UT FLAP 70131(1), Strawberry Sheep Creek
Closed Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- 6982AF19B000021
- Agency
-
Federal Highway Administration
Department of Transportation
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Uinta-Wasatch-Cache National Forest, Utah, United States
Notice details come from SAM.gov. Updated .
Notice text
3 versions
Update #3 · Latest ·
Bid Tabs
Update #2 ·
Strawberry Sheep Creek connector is a 31.9 mile route that connects US-6 to US-40 through the Uinta-Wasatch-Cache National Forest (USFS) in both, Utah and Wasatch Counties, and includes Sheep Creek – Rays Valley Road (FR70051), Unicorn Ridge – Indian Creek Road (FR70042), and West Side Strawberry Road (FR70131).
The base Schedule A consists of road widening, reconstruction, asphalt surfacing, drainage, and safety improvements to the unpaved 12.24 miles of Unicorn Ridge-Indian Creek Road (FR70042) between the intersections with Sheep Creek – Rays Valley Road (FR70051) and West Side Strawberry Road (FR70131). Major work elements for Schedule A include widening the roadway to a consistent width and vertical and horizontal alignment changes to correct roadway geometry and improve safety. Construction will generally include cut slopes, embankment, rockery/rock embankment slope treatments, reinforced soil slopes, aggregate base course, and paving. Improvements include clearing roadside vegetation, stabilization of shoulders, drainage improvements, pavement markings, and updating signing. Select pullouts and access road intersections will also be rehabilitated.
Significant Quantities of Schedule A:
|
Item |
Unit |
Estimated Quantity |
|
Clearing and Grubbing |
ACRE |
90 |
|
Embankment |
CUYD |
23,000 |
|
Reinforcement Geosynthetic |
SQYD |
34,000 |
|
RipRap |
CUYD |
540 |
|
Rock Embankment |
CUYD |
2,750 |
|
Rockery |
SQFT |
8,460 |
|
Aggregate Base |
TON |
58,000 |
|
Hot-Asphalt Concrete Pavement |
TON |
36,000 |
|
Culverts |
LNFT |
3,700 |
|
Structural Plate Culvert |
LNFT |
125 |
|
Concrete Curb |
LNFT |
5,100 |
|
Seeding and Mulching |
ACRE |
50 |
Significant Quantities of Option X:
|
Item |
Unit |
Estimated Quantity |
|
Ditch Reconditioning |
Mile |
6 |
|
Subexcavation |
CUYD |
300 |
|
Pavement Patching |
SQYD |
4,500 |
|
Emulsified Asphalt |
TON |
175 |
|
Chip Seal |
SQYD |
101,600 |
Option Y consists of road rehabilitation of West Side Strawberry Road (FR70131) from the intersection with Unicorn Ridge – Indian Creek Road (FR70042) (end of Schedule A) extending 3.75 miles towards the North. Construction will generally include ditch reconditioning, partial pulverizing and asphalt overlay, and chip seal. Additional improvements include pavement markings and updating signing.
Significant Quantities of Option Y:
|
Item |
Unit |
Estimated Quantity |
|
Subexcavation |
CUYD |
800 |
|
Full Depth Reclamation |
SQYD |
28,900 |
|
Hot-Asphalt Concrete Pavement |
TON |
5,400 |
|
Emulsified Asphalt |
TON |
45 |
|
Chip Seal |
SQYD |
26,100 |
MISCELLANEOUS: Road closures to public traffic are allowed in Schedule A, Unicorn Ridge-Indian Creek Road (FR70042), during a large portion of the construction activities. Access through the closure to USFS permit holders will be required at all times.
Due to weather restrictions, on-site construction typically cannot occur until May with a winter shutdown required between 2020 and 2021 construction seasons.
Anticipated Schedule:
Advertise: September 2019
Award: November 2019
Notice to Proceed: May 2020
The anticipated cost range is between $15 million and $20 million.
This solicitation will be a full and open competition.
Update #1 ·
THIS IS NOT AN INVITATION TO BID, PLANS AND SPECIFICATIONS ARE CURRENTLY NOT AVAILABLE.
Strawberry Sheep Creek connector is a 31.9 mile route that connects US-6 to US-40 through the Uinta-Wasatch-Cache National Forest (USFS) in both, Utah and Wasatch Counties, and includes Sheep Creek – Rays Valley Road (FR70051), Unicorn Ridge – Indian Creek Road (FR70042), and West Side Strawberry Road (FR70131).
The base Schedule A consists of road widening, reconstruction, asphalt surfacing, drainage, and safety improvements to the unpaved 12.24 miles of Unicorn Ridge-Indian Creek Road (FR70042) between the intersections with Sheep Creek – Rays Valley Road (FR70051) and West Side Strawberry Road (FR70131). Major work elements for Schedule A include widening the roadway to a consistent width and vertical and horizontal alignment changes to correct roadway geometry and improve safety. Construction will generally include cut slopes, embankment, rockery/rock embankment slope treatments, reinforced soil slopes, aggregate base course, and paving. Improvements include clearing roadside vegetation, stabilization of shoulders, drainage improvements, pavement markings, and updating signing. Select pullouts and access road intersections will also be rehabilitated.
Significant Quantities of Schedule A:
|
Item |
Unit |
Estimated Quantity |
|
Clearing and Grubbing |
ACRE |
90 |
|
Embankment |
CUYD |
23,000 |
|
Reinforcement Geosynthetic |
SQYD |
34,000 |
|
RipRap |
CUYD |
540 |
|
Rock Embankment |
CUYD |
2,750 |
|
Rockery |
SQFT |
8,460 |
|
Aggregate Base |
TON |
58,000 |
|
Hot-Asphalt Concrete Pavement |
TON |
36,000 |
|
Culverts |
LNFT |
3,700 |
|
Structural Plate Culvert |
LNFT |
125 |
|
Concrete Curb |
LNFT |
5,100 |
|
Seeding and Mulching |
ACRE |
50 |
Significant Quantities of Option X:
|
Item |
Unit |
Estimated Quantity |
|
Ditch Reconditioning |
Mile |
6 |
|
Subexcavation |
CUYD |
300 |
|
Pavement Patching |
SQYD |
4,500 |
|
Emulsified Asphalt |
TON |
175 |
|
Chip Seal |
SQYD |
101,600 |
Option Y consists of road rehabilitation of West Side Strawberry Road (FR70131) from the intersection with Unicorn Ridge – Indian Creek Road (FR70042) (end of Schedule A) extending 3.75 miles towards the North. Construction will generally include ditch reconditioning, partial pulverizing and asphalt overlay, and chip seal. Additional improvements include pavement markings and updating signing.
Significant Quantities of Option Y:
|
Item |
Unit |
Estimated Quantity |
|
Subexcavation |
CUYD |
800 |
|
Full Depth Reclamation |
SQYD |
28,900 |
|
Hot-Asphalt Concrete Pavement |
TON |
5,400 |
|
Emulsified Asphalt |
TON |
45 |
|
Chip Seal |
SQYD |
26,100 |
MISCELLANEOUS: Road closures to public traffic are allowed in Schedule A, Unicorn Ridge-Indian Creek Road (FR70042), during a large portion of the construction activities. Access through the closure to USFS permit holders will be required at all times.
Due to weather restrictions, on-site construction typically cannot occur until May with a winter shutdown required between 2020 and 2021 construction seasons.
Anticipated Schedule:
Advertise: September 2019
Award: November 2019
Notice to Proceed: May 2020
The anticipated cost range is between $15 million and $20 million.
This solicitation will be a full and open competition.
Files
Show all 23
Notice history
| Notice | Type | Posted |
|---|---|---|
| UT FLAP 70131(1), Strawberry Sheep Creek | Award Notice | |
| UT FLAP 70131(1), Strawberry Sheep Creek | Solicitation | |
| This notice | Solicitation |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity