USMC Expeditionary Fuel Distribution System (components)

Closed Pre-Solicitation Posted

A later notice was posted: the Limited / Sole Source Justification from .

Solicitation number
N61331-26-R-TG01
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
Janesville, Iowa 50647, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Naval Sea Systems Command (NAVSEA), Naval Surface Warfare Center, Panama City Division (NSWC PCD) intends to procure pumps and filters for the USMC Expeditionary Fuel Distribution System through a sole source acquisition. The procurement specifically targets the RA2103 Pump (NSN 2930-01-714-8655) and RA2101 Filter (NSN 2910-01-714-8656) components that have been specially designed and modified to operate fielded Expeditionary Fuel Distribution Systems. The agency plans to award a Firm Fixed Price Requirements Indefinite Delivery - Indefinite Quantity (IDIQ) contract to support the Marine Corps Systems Command (MCSC) Fuel & Water team's critical operational needs. The sole source justification is based on 10 U.S.C. 3204(a)(1) and FAR 6.302-1(a)(2)(ii), indicating only one responsible source can satisfy agency requirements. The pre-solicitation notice was posted on September 5, 2025, with a response deadline of September 19, 2025, and the contract will be funded through fiscal years 2026-2031 Other Procurement, Navy funds.

This procurement carries no set-aside designation and will be awarded solely to Ohler Pumps, A Division of WS Darley, located in Janesville, Iowa (CAGE Code 00299). The company previously provided the original designs for these components under contract M67854-22-D-5000 for the Tactical Aviation Ground Refueling System (TAGRS), with subsequent modifications approved by MCSC for EFDS usage. The contract structure allows for up to 888 units of each pump and filter system, providing substantial procurement flexibility for the Marine Corps' expeditionary fuel distribution requirements. The estimated contract duration spans five years, including a base ordering period plus four additional option ordering periods. Individual delivery orders will specify particular delivery requirements, allowing the government to manage procurement timing based on operational needs. The IDIQ structure enables the Navy to scale procurement volumes while maintaining cost predictability through the firm fixed price mechanism.

Notice text

The Naval Sea Systems Command (NAVSEA), Naval Surface Warfare Center, Panama City Division (NSWC PCD) intends to award of a Firm Fixed Price (FFP) Requirements Indefinite Delivery – Indefinite Quantity (IDIQ) contract, on a sole source basis, to Ohler Pumps, A Division of WS Darley, 501 Maple Street, Janesville, IA 50647 (CAGE Code 00299), for the acquisition of pumps and filters RA2103 Pump and RA2101 Filter., up to 888 each per system. These pumps and filters have been identified by the Fuel & Water (F&W) team at MARCORSYSCOM (MCSC) and are deemed critical to obtain, as they are specially designed and modified to operate fielded Expeditionary Fuel Distribution Systems (EFDS). The estimated duration of the contract is estimated at five years, including a base ordering period with four additional option ordering periods. The Government’s minimum needs have been verified by the certifying technical and requirements personnel. The procurement will be funded with fiscal years 2026 – 2031 Other Procurement, Navy (OPN) funds. This J&A does not authorize acquisition for other requirements. Delivery requirements will be specified in the individual delivery orders. 10 U.S.C. 3204(a)(1) FAR 6.302-1(a)(2)(ii) – Only one responsible source and no other supplies or services will satisfy agency requirements.  The EFDS is a program of record within MCSC F&W Team enabling expeditionary bulk fueling utilizing fuel pumps and separators produced by Ohler Pumps. The original designed for the fuel pump (NSN 2930-01-714-8655) and the fuel filter separator (NSN 2910-01-714-8656) were awarded to Ohler Pumps under contract M67854-22-D-5000 for the Tactical Aviation Ground Refueling System (TAGRS). The pumps and separators were slightly modified from the original TAGRS configuration to meet the EFDS requirements, this redesign has since been vetted through Marine Corps Systems Command (MCSC) and has approved for EFDS usage. NWSC PCD Code E33 is now the assigned in-service engineering agent for the MCSC F&W team suite of system components.

Ohler Pumps is the original equipment manufacturer, and the only source for the required pumps and filters, as they developed the EFDS pumps and filters. The required Ohler Pump EFDS RA2103 pump and RA2101 filter have been specifically designed to support the EFDS fuel system and have completed extensive testing to verify compatibility with the EFDS system. Use of alternate pumps and filters would change pump sizing, design or type and would require significant system re-design and incur considerable systems engineering costs. Use of alternate equipment would also extend the fielding of the EFDS fuel system to conduct qualification testing because the EFDS project faces considerable schedule risk if these pumps/filters are not utilized as they have undergone extensive design and testing for the TAGRS, which is a separate program of record at MCSC.  Utilizing these pumps and filters allows EFDS to leverage the development of these systems already completed. The schedule risk of selecting an alternate source/pump is expected to result in at least two years of additional development and design verification time before an alternate system can be integrated into the project baseline.

Additionally, if an alternate pump or filter is acquired, the Government will incur significant additional costs due to the additional non-recurring engineering (NRE) and design development costs. The estimated cost of this NRE is estimated to be greater than $3,000,000 for design development and verification. The cost risk is further complicated by the unknown future unit cost and total ownership cost associated with an alternate vendor that is difficult to quantify. Expectations are that an alternate source of supply would be more expensive given the fact that the current OEM has an active production line already tooled to support the EFDS project given the similarity to the TAGRS project. The EFDS project is actively utilizing TAGRS logistics/Technical documentation to shorten timelines and mitigate costs related to the development of the Technical Manual (TM), Training Package and related documentation. The approximate cost for logistics development time, manuals, repair training and maintenance instructions is $375,000. Most of these logistics’ elements are already in place with the TAGRS program and can be leveraged to mitigate cost/schedule impacts in the EFDS.

Notice history

Notice Type Posted
USMC Expeditionary Fuel Distribution System (components) Latest Limited / Sole Source Justification
This notice Latest pre-solicitation Pre-Solicitation
Award notice for Solicitation for Woods Hole Oceanographic Institute (WHOI) Award Award Notice
USMC Expeditionary Fuel Distribution System (components) Original Pre-Solicitation

Similar open opportunities

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity