USACE SPK Design Build (DB) Construction – F-35 Maintenance Facility, Phase 1-Project Labor Agreement

Closed Special Notice Posted

Solicitation number
W9123825RA012
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
Hill Air Force Base, Utah, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The U.S. Army Corps of Engineers (USACE) Sacramento District has published a Special Notice for market research regarding Project Labor Agreements (PLAs) for the F-35 Maintenance Facility Phase 1 construction project at Hill Air Force Base in Utah. This notice specifically addresses PLA evaluation only and does not include an actual solicitation for construction services. The project involves constructing a multi-dock medium bay fighter aircraft maintenance hangar with composite aircraft corrosion control capabilities, estimated to cost between $100-250 million. The facility will include parts storage, equipment areas, back shops, administrative areas, paint and de-paint bays, along with all supporting infrastructure and utilities. The construction will comply with Department of Defense building requirements and antiterrorism/force protection standards.

The primary purpose of this Special Notice is to conduct market research on the potential use of Project Labor Agreements as required by Executive Order 14063, which mandates PLAs for federal construction projects exceeding $35 million unless an exception applies. Contractors and industry professionals are invited to complete an attached questionnaire providing feedback on their PLA experiences, including benefits, challenges, and perspectives on how PLAs impact federal procurement efficiency. Responses must be submitted via email to Contract Specialist Natalia Gomez by 2:00 p.m. Mountain Standard Time on August 21, 2025, with the project number W9123825RA012 included in the subject line. No specific eligibility criteria are outlined for participation in this market research phase, as this is solely an information-gathering exercise to help USACE determine whether a PLA exception might apply to the future construction solicitation.

Notice text

Project Description: F-35 Maintenance Facility, Phase 1

Solicitation Number: W9123825RA012

Project Location: Hill Air Force Base, Davis County, UT.


This Notice is for the evaluation of Project Labor Agreements (PLAs) ONLY.  NO SOLICITATION IS AVAILABLE; requests for a solicitation will go unanswered. No award will be made from this Notice.

The United States Corps of Engineers (USACE) Sacramento District (SPK) is conducting market research by requesting feedback from the construction community addressing the potential use of PLAs and to obtain data on the recent history of construction projects in the local labor market of the project under consideration.

The United States Army Corps of Engineers (USACE) Sacramento District (SPK) anticipates a potential requirement and acquisition strategy to establish a Firm Fixed Price (FFP) contract to provide design build construction services to include but is not limited to:

Construct a multi-dock medium bay fighter aircraft maintenance hangar with parts storage/equipment areas, back shop, and administrative areas. Project scope includes composite aircraft corrosion control capability to include one paint bay and one de-paint bay. The proposed facility will have reinforced concrete footings, foundation, floor slab, structural steel frame, insulated walls, insulated roof, lightning protection, fire detection/suppression, and intrusion detection. The project will include pavements, site improvements, communication support, utilities and all required supporting facilities for a complete and usable facility to fulfill mission requirements. Facilities will be designed as permanent construction in accordance with the Department of Defense Unified Facilities Criteria 1-200-01, General Building requirements. This project will comply with Department of Defense antiterrorism/force protection requirements per Unified Facilities Criteria 4-010-01.

In accordance with Defense Federal Acquisition Regulation Supplement (DFARS) 236.204(iii), the Government currently estimates the magnitude of construction for this project to be between $100,000,000 and $250,000,000. 

PROJECT LABOR AGREEMENTS - Executive Order 14063, Use of Project Labor Agreements for Federal Construction Projects, issued 04 February 2022, requires the use of PLAs in connection with large-scale construction projects (defined as projects where the total cost to the Federal Government of the project is at least $35 million) to promote economy and efficiency in Federal procurement, unless an exception applies, as provided by FAR 22.504(d). As part of that consideration, this market research effort will help in our determination of whether a PLA exception applies. Please fill out the attached questionnaire.

Please provide responses by email to the Contract Specialist, Natalia Gomez, at natalia.gomez@usace.army.mil by 1400 / 2:00 p.m. (MST) Thursday, 21 August 2025.

Please include the Sources Sought Number, W9123825RA012 in the subject line.

Files

File Type Posted
Project Labor Agreement Questionnaire.pdf PDF

Notice history

Notice Type Posted
This notice Latest special notice Special Notice
F-35 Maintenance Facility, Phase 1 Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
F-35 Composite Repair and Training Facility / F-35 Maintenance Facility, Hill Air Force Base, Utah Hill Air Force Base, Utah, United States · NAICS 236210 ENDIST Sacramento No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors