USS SOMERSET DIRECT REPLACEMENT PARTS FOR MPDE (Long Lead Time Material)
Awarded Limited / Sole Source Justification Posted
- Solicitation number
- N5523625C0002
- Agency
-
Naval Sea Systems Command
Department of the Navy, Department of Defense
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- N5523625C0002 Federal contract award
- Awardee
- Fairbanks Morse, LLC
- NAICS code
- 333618 Other Engine Equipment Manufacturing
- PSC
- 2815 Diesel Engines And Components
- Place of performance
- National City, California 91950, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Navy Naval Sea Systems Command issued a Limited / Sole Source Justification Notice for direct replacement parts for the USS SOMERSET's Main Propulsion Diesel Engine (MPDE) through contract N5523625C0002. Fairbanks Morse Defense was identified as the sole source vendor for specific OEM parts, including adjustable linkages and main bearings, with a total estimated value of $475,944.60 using FY-25 OPN funds. The justification cites unusual and compelling urgency due to a critical 32-week lead time required to meet the Production Completion Date milestone of August 19, 2026, and to support the ship's FY-25 Depot Scheduled Maintenance Period. A Sources Sought notice posted on SAM.gov on December 11, 2023 received no alternative responses, further confirming Fairbanks Morse Defense as the only capable supplier. The parts must be delivered by September 18, 2025, to ensure timely completion of the USS SOMERSET's MPDE 2B overhaul and fuel rack crossover shaft maintenance.
Notice text
Awarded contract N5523625C0002 to unknown vendor for unknown amount on 2025-02-20.
Files
| File | Type | Posted |
|---|---|---|
| SOMERSET FY25 SRA_JA_Redacted.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Limited / Sole Source Justification | |
| USS SOMERSET DIRECT REPLACEMENT PARTS FOR MPDE (Long Lead Time Material) | Award Notice | |
| USS somerset (LPD-25) mpde lltm | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| 4420 - Sole Source - Fairbanks Morse, LLC | Naval Supply Systems Command | No set-aside | |
| USS EMERY S LAND Steam Valves | Military Sealift Command | No set-aside | |
| Prairie air, stbd, in repair/modification of | Naval Supply Systems Command | No set-aside | |
| 16 - FMS Repair SHAFT ASSEMBLY, DRIV | Naval Supply Systems Command | No set-aside | |
| USS john P murtha (LPD-26) engine replacement parts | Naval Sea Systems Command | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity