UT FLAP 70131(1), Strawberry Sheep Creek
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- 6982AF19B000021
- Agency
-
Federal Highway Administration
Department of Transportation
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- PSC
- Not on record
- Place of performance
- Uinta-Wasatch-Cache National Forest, Utah, United States
Notice details come from SAM.gov. Updated .
Notice text
2 versions
Update #2 · Latest ·
The solicitation has been posted at: https://www.fbo.gov/spg/DOT/FHWA/68/6982AF19B000021/listing.html.
Update #1 ·
THIS IS AN INVITATION TO BID, PLANS AND SPECIFICATIONS ARE CURRENTLY AVAILABLE. THIS PROJECT IS ADVERTISED ON A FULL AND OPEN BASIS.
PROJECT NUMBER: UT FLAP 70131(1)
PROJECT NAME: Strawberry Sheep Creek
PROJECT DESCRIPTION:
Strawberry Sheep Creek connector is a 31.9 mile route that connects US-6 to US-40 through the Uinta-Wasatch-Cache National Forest (USFS) in both, Utah and Wasatch Counties, and includes Sheep Creek - Rays Valley Road (FR70051), Unicorn Ridge - Indian Creek Road (FR70042), and West Side Strawberry Road (FR70131).
The base Schedule A consists of road widening, reconstruction, asphalt surfacing, drainage, and safety improvements to the unpaved 12.24 miles of Unicorn Ridge-Indian Creek Road (FR70042) between the intersections with Sheep Creek - Rays Valley Road (FR70051) and West Side Strawberry Road (FR70131). Major work elements for Schedule A include widening the roadway to a consistent width and vertical and horizontal alignment changes to correct roadway geometry and improve safety. Construction will generally include cut slopes, embankment, rockery/rock embankment slope treatments, reinforced soil slopes, aggregate base course, and paving. Improvements include clearing roadside vegetation, stabilization of shoulders, drainage improvements, pavement markings, and updating signing. Select pullouts and access road intersections will also be rehabilitated.
Significant Quantities of Schedule A:
Item
Unit
Estimated Quantity
Clearing and Grubbing
ACRE
90
Embankment
CUYD
23,000
Reinforcement Geosynthetic
SQYD
34,000
RipRap
CUYD
540
Rock Embankment
CUYD
2,750
Rockery
SQFT
8,460
Aggregate Base
TON
58,000
Hot-Asphalt Concrete Pavement
TON
36,000
Culverts
LNFT
3,700
Structural Plate Culvert
LNFT
125
Concrete Curb
LNFT
5,100
Seeding and Mulching
ACRE
50
Option X consists of 7.00 miles of pavement preservation of Sheep Creek - Rays Valley Road (FR70051) from US-6 to the intersection with Unicorn Ridge - Indian Creek Road (FR70042) (start of Schedule A). Construction will generally include ditch reconditioning, patching, crack sealing, and chip sealing the existing pavement surface. Additional improvements include pavement markings and updating signing.
Significant Quantities of Option X:
Item
Unit
Estimated Quantity
Ditch Reconditioning
Mile
6
Subexcavation
CUYD
300
Pavement Patching
SQYD
4,500
Emulsified Asphalt
TON
175
Chip Seal
SQYD
101,600
Option Y consists of road rehabilitation of West Side Strawberry Road (FR70131) from the intersection with Unicorn Ridge - Indian Creek Road (FR70042) (end of Schedule A) extending 3.75 miles towards the North. Construction will generally include ditch reconditioning, partial pulverizing and asphalt overlay, and chip seal. Additional improvements include pavement markings and updating signing.
Significant Quantities of Option Y:
Item
Unit
Estimated Quantity
Subexcavation
CUYD
800
Full Depth Reclamation
SQYD
28,900
Hot-Asphalt Concrete Pavement
TON
5,400
Emulsified Asphalt
TON
45
Chip Seal
SQYD
26,100
MISCELLANEOUS: Road closures to public traffic are allowed in Schedule A, Unicorn Ridge-Indian Creek Road (FR70042), during a large portion of the construction activities. Access through the closure to USFS permit holders will be required at all times.
Due to weather restrictions, on-site construction typically cannot occur until May with a winter shutdown required between 2020 and 2021 construction seasons.
Anticipated Schedule:
Award: November/December 2019
Notice to Proceed: May 2020
The anticipated cost range is between $15 million and $20 million.
This solicitation will be a full and open competition.
.
Files
Notice history
| Notice | Type | Posted |
|---|---|---|
| UT FLAP 70131(1), Strawberry Sheep Creek | Award Notice | |
| This notice | Solicitation | |
| UT FLAP 70131(1), Strawberry Sheep Creek | Solicitation |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity