USS ZUMWALT-Long Lead Time Material-Boat Handling Transfer Device Assembly- Redacted J&A
Awarded Limited / Sole Source Justification Posted
- Solicitation number
- N5523624C0001
- Agency
-
Naval Sea Systems Command
Department of the Navy, Department of Defense
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- N5523624C0001 Federal contract award
- Awardee
- Jered LLC
- NAICS code
- 332312 Fabricated Structural Metal Manufacturing
- PSC
- 2040 Marine Hardware And Hull Items
- Place of performance
- San Diego, California 92136, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This Limited/Sole Source Justification Notice from the Department of the Navy Naval Sea Systems Command seeks approval for a sole source procurement of a boat handling transfer device assembly from Jered LLC for the USS Zumwalt. The Southwest Regional Maintenance Center requires the proprietary replacement part, with an estimated value of $1,741,571.39, in order to support repairs of the USS Zumwalt during a scheduled drydocking in FY2024. As the original equipment manufacturer, Jered LLC is the only source able to meet the Navy's requirement that the replacement part be compatible in form, fit, and function with the equipment currently installed on the ship.
Notice text
Awarded contract N5523624C0001 to unknown vendor for unknown amount on 2023-12-07.
Files
| File | Type | Posted |
|---|---|---|
| JA USS ZUMWALT Boat Handling Device_FINAL.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Limited / Sole Source Justification | |
| USS ZUMWALT-Long Lead Time Material-Boat Handling Transfer Device Assembly | Pre-Solicitation | |
| USS ZUMWALT-Long Lead Time Material - Boat Handling Transfer Device Assembly | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Boat Davit Parts | Naval Supply Systems Command | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity