USACE SPK DB DBB Construction $99M Small Business MATOC California and Utah

Closed Solicitation Posted

Solicitation number
W9123826RA003
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
1325 J Stsacramento Ca 95814 95814

Notice details come from SAM.gov. Updated .

About this opportunity

The United States Army Corps of Engineers Sacramento District is soliciting construction services through a design-build and design-bid-build indefinite delivery/indefinite quantity multiple award task order contract (MATOC) with an anticipated value of $99 million. The procurement encompasses new construction, renovations, maintenance, and repairs at military installations across California and Utah, including Military Ocean Terminal Concord, Presidio of Monterey, Fort Hunter Liggett, Camp Parks, Camp Roberts, and DDJC Tracy. Eligible work includes access control points, water towers, pavement repair, administrative building renovation, roofing, HVAC systems, and utility infrastructure such as water lines, sewer lines, roads, electrical, and communication utilities. The solicitation has been amended five times to update requirements documentation, extend the response deadline, and include bidder inquiries and government responses. The final proposal submission deadline is December 4, 2025, with the contract notice having been posted on October 21, 2025.

This opportunity is designated as a Total Small Business set-aside, restricting competition to small business concerns. The contract is valued at $99 million and will be awarded to multiple firms capable of performing both design-build and design-bid-build services on an as-needed basis through individual task orders. Specific project requirements will be determined and communicated through each task order issued under the MATOC. The primary place of performance is Sacramento, California (1325 J Street), though work will be distributed across various military installations in California and Utah as defined by individual task order requirements. The contract falls under NAICS code 236220 for Commercial and Institutional Building Construction and PSC code Y1JZ for Construction of Miscellaneous Buildings.

Notice text

8 versions

Update #8 · Latest ·

The United States Army Corps of Engineers (USACE), Sacramento District (SPK), requires a design-build (DB) and design-bid-build (DBB) ? Indefinite Delivery Indefinite Quantity (IDIQ), Multiple Award Task Order Contract (MATOC) for Construction Services in support of SPK programs located primarily in the following army installations: Military Ocean Terminal Concord (MOTCO)/ Bay Area/ Central California, Presidio of Monterey/ Fort Hunter Liggett/ Camp Parks/ Camp Roberts/ DDJC Tracy. Secondary locations within the Sacramento boundaries of California and Utah. Specific needs will be determined based upon project requirements as described in each task order. Selected firms will work on a variety of projects that may include but not necessarily limited to new construction (including new work, additions, alterations, maintenance, and repairs) of commercial and institutional buildings and related structures. Anticipated work may include the following: New facilities to include but not limited to: Access Control Points, water tower, pavement repair and renovation of existing facilities to include but not limited to administrative buildings, training rooms, interior/exterior repairs, roofing, building mechanical systems (e.g. HVAC). Utility Infrastructure to include but not limited to water lines, sewer lines, roads, electrical, and communication utilities.-----AMENDMENT 0001 IS ISSUED TO:UPDATE SECTION 00 21 00, PARAGRAPH 2.7 TOTAL PAGE LIMIT AND 3 TOTAL PAGE LIMIT, IN ATTACHMENT 5.-----AMENDMENT 0002 IS ISSUED TO: UPDATE SECTION 00 21 00, IN ATTACHMENT 5.-----AMENDMENT 0003 IS ISSUED TO: Extend the solicitation due date to 04 December 2025.-----AMENDMENT 0004 IS ISSUED TO: UPDATE SECTION 00 21 00, IN ATTACHMENT 5.-----AMENDMENT 0005 IS ISSUED TO: INCLUDE PROJNET BIDDER INQUIRIES/GOVERNMENT RESPONSE IN ATTACHMENT 7.

Update #7 ·

The United States Army Corps of Engineers (USACE), Sacramento District (SPK), requires a design-build (DB) and design-bid-build (DBB) ? Indefinite Delivery Indefinite Quantity (IDIQ), Multiple Award Task Order Contract (MATOC) for Construction Services in support of SPK programs located primarily in the following army installations: Military Ocean Terminal Concord (MOTCO)/ Bay Area/ Central California, Presidio of Monterey/ Fort Hunter Liggett/ Camp Parks/ Camp Roberts/ DDJC Tracy. Secondary locations within the Sacramento boundaries of California and Utah. Specific needs will be determined based upon project requirements as described in each task order. Selected firms will work on a variety of projects that may include but not necessarily limited to new construction (including new work, additions, alterations, maintenance, and repairs) of commercial and institutional buildings and related structures. Anticipated work may include the following: New facilities to include but not limited to: Access Control Points, water tower, pavement repair and renovation of existing facilities to include but not limited to administrative buildings, training rooms, interior/exterior repairs, roofing, building mechanical systems (e.g. HVAC). Utility Infrastructure to include but not limited to water lines, sewer lines, roads, electrical, and communication utilities.-----AMENDMENT 0001 IS ISSUED TO:UPDATE SECTION 00 21 00, PARAGRAPH 2.7 TOTAL PAGE LIMIT AND 3 TOTAL PAGE LIMIT, IN ATTACHMENT 5.-----AMENDMENT 0002 IS ISSUED TO: UPDATE SECTION 00 21 00, IN ATTACHMENT 5.-----AMENDMENT 0003 IS ISSUED TO: Extend the solicitation due date to 04 December 2025.-----AMENDMENT 0004 IS ISSUED TO: UPDATE SECTION 00 21 00, IN ATTACHMENT 5.

Update #6 ·

The United States Army Corps of Engineers (USACE), Sacramento District (SPK), requires a design-build (DB) and design-bid-build (DBB) ? Indefinite Delivery Indefinite Quantity (IDIQ), Multiple Award Task Order Contract (MATOC) for Construction Services in support of SPK programs located primarily in the following army installations: Military Ocean Terminal Concord (MOTCO)/ Bay Area/ Central California, Presidio of Monterey/ Fort Hunter Liggett/ Camp Parks/ Camp Roberts/ DDJC Tracy. Secondary locations within the Sacramento boundaries of California and Utah. Specific needs will be determined based upon project requirements as described in each task order. Selected firms will work on a variety of projects that may include but not necessarily limited to new construction (including new work, additions, alterations, maintenance, and repairs) of commercial and institutional buildings and related structures. Anticipated work may include the following: New facilities to include but not limited to: Access Control Points, water tower, pavement repair and renovation of existing facilities to include but not limited to administrative buildings, training rooms, interior/exterior repairs, roofing, building mechanical systems (e.g. HVAC). Utility Infrastructure to include but not limited to water lines, sewer lines, roads, electrical, and communication utilities.-----AMENDMENT 0001 IS ISSUED TO:UPDATE SECTION 00 21 00, PARAGRAPH 2.7 TOTAL PAGE LIMIT AND 3 TOTAL PAGE LIMIT, IN ATTACHMENT 5.-----AMENDMENT 0002 IS ISSUED TO: UPDATE SECTION 00 21 00, IN ATTACHMENT 5.-----AMENDMENT 0003 IS ISSUED TO: Extend the solicitation due date to 04 December 2025.

Update #5 ·

The United States Army Corps of Engineers (USACE), Sacramento District (SPK), requires a design-build (DB) and design-bid-build (DBB) ? Indefinite Delivery Indefinite Quantity (IDIQ), Multiple Award Task Order Contract (MATOC) for Construction Services in support of SPK programs located primarily in the following army installations: Military Ocean Terminal Concord (MOTCO)/ Bay Area/ Central California, Presidio of Monterey/ Fort Hunter Liggett/ Camp Parks/ Camp Roberts/ DDJC Tracy. Secondary locations within the Sacramento boundaries of California and Utah. Specific needs will be determined based upon project requirements as described in each task order. Selected firms will work on a variety of projects that may include but not necessarily limited to new construction (including new work, additions, alterations, maintenance, and repairs) of commercial and institutional buildings and related structures. Anticipated work may include the following: New facilities to include but not limited to: Access Control Points, water tower, pavement repair and renovation of existing facilities to include but not limited to administrative buildings, training rooms, interior/exterior repairs, roofing, building mechanical systems (e.g. HVAC). Utility Infrastructure to include but not limited to water lines, sewer lines, roads, electrical, and communication utilities.-----AMENDMENT 0001 IS ISSUED TO:UPDATE SECTION 00 21 00, PARAGRAPH 2.7 TOTAL PAGE LIMIT AND 3 TOTAL PAGE LIMIT, IN ATTACHMENT 5.-----AMENDMENT 0002 IS ISSUED TO: UPDATE SECTION 00 21 00, IN ATTACHMENT 5.

Update #4 ·

The United States Army Corps of Engineers (USACE), Sacramento District (SPK), requires a design-build (DB) and design-bid-build (DBB) ? Indefinite Delivery Indefinite Quantity (IDIQ), Multiple Award Task Order Contract (MATOC) for Construction Services in support of SPK programs located primarily in the following army installations: Military Ocean Terminal Concord (MOTCO)/ Bay Area/ Central California, Presidio of Monterey/ Fort Hunter Liggett/ Camp Parks/ Camp Roberts/ DDJC Tracy. Secondary locations within the Sacramento boundaries of California and Utah. Specific needs will be determined based upon project requirements as described in each task order. Selected firms will work on a variety of projects that may include but not necessarily limited to new construction (including new work, additions, alterations, maintenance, and repairs) of commercial and institutional buildings and related structures. Anticipated work may include the following: New facilities to include but not limited to: Access Control Points, water tower, pavement repair and renovation of existing facilities to include but not limited to administrative buildings, training rooms, interior/exterior repairs, roofing, building mechanical systems (e.g. HVAC). Utility Infrastructure to include but not limited to water lines, sewer lines, roads, electrical, and communication utilities.-----AMENDMENT 0001 IS ISSUED TO:UPDATE SECTION 00 21 00, PARAGRAPH 2.7 TOTAL PAGE LIMIT AND 3 TOTAL PAGE LIMIT, IN ATTACHMENT 5.

Update #3 ·

The United States Army Corps of Engineers (USACE), Sacramento District (SPK), requires a design-build (DB) and design-bid-build (DBB) ? Indefinite Delivery Indefinite Quantity (IDIQ), Multiple Award Task Order Contract (MATOC) for Construction Services in support of SPK programs located primarily in the following army installations: Military Ocean Terminal Concord (MOTCO)/ Bay Area/ Central California, Presidio of Monterey/ Fort Hunter Liggett/ Camp Parks/ Camp Roberts/ DDJC Tracy. Secondary locations within the Sacramento boundaries of California and Utah. Specific needs will be determined based upon project requirements as described in each task order. Selected firms will work on a variety of projects that may include but not necessarily limited to new construction (including new work, additions, alterations, maintenance, and repairs) of commercial and institutional buildings and related structures. Anticipated work may include the following: New facilities to include but not limited to: Access Control Points, water tower, pavement repair and renovation of existing facilities to include but not limited to administrative buildings, training rooms, interior/exterior repairs, roofing, building mechanical systems (e.g. HVAC). Utility Infrastructure to include but not limited to water lines, sewer lines, roads, electrical, and communication utilities.

Pre-solicitation notice was published under W9123826RA001 and included the disclaimer that, If solicited, the solicitation number will be W9123826RA003. 

Update #2 ·

The United States Army Corps of Engineers (USACE), Sacramento District (SPK), requires a design-build (DB) and design-bid-build (DBB) ? Indefinite Delivery Indefinite Quantity (IDIQ), Multiple Award Task Order Contract (MATOC) for Construction Services in support of SPK programs located primarily in the following army installations: Military Ocean Terminal Concord (MOTCO)/ Bay Area/ Central California, Presidio of Monterey/ Fort Hunter Liggett/ Camp Parks/ Camp Roberts/ DDJC Tracy. Secondary locations within the Sacramento boundaries of California and Utah. Specific needs will be determined based upon project requirements as described in each task order. Selected firms will work on a variety of projects that may include but not necessarily limited to new construction (including new work, additions, alterations, maintenance, and repairs) of commercial and institutional buildings and related structures. Anticipated work may include the following: New facilities to include but not limited to: Access Control Points, water tower, pavement repair and renovation of existing facilities to include but not limited to administrative buildings, training rooms, interior/exterior repairs, roofing, building mechanical systems (e.g. HVAC). Utility Infrastructure to include but not limited to water lines, sewer lines, roads, electrical, and communication utilities.

Update #1 ·

The United States Army Corps of Engineers (USACE), Sacramento District (SPK), requires a design-build (DB) and design-bid-build (DBB) ? Indefinite Delivery Indefinite Quantity (IDIQ), Multiple Award Task Order Contract (MATOC) for Construction Services in support of SPK programs located primarily in the following army installations: Military Ocean Terminal Concord (MOTCO)/ Bay Area/ Central California, Presidio of Monterey/ Fort Hunter Liggett/ Camp Parks/ Camp Roberts/ DDJC Tracy. Secondary locations within the Sacramento boundaries of California and Utah. Specific needs will be determined based upon project requirements as described in each task order. Selected firms will work on a variety of projects that may include but not necessarily limited to new construction (including new work, additions, alterations, maintenance, and repairs) of commercial and institutional buildings and related structures. Anticipated work may include the following: New facilities to include but not limited to: Access Control Points, water tower, pavement repair and renovation of existing facilities to include but not limited to administrative buildings, training rooms, interior/exterior repairs, roofing, building mechanical systems (e.g. HVAC). Utility Infrastructure to include but not limited to water lines, sewer lines, roads, electrical, and communication utilities.

Similar open opportunities

Opportunity Agency Set-aside Responses due
$465M SPK small business MATOC for DBB/DB construction Usace Sacramento District 1325 J Street Sacramento, CA 95814 95814 · NAICS 236220 ENDIST Sacramento Total Small Business
Small Business D/B Military Construction MATOC NAICS 236220 ENDIST Louisville Total Small Business
Vertical Construction MATOC Multiple Locations in the Mobile District AOR, AL, FL, GA, and MS. 36602 · NAICS 238990 ENDIST Mobile Total Small Business
F-35 Composite Repair and Training Facility / F-35 Maintenance Facility, Hill Air Force Base, Utah Hill Air Force Base, Utah, United States · NAICS 236210 ENDIST Sacramento No set-aside
Mather Fueling System Repairs Mather, California 95655, United States · NAICS 237120 ENDIST Omaha Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors