VA GLA waterlines replacement project

Closed Pre-Solicitation Posted

A newer solicitation was posted. See the latest solicitation from .

Solicitation number
W912PL24B0008
Agency
ENDIST Los Angeles US Army Corps of Engineers, Department of Defense
Responses due
Set-aside
Service-Disabled Veteran-Owned Small Business

Opportunity facts

NAICS code
237110 Water and Sewer Line and Related Structures Construction
PSC
C221 Architect And Engineering- General: Plumbing Systems
Place of performance
Los Angeles, California 90037, United States
Points of contact

Notice details come from SAM.gov. Updated .

About this opportunity

Paragraph 1:

The Department of the Army Corps of Engineers Engineering District Los Angeles is seeking to procure the replacement of existing water lines at the VA GLA facility. The project involves constructing 5 bypass lines, replacing approximately 400 feet of the 5 existing water lines (6" Domestic Hot Water, 8" Cold Water Pressurized, 8" Cold Water Supply, 12" Fire Water, and 6" Condensate), and then removing the bypass lines. Key contract requirements include providing all parts, equipment, labor, and materials, maintaining temporary water service for the main hospital during the alterations, and demonstrating knowledge and past performance with construction procedures and phasing schedules at VA facilities. The project is not a design-build or design-bid-build project, as the design is being completed by USACE engineers.

Paragraph 2:

This opportunity is set aside for Service-Disabled Veteran-Owned Small Businesses. The posting does not mention any potential incumbent contractors. The project scope and budget details are provided, indicating approximately 450 feet of bypass lines and 400 feet of water line replacements. The posting has a due date of July 18, 2024, suggesting the project timeline is relatively short.

Notice text

Existing Conditions: Existing 5 main water lines (6” Domestic Hot Water, 8” Cold Water Pressurized, 8” Cold Water Supply, 12” Fire Water, and 6” Condensate) from Building 501 (Chiller Building) to Building 500 (Hospital) including Building 501 basement, Building 500 basement, and the tunnel from 501 to 500. Because these existing water lines are in bad condition/end of their useful life, they need to be replaced to prevent catastrophic failure/see examples below.

Objective:  Construct 5 bypass lines, approx. 450’ and divert water to these pipes.  Then replace approx. 400’ of the 5 lines.  Then remove the bypass lines. 

Notes:

-Current tunnel includes a pipe rack with multiple pipes, and an adjacent walkway.  The space is tight.  To allow for proper replacement of the 5 pipes, a bypass route has been defined to bypass the lines and allow the hospital to fully function during replacement of pipes.

-Contractor to provide all parts, equipment, labor and materials required to make a harmonized removal, for connections of existing wet supply lines and reinstallation of diverse water lines parallel to existing system and consistent with any new piping, fittings, valves, regulators, strainers for regulators, gages, manifold, isolation valves and redundant bypass

-Contractor will provide and maintain temporary water service for main hospital during alterations

-Contractor must have knowledge of/past performance with methodology of construction procedures/phasing schedules at VA facilities

-Not a DB or DBB project

-Design being completed at USACE Los Angeles District by USACE Engineers.

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
VA GLA waterlines replacement project Latest solicitation Solicitation
VA GLA waterlines replacement project This notice · Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity