USDA Forest Service NORTH CAROLINA CATAWBA FALLS TRAIL IMPROVEMENTS 2023-Phase IC
Closed Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- 12445123R0034
- Agency
-
Forest Service
Department of Agriculture
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Asheville, North Carolina 28801, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The USDA Forest Service is seeking proposals for trail improvement work along the Catawba Falls Trail in North Carolina's Pisgah National Forest. The firm-fixed price contract will be awarded based on best value and involves constructing boardwalks, stairs, viewing platforms, and modifying a retaining wall to enhance user safety and reduce erosion. The contractor must have experience building infrastructure in remote locations involving water crossings and mountainous terrain. Proposals are due by July 18, 2023. The solicitation containing plans and specifications will be issued on June 16, 2023 via SAM.gov.
The total small business set-aside contract has an anticipated value between $250,000 and $500,000. The NAICS code is 237310 for highway, street, and bridge construction and the PSC code is Z2PA for repair or alteration of non-building recreation facilities. Work includes resurfacing over 5,300 linear feet of existing trail, constructing segments of boardwalk and stairs, modifying a retaining wall design, and conducting multiple slide repairs and turnaround creations along the multi-phase trail system.
Notice text
Project Title: CATAWBA FALLS TRAIL IMPROVEMENTS 2023-Phase IC
Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
NAICS Code: 237310 Highway, Street, and Bridge Construction
PSC: Z2PA Repair Or Alteration Of Recreation Facilities (non-building)
Type of Contract: This is a Request for Proposal (RFP) which will result in award of a firm-fixed price contract. Award will be made to the best value to the government.
Magnitude: In accordance with FAR 36.204, the magnitude of this project is: (d) Between $250,000 and $500,000.
Location: The project area is located near the Catawba River in the Grandfather Ranger District of the Pisgah National Forest, in McDowell County, North Carolina, between the towns of Old Fort and Black Mountain.
Scope of Work: There is a need to improve the trail to enhance user safety and reduce impacts to the Catawba River. Some parts of the Catawba Falls Trail are excessively steep and pose a hazard to trail users. Rerouting the trail at designated areas will improve user safety and reduce erosion. Constructing viewing platforms at the upper and lower falls will also improve user safety. It is anticipated this work will be broken into distinct phases (subject to change in the final solicitation package):
Phase 1C: This trail segment begins at the upper level of the stair tower which is currently under construction. From the stair tower, a series of boardwalks and stairs shall be constructed that traverse steep slopes and winds around rock outcrops upslope from the stair tower. Work in this segment includes clearing within the trail corridor, hazard tree removal outside the corridor, and construction of elevated stairs and boardwalks per attached plans and specifications.
Trail Resurfacing: This task includes providing materials, equipment time, and labor to resurface the existing trail with ABC gravel. The total length of trail to be resurfaced is 5,300 linear feet
Phase 0, Turnaround: A concrete retaining wall at this location is detailed on pages 32 and 33 of the plan set, but for this contract, construction of this retaining wall is modified from that design to utilize dry stacked rock instead of a concrete retaining wall
This project has multiple slide area repairs, utv turn around creations, retaining wall construction, boardwalk construction, and elevated viewing platform construction, etc. THIS WORK LOCATION WILL REQUIRE THE CONTRACTOR TO HAVE SPECIAL SKILLS AT BUILDING IN REMOTE LOCATIONS (ACROSS STREAMS/RIVERS/SIDES OF MOUNTAINS, SLOPE REINFORCEMENT, BRIDGES, etc).
Plans and specification are not available for viewing or distribution as of this posting and questions will not be answered until the RFP has been formally issued.
Solicitation and Documents: The solicitation and related documents will be available for download at http://beta.sam.gov on or about 06-16-2023. No hard copies of the solicitation will be mailed out.
Files
| File | Type | Posted |
|---|---|---|
| 12445123R0034 CATAWBA FALLS PRESOLICITATION 05312023.docx | DOCX document |
Notice history
| Notice | Type | Posted |
|---|---|---|
| USDA Forest Service NORTH CAROLINA CATAWBA FALLS TRAIL IMPROVEMENTS 2023-Phase IC | Award Notice | |
| USDA Forest Service NORTH CAROLINA CATAWBA FALLS TRAIL IMPROVEMENTS 2023-Phase IC | Solicitation | |
| This notice | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| GRSM 321788 - Oconaluftee River Trail | — | No set-aside | |
| GAOA Brainard Lake Recreation Area Deferred Maintenance | Forest Service | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity