VA GLA waterlines replacement project

Closed Solicitation Posted

Solicitation number
W912PL24B0008
Agency
ENDIST Los Angeles US Army Corps of Engineers, Department of Defense
Responses due
Set-aside
Service-Disabled Veteran-Owned Small Business

Opportunity facts

NAICS code
237110 Water and Sewer Line and Related Structures Construction
PSC
C221 Architect And Engineering- General: Plumbing Systems
Points of contact
More information

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of the Army Corps of Engineers Engineering District Los Angeles is seeking contractors to replace approximately 400 feet of existing water lines at the VA hospital campus in Los Angeles, California. The project involves constructing 5 bypass water lines, replacing the 6" Domestic Hot Water, 8" Cold Water Pressurized, 8" Cold Water Supply, 12" Fire Water, and 6" Condensate lines between Building 501 and Building 500, and then removing the bypass lines. The government estimate for this work is $6,983,761.30. Contractors must have knowledge of and past performance with construction procedures and phasing schedules at VA facilities.

This solicitation is set aside for Service-Disabled Veteran-Owned Small Businesses. Five offers were received, ranging from $4,186,590.00 to $6,882,052.00, with the apparent low offeror being Blue Nose IT Solutions, Inc. at $4,186,590.00. The project will be managed by the Army Corps of Engineers, Los Angeles District, and the contract award date is 06/12/2024.

Notice text

Existing Conditions: Existing 5 main water lines (6? Domestic Hot Water, 8? Cold Water Pressurized, 8? Cold Water Supply, 12? Fire Water, and 6? Condensate) from Building 501 (Chiller Building) to Building 500 (Hospital) including Building 501 basement, Building 500 basement, and the tunnel from 501 to 500. Because these existing water lines are in bad condition/end of their useful life, they need to be replaced to prevent catastrophic failure/see examples below. Objective: Construct 5 bypass lines, approx. 450? and divert water to these pipes. Then replace approx. 400? of the 5 lines. Then remove the bypass lines. Notes:-Current tunnel includes a pipe rack with multiple pipes, and an adjacent walkway. The space is tight. To allow for proper replacement of the 5 pipes, a bypass route has been defined to bypass the lines and allow the hospital to fully function during replacement of pipes.-Contractor to provide all parts, equipment, labor and materials required to make a harmonized removal, for connections of existing wet supply lines and reinstallation of diverse water lines parallel to existing system and consistent with any new piping, fittings, valves, regulators, strainers for regulators, gages, manifold, isolation valves and redundant bypass-Contractor will provide and maintain temporary water service for main hospital during alterations-Contractor must have knowledge of/past performance with methodology of construction procedures/phasing schedules at VA facilities-Not a DB or DBB project-Design being completed at USACE Los Angeles District by USACE Engineers.

Attachments

Files attached to this notice, newest first
File Type Posted
ABSTRACT OF OFFERS W912PL24B0008.pdf PDF
ABSTRACT OF OFFERS W912PL24B0008.pdf PDF

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
VA GLA waterlines replacement project This notice · Latest solicitation Solicitation
VA GLA waterlines replacement project Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity