USACE SPK - Fort Hunter Liggett (FHL) Hacienda HVAC Geothermal Heat Pump Renovation
Closed Solicitation Posted
- Solicitation number
- W9123825RA023
- Agency
-
ENDIST Sacramento
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
- Place of performance
- 101 Infantry Road, Jolon CA 93928 93928
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers Sacramento District is seeking design-build construction services to replace the existing HVAC system with a geothermal heat pump solution at the historic Hacienda building at Fort Hunter Liggett, California. The project involves comprehensive renovation of a 19,588 square-foot, two-story building constructed around 1930 and listed on the National Register of Historic Places, currently functioning as a hotel. Key requirements include demolition and removal of existing mechanical systems, installation of a geothermal bore-field consisting of twenty-four 500-foot deep closed-loop vertical bores, underground geothermal headers, new heat pump units, and seismic design category D braces for mechanical equipment. The solicitation operates under NAICS code 238220 for Plumbing, Heating, and Air-Conditioning Contractors with PSC code Z2FB for Repair or Alteration of Recreational Buildings. Proposals are due by September 10, 2025, following Amendment 0002 which extended the original deadline.
This opportunity does not utilize any set-aside designations and is open to all eligible contractors meeting the Small Business Administration size standard of $19 million for the applicable NAICS code. The estimated construction magnitude ranges between $1 million to $5 million, providing contractors with a clear budget framework for proposal preparation. The work will be performed at 101 Infantry Road, Fort Hunter Liggett, California, requiring contractors to work within the constraints of a historically significant building while maintaining its visual appearance through underground pipe installation. The solicitation has undergone two amendments, with the most recent extending the proposal deadline and adding various attachments including revised appendices, site walk sign-in sheets, and updated wage determinations. Fire protection systems are explicitly excluded from the project scope, allowing contractors to focus specifically on the geothermal HVAC renovation requirements.
Notice text
4 versions
Update #4 · Latest ·
USACE SPK anticipates a potential requirement for design-build (DB) construction services to replace the existing heating, ventilation, and air conditioning (HVAC) system with a geothermal heat pump solution at the historic Hacienda building located at Fort Hunter Liggett (FHL) outside Jolon, California (CA). The 19,588 square-feet, 2-story building was built in approximately 1930, was placed in the National Register of Historic Places on 2 December 1977 and is currently used as a hotel. This project is anticipated to include:- Demolition and removal of existing mechanical, piping, plumbing, flue, electrical, architectural, structural, seismic, civil and controls equipment, as needed, to install the new geothermal heat pump system, water heaters and associated storage tanks.- Installation of a geothermal bore-field to consist of twenty-four (24) each 500-foot deep closed-loop vertical bores.- Underground geothermal headers feeding into the building. Pipes are anticipated to be emplaced underground to maintain the visual appearance of the historical structure.- Demolition of multiple domestic hot water heaters to be replaced by water connections for the new domestic hot water heat pump system and hot water storage tanks.- Installation of new geothermal heat pump console units.- Installation of new geothermal heat pump horizontal units.- Installation of new mechanical units to include seismic design category ?D? braces. This project is not anticipated to include fire protection. AMENDMENT 0001 - This amendment is being issued to add the following: NACIS: 238220 - PSC: Z2FB - SBA Size Standard: $19M - Magnitude of Construction is estimated to be between $1M to $5M. 2. Add Attachment 05 revised appendices 20250707. 3. Add Attachment 06 - Site Walk Sign In sheet 20250819. 4. Add updated WD CA20250018 - 20250822. All other items remain unchanged. Amendment 0002 is being issued for the following: 1. Proposal due date has been extended to 10 September 2025. 2. Spec section 01 10 10.07 DESIGN REQUIREMENTS - ARCHITECTURAL - Delete paragraph 1.5.3 Fire Extinguishing System in its entirety. 3. Spec Section 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS - a. Add to paragraph 1.5 Submittals: Well Drilling permit; G; b. Add a new subparagraph 1.12.6 Well Drilling permit: The contractor will be responsible for obtaining a well-drilling permit from the Monterey County Water Resources Agency. 4. Add CLIN OPTION 1002 - Hot Water Work. All other items remain unchanged. AMENDMENT 0003 - PROPOSALS ARE DUE 10 SEP 2025 @ 0900 HRS/09:00AM PST. ALL OTHER ITEMS REMAIN UNCHANGED.
Update #3 ·
USACE SPK anticipates a potential requirement for design-build (DB) construction services to replace the existing heating, ventilation, and air conditioning (HVAC) system with a geothermal heat pump solution at the historic Hacienda building located at Fort Hunter Liggett (FHL) outside Jolon, California (CA). The 19,588 square-feet, 2-story building was built in approximately 1930, was placed in the National Register of Historic Places on 2 December 1977 and is currently used as a hotel. This project is anticipated to include:- Demolition and removal of existing mechanical, piping, plumbing, flue, electrical, architectural, structural, seismic, civil and controls equipment, as needed, to install the new geothermal heat pump system, water heaters and associated storage tanks.- Installation of a geothermal bore-field to consist of twenty-four (24) each 500-foot deep closed-loop vertical bores.- Underground geothermal headers feeding into the building. Pipes are anticipated to be emplaced underground to maintain the visual appearance of the historical structure.- Demolition of multiple domestic hot water heaters to be replaced by water connections for the new domestic hot water heat pump system and hot water storage tanks.- Installation of new geothermal heat pump console units.- Installation of new geothermal heat pump horizontal units.- Installation of new mechanical units to include seismic design category ?D? braces. This project is not anticipated to include fire protection. AMENDMENT 0001 - This amendment is being issued to add the following: NACIS: 238220 - PSC: Z2FB - SBA Size Standard: $19M - Magnitude of Construction is estimated to be between $1M to $5M. 2. Add Attachment 05 revised appendices 20250707. 3. Add Attachment 06 - Site Walk Sign In sheet 20250819. 4. Add updated WD CA20250018 - 20250822. All other items remain unchanged. Amendment 0002 is being issued for the following: 1. Proposal due date has been extended to 10 September 2025. 2. Spec section 01 10 10.07 DESIGN REQUIREMENTS - ARCHITECTURAL - Delete paragraph 1.5.3 Fire Extinguishing System in its entirety. 3. Spec Section 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS - a. Add to paragraph 1.5 Submittals: Well Drilling permit; G; b. Add a new subparagraph 1.12.6 Well Drilling permit: The contractor will be responsible for obtaining a well-drilling permit from the Monterey County Water Resources Agency. 4. Add CLIN OPTION 1002 - Hot Water Work. All other items remain unchanged.
Update #2 ·
USACE SPK anticipates a potential requirement for design-build (DB) construction services to replace the existing heating, ventilation, and air conditioning (HVAC) system with a geothermal heat pump solution at the historic Hacienda building located at Fort Hunter Liggett (FHL) outside Jolon, California (CA). The 19,588 square-feet, 2-story building was built in approximately 1930, was placed in the National Register of Historic Places on 2 December 1977 and is currently used as a hotel. This project is anticipated to include:- Demolition and removal of existing mechanical, piping, plumbing, flue, electrical, architectural, structural, seismic, civil and controls equipment, as needed, to install the new geothermal heat pump system, water heaters and associated storage tanks.- Installation of a geothermal bore-field to consist of twenty-four (24) each 500-foot deep closed-loop vertical bores.- Underground geothermal headers feeding into the building. Pipes are anticipated to be emplaced underground to maintain the visual appearance of the historical structure.- Demolition of multiple domestic hot water heaters to be replaced by water connections for the new domestic hot water heat pump system and hot water storage tanks.- Installation of new geothermal heat pump console units.- Installation of new geothermal heat pump horizontal units.- Installation of new mechanical units to include seismic design category ?D? braces. This project is not anticipated to include fire protection. AMENDMENT 0001 - This amendment is being issued to add the following: NACIS: 238220 - PSC: Z2FB - SBA Size Standard: $19M - Magnitude of Construction is estimated to be between $1M to $5M. 2. Add Attachment 05 revised appendices 20250707. 3. Add Attachment 06 - Site Walk Sign In sheet 20250819. 4. Add updated WD CA20250018 - 20250822. All other items remain unchanged.
Update #1 ·
USACE SPK anticipates a potential requirement for design-build (DB) construction services to replace the existing heating, ventilation, and air conditioning (HVAC) system with a geothermal heat pump solution at the historic Hacienda building located at Fort Hunter Liggett (FHL) outside Jolon, California (CA). The 19,588 square-feet, 2-story building was built in approximately 1930, was placed in the National Register of Historic Places on 2 December 1977 and is currently used as a hotel. This project is anticipated to include:- Demolition and removal of existing mechanical, piping, plumbing, flue, electrical, architectural, structural, seismic, civil and controls equipment, as needed, to install the new geothermal heat pump system, water heaters and associated storage tanks.- Installation of a geothermal bore-field to consist of twenty-four (24) each 500-foot deep closed-loop vertical bores.- Underground geothermal headers feeding into the building. Pipes are anticipated to be emplaced underground to maintain the visual appearance of the historical structure.- Demolition of multiple domestic hot water heaters to be replaced by water connections for the new domestic hot water heat pump system and hot water storage tanks.- Installation of new geothermal heat pump console units.- Installation of new geothermal heat pump horizontal units.- Installation of new mechanical units to include seismic design category ?D? braces. This project is not anticipated to include fire protection.
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Solicitation | |
| USACE SPK DB Construction - Hacienda HVAC Geothermal Heat Pump - FHL, CA | Pre-Solicitation | |
| USACE SPK DB Construction - Hacienda HVAC Geothermal Heat Pump - FHL, CA | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| 12445127B0002 AZ Halfmoon Ranch House HVAC Installation | Forest Service | Total Small Business | |
| Renovate Building 1203-DOAS/AHU and Fire Suppression Water System, March Air Reserve Base, California | ENDIST Louisville | Total Small Business | |
| HVAC Replacement - MI | — | Total Small Business | |
| Building SH50 Replace Water Source Heat Pump | Naval Facilities Engineering Command | Total Small Business | |
| Z2FF-FCI El Reno-Replacement of Housing Unit HVAC Systems | BOP Field Acquisition Office | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity