 tons per year).

TON

36

$ _________

$ ___________

1005

Wreath Pick Up Haul: Provide & Haul 30 yd. roll off container for removal of Christmas wreaths from Wreaths Across America

2

Ea.

$ _________

$ ___________



GRAND TOTAL ESTIMATED COST:

$___________





Option Year II: October 1, 2018 thru September 30, 2019

CLIN

DESCRIPTION

EST

QTY

UNIT

UNIT COST

TOTAL EST COST

2001

One (1) 6 Cubic Yard front load Container (new / like new condition) to be placed within Massachusetts National Cemetery Maintenance Facility Area . Monthly cost to include container rental and scheduled weekly removal (by Load / not Weight - estimated @ 52 total Loads per year).

MO

12

$ _________

$ ___________

2002

Rental of one (1) 30 Cubic Yard Open Top Roll-off Dumpster (new / like new condition). To be placed within Massachusetts National Cemetery Spoils Area .

MO

12

$ _________

$ ___________

2003

Dump Fee: Roll-off, Dump & Return Service for 30 Cubic Yard Open Top Dumpster listed in CLIN 2002 above. Services to be provided on an On-Call as-needed basis.

EA

12

$ _________

$ ___________

2004

Landfill Tonnage Fee to empty Container in CLIN 2002 above (estimated @ 36 tons per year).

TON

36

$ _________

$ ___________

2005

Wreath Pick Up Haul: Provide & Haul 30 yd. roll off container for removal of Christmas wreaths from Wreaths Across America

2

Ea.

$ _________

$ ___________



GRAND TOTAL ESTIMATED COST:

$___________





Option Year III: October 1, 2019 thru September 30, 2020

CLIN

DESCRIPTION

EST

QTY

UNIT

UNIT COST

TOTAL EST COST

3001

One (1) 6 Cubic Yard front load Container (new / like new condition) to be placed within Massachusetts National Cemetery Maintenance Facility Area . Monthly cost to include container rental and scheduled weekly removal (by Load / not Weight - estimated @ 52 total Loads per year).

MO

12

$ _________

$ ___________

3002

Rental of one (1) 30 Cubic Yard Open Top Roll-off Dumpster (new / like new condition). To be placed within Massachusetts National Cemetery Spoils Area .

MO

12

$ _________

$ ___________

3003

Dump Fee: Roll-off, Dump & Return Service for 30 Cubic Yard Open Top Dumpster listed in CLIN 3002 above. Services to be provided on an On-Call as-needed basis.

EA

12

$ _________

$ ___________

3004

Landfill Tonnage Fee to empty Container in CLIN 3002 above (estimated @ 36 tons per year).

TON

36

$ _________

$ ___________

3005

Wreath Pick Up Haul: Provide & Haul 30 yd. roll off container for removal of Christmas wreaths from Wreaths Across America

2

Ea.

$ _________

$ ___________



GRAND TOTAL ESTIMATED COST:

$___________





Option Year IV: October 1, 2020 thru September 30, 2021

CLIN

DESCRIPTION

EST

QTY

UNIT

UNIT COST

TOTAL EST COST

4001

One (1) 6 Cubic Yard front load Container (new / like new condition) to be placed within Massachusetts National Cemetery Maintenance Facility Area . Monthly cost to include container rental and scheduled weekly removal (by Load / not Weight - estimated @ 52 total Loads per year).

MO

12

$ _________

$ ___________

4002

Rental of one (1) 30 Cubic Yard Open Top Roll-off Dumpster (new / like new condition). To be placed within Massachusetts National Cemetery Spoils Area .

MO

12

$ _________

$ ___________

4003

Dump Fee: Roll-off, Dump & Return Service for 30 Cubic Yard Open Top Dumpster listed in CLIN 4002 above. Services to be provided on an On-Call as-needed basis.

EA

12

$ _________

$ ___________

4004

Landfill Tonnage Fee to empty Container in CLIN 4002 above (estimated @ 36 tons per year).

TON

36

$ _________

$ ___________

4005

Wreath Pick Up Haul: Provide & Haul 30 yd. roll off container for removal of Christmas wreaths from Wreaths Across America

2

Ea.

$ _________

$ ___________



GRAND TOTAL ESTIMATED COST:

$___________





(End of Price Schedule)

Files

File Type Posted
VA786-17-R-0154-A00001000.docx DOCX document
VA786-17-R-0154-001.docx DOCX document
VA786-17-R-0154-002.pdf PDF
VA786-17-R-0154-003.pdf PDF
VA786-17-R-0154-000.docx DOCX document

Notice history

Notice Type Posted
Waste Collection Services at Massachusetts NC VA786-17-C-0065 - Solicitation VA786-17-R-0154 Start Date: 02-15-17 | DBI Waste Systems Inc. Latest Award Notice
This notice Original Award Notice

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors