USS ZUMWALT-Long Lead Time Material-Boat Handling Transfer Device Assembly
Closed Pre-Solicitation Posted
A later notice was posted: the Limited / Sole Source Justification from .
- Solicitation number
- N5523623R0011
- Agency
-
Naval Sea Systems Command
Department of the Navy, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 332312 Fabricated Structural Metal Manufacturing
- PSC
- 2040 Marine Hardware And Hull Items
- Place of performance
- San Diego, California 92136, United States
Notice details come from SAM.gov. Updated .
Notice text
Southwest Regional Maintenance Center (SWRMC) Code 410B Procurement intends to award a Sole Source contract to Jered LLC to provide the direct replacement part of the transfer device assembly in support of the USS ZUMWALT (DDG-1000) in support of the FY-23 Drydocking Selected Restricted Availability. The requirement will be processed in accordance with FAR part 15. The North American Industry Classification System (NAICS) code is 332312 and the business size standard is 500 employees.
Jered LLC is the Original Equipment Manufacturer (OEM) of the transfer device assembly. The required part must be replaced with the same material previously used and must have the same function capability as the part is attached to the component. In addition, the replacement part must be compatible in all aspects to form, fit, and function with existing equipment. Jered LLC has no authorized distributors and is the only known source available to acquire the required part.
This notice is neither a request nor a solicitation of offers; however, all information received within 15 days after the date of publication of this synopsis will be reviewed by the Government for future considerations. Information received will be considered solely for the purpose of determining whether conducting a competitive procurement in the future is in the best interest of the Government. Responses must provide clean and concise documentation indicating vendor’s bona fide capability to provide this product or equivalency. Responses must include company name, address, telephone number of the requester, e-mail address, CAGE code and business size.
All information should be delivered via e-mail to gabrielle.m.baker5.civ@us.navy.mil and roderick.q.rioveros.civ@us.navy.mil. Information delivered by other than e-mail will not be accepted. Certifications in the System for Acquisition Management must be current and active to be eligible for contract award.
Notice history
| Notice | Type | Posted |
|---|---|---|
| USS ZUMWALT-Long Lead Time Material-Boat Handling Transfer Device Assembly- Redacted J&A | Limited / Sole Source Justification | |
| This notice | Pre-Solicitation | |
| USS ZUMWALT-Long Lead Time Material - Boat Handling Transfer Device Assembly | Pre-Solicitation |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity