USMC 2nd MAW CMS MV-22 Bridge
Closed Special Notice Posted
- Solicitation number
- 47QFSA26K0026
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 488190 Other Support Activities for Air Transportation
- Place of performance
- Cherry Point, North Carolina 28533, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
GSA Assisted Acquisition Services is issuing a notice of intent to award a sole source contract to Tyonek Services Overhaul Facility-Stennis, LLC for MV-22 Contractor Maintenance Support at Marine Corps Air Station New River, North Carolina, with a response deadline of August 17, 2026. The award is justified under statutory authority 10 U.S.C. 3204(a)(2) and FAR 6.302-2 (Unusual and Compelling Urgency) on a noncompetitive basis. The contract is a six-month firm fixed-price bridge engagement commencing September 20, 2026 through March 19, 2027, consisting of a two-month base period and four one-month option periods. USMC 2nd Marine Aircraft Wing and Marine Aircraft Group 26 require continuation of maintenance support for six Tactical Aircraft Squadrons, performing organizational and intermediate level maintenance including local squadron procedures, maintenance documentation systems, Naval Aviation Maintenance Program requirements, safety and base access requirements, and MV-22-specific processes. The current contract (47QFRA23C23C0003) expires September 19, 2026. Award to any contractor other than the incumbent would create service discontinuity and unacceptable risk of critical mission failure. The bridge contract will provide time for the government to conduct a competitive follow-on procurement.
Notice text
THIS IS A NOTICE OF INTENT TO AWARD SOLE SOURCE AND IS NOT A REQUEST FOR COMPETITIVE PROPOSALS.
This is a notice of intent to award a sole source contract under statutory authority 10 U.S.C. 3204(a)(2) set forth in Federal Acquisition Regulation (FAR) 6.302-2, Unusual and Compelling Urgency.
General Services Administration (GSA) Assisted Acquisition Services (AAS) (Air Force/Navy/Space Force) and the United States Marine Corps (USMC) 2nd Marine Aircraft Wing (2D MAW), Marine Aircraft Group 26 (MAG-26), have identified a need to award a 6-month Firm Fixed-Price Bridge Contract on a noncompetitive basis to Tyonek Services Overhaul Facility-Stennis, LLC (CAGE 7KWV2) for continued performance of MV-22 Contractor Maintenance Support (CMS) at Marine Corps Air Station New River, NC. Services performed under this sole source contract will include the continuation of non-personal services to support the six (6) Tactical Aircraft (TACAIR) Squadrons of MAG-26 based at Marine Corps Air Station (MCAS) New River, North Carolina. These maintenance services will be provided at both Organizational Level (O-Level) and Intermediate Level (I-Level) and include local squadron procedures, applicable maintenance documentation systems, Naval Aviation Maintenance Program requirements, safety requirements, base access requirements, and MV-22-specific maintenance processes.
The current MV-22 CMS Contract (47QFRA23C0003) expires 19 SEP 26. The sole source bridge contract will include a limited performance period of six (6) months, consisting of a two (2) month base period and four one (1) month option periods, commencing 20 SEP 26 – 19 MAR 27.
The issuance of this limited sole source bridge contract will ensure ample time for the Government team to award the competitive follow-on contract. Award to anyone other than the incumbent contractor (Tyonek Services Overhaul Facility-Stennis, LLC) would result in a significant break in service and create an unacceptable risk of critical mission failure during the finalization and award of the competitive follow-on MV-22 CMS Contract.
This is not a request for information or competitive proposals. However, firms may submit a response to this notification if warranted.
Responses must be received by Kevin Hoyt at roger.hoyt@gsa.gov with a courtesy copy to Tim Barnes at timothy.barnes@gsa.gov no later than 17 AUG 26 at 1400 hours Eastern Standard Time (EST) and include the following:
- contractor’s technical knowledge of and experience with MV-22 CMS,
- information to demonstrate the contractor’s ability to complete all Phase-In activities and successfully commence full performance by the end of the current USMC MV-22 CMS contract on19 SEP 26, and
- proof of registration in the System for Award Management (SAM).
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Long Term Overhaul Contract for V-22 Swashplate Actuator | Naval Supply Systems Command | No set-aside | |
| V-22 Block B to Block C Mission Computer Obsolescence Initiative Procurement of Environmental Control System Components | Naval Air Systems Command | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity