About this opportunity

The US Department of State is seeking contractor services to perform comprehensive Test and Balance (TAB) work for the cooling system at the US Embassy in Brazzaville, Republic of the Congo. The procurement specifically targets the air handling units (AHUs) serving the chancery building, which have been operational for 16 years and are experiencing performance inefficiencies as identified in the 2024 Annual Facility Condition Survey. The primary objectives include optimizing HVAC performance, enhancing energy efficiency, ensuring indoor air quality, and maintaining optimal climate control for sensitive processes. The TAB process will encompass airflow measurement, damper adjustment, system analysis to identify inefficiencies, and hydronic system evaluation, with the contractor required to provide both an initial assessment report and a final TAB report documenting findings, adjustments, and recommendations. The solicitation was posted on August 27, 2025, with responses due by September 15, 2025.

This opportunity does not utilize any set-aside designations and is open to all qualified contractors. The Request for Quote identifies two potential contractors, Precision Test and Balance and KSI Resources, suggesting these may be incumbents or preferred vendors. While the current funding amount shows as $0.00 USD, supporting documentation indicates a budget allocation of $169,500.00 for this project. The system includes 6 air handling units, 4 fan coil units, 3 chillers, 80 balancing dampers, 6 balancing valves, and various pumps, with the entire cooling system comprising air-cooled chillers and a chilled water flow specification of 6 liters per second. Work is scheduled to be performed at the US Embassy chancery building in Brazzaville, Republic of the Congo, with project completion targeted for March 31, 2025, and delivery required by September 30, 2025.

Notice text

2 versions

Update #2 · Latest ·

The US Embassy in Brazzaville requires services of the contractor to perform a comprehensive Test and Balance (TAB) for the cooling system, specifically the air handling units (AHUs) serving the chancery building.

Below are additional specifications with regards to the system 

Number of Fan Coil Units: 4

Number of Balancing Dampers (Air) : 80

Number of Balancing Valves : 6 

Number of Chillers : 3

Number of Primary Pumps : 2

Number of Secondary Pumps : 2

Number of Air Handling Units : 6

Number of Fire Dampers : 5

Composition of Chilled water system

  • 3 Air-cooled chillers
  • One chiller of the three is equipped with heat exchanger and glycol
  • One supply line to the building
  • One return line from the building.
  • One bypass line with a with bypass valve.
  • Chilled water flow SP= 6 liters per second.

The total number of dampers in the air distribution network : 80

Provision of images, schematics, or requirement specification documents

Update #1 ·

The US Embassy in Brazzaville requires services of the contractor to perform a comprehensive Test and Balance (TAB) for the cooling system, specifically the air handling units (AHUs) serving the chancery building.

Files

File Type Posted
Statement of work.pdf PDF
Request.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity