UT-jones hole NFH-rehab weir at bypass

Closed Solicitation Posted

Solicitation number
140FGA25Q0040
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of the Interior Fish and Wildlife Service is soliciting proposals for the rehabilitation of the bypass weir at Jones Hole National Fish Hatchery in Vernal, Utah, specifically to prevent New Zealand Mud Snail infestation through copper-based engineering solutions. The project involves demolishing two existing steel-plated weirs, removing accumulated sediment, and reconstructing them with specific modifications including extending the weir height by 5 feet, installing six 18-inch copper-lined pipes, and covering the structures with 18-gauge copper sheeting. A mandatory site visit is scheduled for August 4, 2025, at 11:00 AM local time, and contractors must RSVP to participate. Questions are due by 2:00 PM EST on August 7, 2025, with proposal responses due by 2:00 PM EST on August 19, 2025. The contract will be awarded using a Lowest Price Technically Acceptable (LPTA) evaluation approach, considering factors such as price, past experience, and past performance, with offerors required to submit Standard Form 1442, pricing schedules, three examples of similar past projects, and representations and certifications.

This opportunity is designated as a 100% small business set-aside under NAICS code 237990 (Other Heavy and Civil Engineering Construction) with a size standard of $45 million, and the estimated project value ranges between $25,000 and $100,000. No current incumbent contractors are identified in the solicitation documents. The contractor must complete all work within 30 calendar days of receiving the Notice to Proceed, with the performance period established from September 15, 2025, to October 15, 2025, and must begin work within 10 days of the Notice to Proceed. The work will be performed at Jones Hole National Fish Hatchery located at 24400 E Jones Hole, Hatchery Rd, Vernal, UT 84078, with typical working hours from 7:30 AM to 4:00 PM Monday through Friday. The contractor will have access to electricity, water, and sewer facilities at the site and must manage water flow of approximately 15,000 gallons per minute during construction.

Notice text

UT-JONES HOLE NFH-REHAB WEIR AT BYPASS

Files

File Type Posted
Sol_140FGA25Q0040_Amd_0003.pdf PDF
Questions_and_Answers_Amendment_3_0003.pdf PDF
Questions_and_Answers_and_Revised_SOW_Amendment_2_0002.pdf PDF
Sol_140FGA25Q0040_Amd_0002.pdf PDF
Revised_SOW_Amendment_1_0001.pdf PDF
Sol_140FGA25Q0040_Amd_0001.pdf PDF
Sol_140FGA25Q0040.pdf PDF
DOL_Wage_Determination.pdf PDF
Price_Schedule.pdf PDF
SOW.pdf PDF
Notice_to_Offerors.pdf PDF
Show all 11

Similar open opportunities

Opportunity Agency Set-aside Responses due
Bassie spring improvement project NAICS 238990 Nevada Region Total Small Business
ID-KOOSKIA NFH-Repair Electrical Service to Mechan NAICS 236220 — Total Small Business
Hickman Wildlife Water Catchment and Pipe Fence NM · NAICS 238910 New Mexico Region Total Small Business
FWS - Pixley NWR Water Recirculation Design-Build NAICS 237990 — Total Small Business
ID-kooskia national fish- gutter rplcmnt NAICS 238170 — No set-aside