UPS Upgrade Bldg 4
Closed Solicitation Posted
- Solicitation number
- SPS-USCG-250003
- Agency
- Coast Guard Department of Homeland Security
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 33591 Battery Manufacturing
- Place of performance
- Washington 98134, United States
- Points of contact
-
- Elizabeth Meister elizabeth.a.meister@uscg.mil (206) 217-6145
Notice details come from SAM.gov. Updated .
About this opportunity
The US Coast Guard is seeking a contractor to upgrade Uninterruptible Power Supply (UPS) systems in Building 4 at Base Seattle, located in Seattle, Washington. The project involves completely replacing the UPS system in Room #135 with a new lithium-ion battery system from approved manufacturers like Vertiv, Eaton, or Schneider Electric, and replacing specific components in Room #339's existing Vertiv Liebert NPower 100 kVA system. The new UPS must be sized for current load capacity plus 25% future expansion and provide 60 minutes of runtime. The contract will be awarded using Lowest Price Technically Acceptable (LPTA) evaluation criteria, meaning the lowest-priced technically compliant quote will be selected. Vendors must be registered in the System for Award Management (SAM) with an active status and have the appropriate NAICS code listed on their registration. Proposals are due by February 10, 2025, and must be submitted to Elizabeth Meister via email.
This solicitation is a 100% small business set-aside under NAICS code 33591 (Battery Manufacturing), targeting small businesses capable of performing complex UPS system upgrades. The work will be performed at the US Coast Guard Sector Puget Sound, specifically in Building 4 at 1519 Alaskan Way S, Seattle, WA 98134. The contractor will be responsible for removing existing equipment, installing new components, conducting comprehensive testing including burn-in tests, load transfer tests, and battery discharge tests. Work hours are limited to Monday through Friday, 7:00 am to 3:30 pm, excluding federal holidays. While no specific award value is mentioned, the project involves replacing a 100 kVA UPS system and multiple system components, suggesting a potentially substantial contract. The project requires extensive technical expertise, with contractors needing at least five years of experience working with Vertiv Liebert UPS systems and the ability to handle complex electrical infrastructure modifications.
Notice text
9 versions
Update #9 · Latest ·
Update 1 to questions answered:
- The GAO states the following when BAA applies:
“(1) the procurement must be intended for public use within the United States; and (2) the items to be procured or the materials from which they are manufactured must be present in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality. The provisions of the act may be waived if the head of the procuring agency determines the act to be inconsistent with the public interest or the cost of acquiring the domestic product is unreasonable.”
If these do not apply to our case, then we can go open market.
2. We will use the existing transformers unless they determine there is a need to have the supply power to the unit stepped down.
3. We will support any day of the week. Also, we would like to have a week, or 2 weeks’ notice prior to any requested shutdowns.
UPDATED!! DESCRIPTION OF SERVICES: The Contractor shall provide all personnel, management, supervision, materials, tools, supplies, equipment, transportation, labor, and other items and services necessary to replace a total of two (2) Uninterruptible Power Supply (UPS) systems in Building 4 room #135 and Building #4 room #339, at Base Seattle. The contractor must perform to the standards in this contract. All work shall comply with all applicable codes, along with Federal, State and local regulations. .
This notice is a combined synopsis/solicitation for a commercial products and commercial services in accordance with Federal Acquisition Regulation Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes a public solicitation. Please read this entire notice, the instructions herein, and the attachment documents carefully. This acquisition is on a Small Business Set-Aside only.
HOW TO RESPOND: To compete for this project, interested parties must be registered in SAM (System for Award Management) prior to close of this solicitation. https://www.sam.gov/portal/public/SAM/. The vendors SAM registration must be in an “ACTIVE” status prior to award. Vendors must ensure that the above listed NAICS codes are listed on their SAM registration to perform this type of service.
COST PROPOSALS: The contract will be awarded using simplified acquisition procedures in accordance with FAR part 13 and part 15 provide Firm Fixed-Price “broken out by labor hours, labor category, materials, and other direct costs”. Offerors must submit the proposal to Elizabeth Meister e-mail: elizabeth.a.meister@uscg.mil.
EVALUATION CRITERIA: The government will award a contract resulting from this request for quote (RFQ) to the responsible offeror whose offer conforming to the RFQ is the Lowest price Technically Acceptable (LPTA) quote. The lowest priced quote will be evaluated on technical acceptability, if it is found to be acceptable, an award will be made. If it is found to be unacceptable, the next lowest price will be evaluated. This process will continue until a technically acceptable offer is identified.
Description of Work Required:
Contractor shall replace two (2) UPS Systems. Contractor to remove and dispose of existing UPS system located in Building 4 room #135, and UPS system in Room #339, and supply and install new UPS systems with new lithium-ion batteries. Contractor to replace system with Brand Name or approved equal.
Existing UPS Manufacturer and Model for both systems- Vertiv Liebert NPower 100 kVA 480 Volt 3-phase. Incoming voltage to UPS is 480V. After UPS, voltage steps down to 208V. It is estimated that the capacity of the existing UPS system in each room is too large. Contractor is to present a UPS system design to the KO for approval prior to purchase and installation.
Suggested UPS Systems:
Manufacturer: Vertiv Liebert EXM 480V
Manufacturer: Eaton 93PM 480V
Manufacturer: Schneider Electric Galaxy VS 480V
Existing load on UPS System in room #135 is 21% and room #339 is approximately 26%. New UPS is to be sized to existing load capacity plus 25% increase for future expansion. New UPS must fit within dimensions of existing room. New UPS system is to supply power to connected equipment for a runtime of 60 minutes.
UPS Battery Type: Lithium Ion, Flame retardant case and cover meet UL 1778 standards.
UPS system complies with the most recent version of following standards: UL1778, UL924, UL1989 and UL94 V-2, BS 6290-4, IEC-60896-2 as well as standards referenced in Section 4, and all relevant Federal, State, and local standards and codes.
All materials and parts supplied by the contractor in this SOW shall be new, are fully compatible with the entire UPS system, and comply with the UPS manufacturer’s specifications and installation standards. All materials and parts shall be approved by the KO prior to installation.
Submit quotes to the following e-mail address by the offer due date and time:
Attn: Elizabeth Meister E-Mail Address: Elizabeth.a.meister@uscg.mil with solicitation RFQ number SPS-USCG-250003 in subject line.
Update #8 ·
UPDATED!! DESCRIPTION OF SERVICES: The Contractor shall provide all personnel, management, supervision, materials, tools, supplies, equipment, transportation, labor, and other items and services necessary to replace a total of two (2) Uninterruptible Power Supply (UPS) systems in Building 4 room #135 and Building #4 room #339, at Base Seattle. The contractor must perform to the standards in this contract. All work shall comply with all applicable codes, along with Federal, State and local regulations. .
This notice is a combined synopsis/solicitation for a commercial products and commercial services in accordance with Federal Acquisition Regulation Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes a public solicitation. Please read this entire notice, the instructions herein, and the attachment documents carefully. This acquisition is on a Small Business Set-Aside only.
HOW TO RESPOND: To compete for this project, interested parties must be registered in SAM (System for Award Management) prior to close of this solicitation. https://www.sam.gov/portal/public/SAM/. The vendors SAM registration must be in an “ACTIVE” status prior to award. Vendors must ensure that the above listed NAICS codes are listed on their SAM registration to perform this type of service.
COST PROPOSALS: The contract will be awarded using simplified acquisition procedures in accordance with FAR part 13 and part 15 provide Firm Fixed-Price “broken out by labor hours, labor category, materials, and other direct costs”. Offerors must submit the proposal to Elizabeth Meister e-mail: elizabeth.a.meister@uscg.mil.
EVALUATION CRITERIA: The government will award a contract resulting from this request for quote (RFQ) to the responsible offeror whose offer conforming to the RFQ is the Lowest price Technically Acceptable (LPTA) quote. The lowest priced quote will be evaluated on technical acceptability, if it is found to be acceptable, an award will be made. If it is found to be unacceptable, the next lowest price will be evaluated. This process will continue until a technically acceptable offer is identified.
Description of Work Required:
Contractor shall replace two (2) UPS Systems. Contractor to remove and dispose of existing UPS system located in Building 4 room #135, and UPS system in Room #339, and supply and install new UPS systems with new lithium-ion batteries. Contractor to replace system with Brand Name or approved equal.
Existing UPS Manufacturer and Model for both systems- Vertiv Liebert NPower 100 kVA 480 Volt 3-phase. Incoming voltage to UPS is 480V. After UPS, voltage steps down to 208V. It is estimated that the capacity of the existing UPS system in each room is too large. Contractor is to present a UPS system design to the KO for approval prior to purchase and installation.
Suggested UPS Systems:
Manufacturer: Vertiv Liebert EXM 480V
Manufacturer: Eaton 93PM 480V
Manufacturer: Schneider Electric Galaxy VS 480V
Existing load on UPS System in room #135 is 21% and room #339 is approximately 26%. New UPS is to be sized to existing load capacity plus 25% increase for future expansion. New UPS must fit within dimensions of existing room. New UPS system is to supply power to connected equipment for a runtime of 60 minutes.
UPS Battery Type: Lithium Ion, Flame retardant case and cover meet UL 1778 standards.
UPS system complies with the most recent version of following standards: UL1778, UL924, UL1989 and UL94 V-2, BS 6290-4, IEC-60896-2 as well as standards referenced in Section 4, and all relevant Federal, State, and local standards and codes.
All materials and parts supplied by the contractor in this SOW shall be new, are fully compatible with the entire UPS system, and comply with the UPS manufacturer’s specifications and installation standards. All materials and parts shall be approved by the KO prior to installation.
Submit quotes to the following e-mail address by the offer due date and time:
Attn: Elizabeth Meister E-Mail Address: Elizabeth.a.meister@uscg.mil with solicitation RFQ number SPS-USCG-250003 in subject line.
Update #7 ·
Responses to questions: (answers are bold and italicized)
-
Room #135 UPS Replacement: What is the current load on the existing NPower UPS? 22 kVa
-
The Liebert NPower UPS system is estimated to be “End of Life” on January 1, 2027. This will mean that replacement parts are no longer guaranteed. If your NPower UPS system goes down after this date, there may not be parts available to fix it and bring it back online. While we can quote the capacitors, fans, batteries, and IGBT boards, this is not the solution we’d recommend. We would instead recommend replacing the unit entirely with a new, appropriately sized UPS system. We’d rather you purchase a new unit that will last you another 15 years than quote replacement parts that have the potential of only a 2-year lifespan. Based on the current load in room #339, pricing may not be so different between all of these parts replacements and a new UPS. What is the load on the UPS in room #339? Is there a reason we are looking at full parts replacement instead of purchasing a new UPS system? The boards they are referring to are for the unit we are replacing on the 1st floor. Vertiv is aware of the 1st floor unit having a burnt board. This is probably what the vendor is referring to. The unit on the 3rd floor will get the new parts. We currently have no problems with that unit except for that it is due for maintenance interval of replacing batteries, fans, and capacitors.
-
Is there any raised flooring in any of the rooms? If so, what is the height of the floor? The raised flooring is about 2”
-
Will the transformer downstream of the UPS remain or do we need to Replace? Transformer will not need to be replaced
-
SOW references 60 min at actual load, can we get the current actual load? This will determine the total amount of batteries. 1st floor load was at 22 kVa and 3rd floor was at 26 kVa
-
Is a wall mount MBP or a sidecar MBP preferred? Please elaborate.
UPDATE 4: Close of contract opportunity was extended. All Offers due by 15JAN2024 @1300.
UPDATE 3: See attached photographs for reference of the space and units. The serial numbers for the current units are 37-6102 in Room 339 and 37-6101 in Room #135.
UPDATE 2: Anyone intending on attending the site visit needs to email Elizabeth.a.meister@uscg.mil with the following information for Base Access: Your company, Full Name, DOB, DL # and State, sent NLT 1600 on 07JAN2025.
All questions, emails and inquiries are being reviewed and the responses will be posted to the soliciation.
UPDATE 1: We will be hosting a Site Visit on Jan 8th at 1000 at 1519 Alaskan Way S. Seattle, WA 98134, BLDG 4. All visitors will need to comply with the Base Restrictions outline in the SOW. State ID needs to be current. Reach out to KO: Elizabeth Meister via email elizabeth.a.meister@uscg.mil to confirm your intent to attend Site Visit prior to arrival. The Solicitation closing date has been moved to Jan 10th at 1300 PST to accomodate this update. For those unable to make the Site Visit, pictures of the array will be posted to this Soliciation on Monday for your review.
DESCRIPTION OF SERVICES: The Contractor shall provide all personnel, management, supervision, materials, tools, supplies, equipment, transportation, labor, and other items and services necessary to replace the Uninterruptible Power Supply (UPS) system in Building 4 room #135, and replace the batteries, fans, capacitors, and IGBT drivers for the UPS system located in Building #4 room #339, at Base Seattle. The contractor must perform to the standards in this contract. All work shall comply with all applicable codes, along with Federal, State and local regulations.
This notice is a combined synopsis/solicitation for a commercial products and commercial services in accordance with Federal Acquisition Regulation Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes a public solicitation. Please read this entire notice, the instructions herein, and the attachment documents carefully. This acquisition is on a Small Business Set-Aside only.
HOW TO RESPOND: To compete for this project, interested parties must be registered in SAM (System for Award Management) prior to close of this solicitation. https://www.sam.gov/portal/public/SAM/. The vendors SAM registration must be in an “ACTIVE” status prior to award. Vendors must ensure that the above listed NAICS codes are listed on their SAM registration to perform this type of service.
COST PROPOSALS: The contract will be awarded using simplified acquisition procedures in accordance with FAR part 13 and part 15 provide Firm Fixed-Price “broken out by labor hours, labor category, materials, and other direct costs”. Offerors must submit the proposal to Elizabeth Meister e-mail: elizabeth.a.meister@uscg.mil.
EVALUATION CRITERIA: The government will award a contract resulting from this request for quote (RFQ) to the responsible offeror whose offer conforming to the RFQ is the Lowest price Technically Acceptable (LPTA) quote. The lowest priced quote will be evaluated on technical acceptability, if it is found to be acceptable, an award will be made. If it is found to be unacceptable, the next lowest price will be evaluated. This process will continue until a technically acceptable offer is identified.
Description of Work Required:
Room #135
- Contractor shall remove and dispose of existing UPS system located in Building 4 room #135, and supply and install a new UPS system with new lithium-ion batteries. Contractor to replace system with Brand Name or approved equal.
- Existing UPS Manufacturer and Model- Vertiv Liebert NPower 100 kVA 480 Volt 3-phase. Incoming voltage to UPS is 480V. After UPS, voltage steps down to 208V.
- It is estimated that the capacity of the existing UPS system in room #135 is too large. Contractor is to determine load and capacity on current UPS system and present a UPS system design including parts and materials to the KO for approval prior to purchase and installation.
Suggested UPS Systems:
Manufacturer: Vertiv Liebert EXM 480V
Manufacturer: Eaton 93PM 480V
Manufacturer: Schneider Electric Galaxy VS 480V
- New UPS is to be sized to existing load capacity plus 25% increase for future expansion.
- New UPS must fit within dimensions of existing room.
- New UPS system is to supply power to connected equipment for a runtime of 60 minutes.
- UPS Battery Type: Lithium Ion
- UPS Flame retardant case and cover meet UL 1778 standards.
- UPS system complies with the most recent version of following standards: UL1778, UL924, UL1989 and UL94 V-2, BS 6290-4, IEC-60896-2 as well as standards referenced in Section 4, and all relevant Federal, State, and local standards and codes.
Room #339
- Contractor shall remove existing parts, and supply and install new parts listed below for UPS System located in Building 4 room #339. New parts to be Brand Name, Like-in-kind, or approved equal.
UPS Manufacturer and Model- Vertiv Liebert NPower 100 kVA Serial #37-6101
- Replace thirty (30) Capacitors: 90uF, 370VAC.
- Replace six (12) Capacitors: 46uF, 580VAC.
- Replace twelve (12) Capacitors: 7,900uF, 350VDC.
- Replace three (3) Capacitors: 490,000uF, 35VDC.
- Replace twelve (12) Axial Fans: 115VAC, 235cfm, Sensing.
- Replace three (3) IGBT driver boards.
- Replace forty (40) batteries. See Section 3.1.3 for battery specifications.
- UPS Battery specifications:
Battery Type: Valve-Regulated Lead Acid (VRLA)
Voltage: 12 volt
Amp Hour: 93.2 AH at the 20 hour rate
Watts per Cell: 350 at 15 minute rate to 1.67 VPC
Terminal Type: Threaded Receptacle
Normal operating temperature range
Discharge -40oF to 160 oF
Charge -10oF to 140 oF
Float charging voltage 13.65 ± 0.15 VDC average per 12V unit (6.75 to 6.90 per 6V unit)
- Contractor shall remove existing batteries, capacitors, axial fans, driver boards, then clean UPS system before replacing with new parts.
- All materials and parts supplied by the contractor in this SOW shall be new, are fully compatible with the entire UPS system, and comply with the UPS manufacturer’s specifications and installation standards. All materials and parts shall be approved by the KO prior to installation.
- Contractor shall mark all circuits, conduits, utility boxes and panels then and inspect all work to ensure work is done correctly and both UPS systems are properly working.
- Conduct functional alarm test. Check the UPS functionality, LED display, and alarm messages.
- Conduct UPS Burn-in test to verify that the UPS systems can operate at the rated load under ambient room temperature conditions. The procedure here is to load the UPS to rated load and operate it from 8 hours to 24 hours, depending on contractual requirements.
- Conduct UPS Start and Stop Test demonstrates correct operation when the UPS is switched on and off with full load.
- Conduct UPS full load battery discharge test for a minimum of 15 minutes.
- Conduct loss and return of main test.
- Conduct load transfer test.
- Conduct combined testing if applicable.
- Conduct test and verify that UPS system will provide service to connected equipment for 60 minutes.
- If other parts of the UPS system not specified in this Statement of Work malfunction or become defective during replacement and testing, contractor is to promptly notify the KO to determine best course of action.
- Any item or service not covered in the scope of the contract will need to be authorized by the KO prior to purchase or performance of work.
Submit quotes to the following e-mail address by the offer due date and time:
Attn: Elizabeth Meister E-Mail Address: Elizabeth.a.meister@uscg.mil with solicitation RFQ number SPS-USCG-250003 in subject line.
Update #6 ·
UPDATE 4: Close of contract opportunity was extended. All Offers due by 10JAN2024 @1300.
UPDATE 3: See attached photographs for reference of the space and units. The serial numbers for the current units are 37-6102 in Room 339 and 37-6101 in Room #135.
UPDATE 2: Anyone intending on attending the site visit needs to email Elizabeth.a.meister@uscg.mil with the following information for Base Access: Your company, Full Name, DOB, DL # and State, sent NLT 1600 on 07JAN2025.
All questions, emails and inquiries are being reviewed and the responses will be posted to the soliciation.
UPDATE 1: We will be hosting a Site Visit on Jan 8th at 1000 at 1519 Alaskan Way S. Seattle, WA 98134, BLDG 4. All visitors will need to comply with the Base Restrictions outline in the SOW. State ID needs to be current. Reach out to KO: Elizabeth Meister via email elizabeth.a.meister@uscg.mil to confirm your intent to attend Site Visit prior to arrival. The Solicitation closing date has been moved to Jan 10th at 1300 PST to accomodate this update. For those unable to make the Site Visit, pictures of the array will be posted to this Soliciation on Monday for your review.
DESCRIPTION OF SERVICES: The Contractor shall provide all personnel, management, supervision, materials, tools, supplies, equipment, transportation, labor, and other items and services necessary to replace the Uninterruptible Power Supply (UPS) system in Building 4 room #135, and replace the batteries, fans, capacitors, and IGBT drivers for the UPS system located in Building #4 room #339, at Base Seattle. The contractor must perform to the standards in this contract. All work shall comply with all applicable codes, along with Federal, State and local regulations.
This notice is a combined synopsis/solicitation for a commercial products and commercial services in accordance with Federal Acquisition Regulation Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes a public solicitation. Please read this entire notice, the instructions herein, and the attachment documents carefully. This acquisition is on a Small Business Set-Aside only.
HOW TO RESPOND: To compete for this project, interested parties must be registered in SAM (System for Award Management) prior to close of this solicitation. https://www.sam.gov/portal/public/SAM/. The vendors SAM registration must be in an “ACTIVE” status prior to award. Vendors must ensure that the above listed NAICS codes are listed on their SAM registration to perform this type of service.
COST PROPOSALS: The contract will be awarded using simplified acquisition procedures in accordance with FAR part 13 and part 15 provide Firm Fixed-Price “broken out by labor hours, labor category, materials, and other direct costs”. Offerors must submit the proposal to Elizabeth Meister e-mail: elizabeth.a.meister@uscg.mil.
EVALUATION CRITERIA: The government will award a contract resulting from this request for quote (RFQ) to the responsible offeror whose offer conforming to the RFQ is the Lowest price Technically Acceptable (LPTA) quote. The lowest priced quote will be evaluated on technical acceptability, if it is found to be acceptable, an award will be made. If it is found to be unacceptable, the next lowest price will be evaluated. This process will continue until a technically acceptable offer is identified.
Description of Work Required:
Room #135
- Contractor shall remove and dispose of existing UPS system located in Building 4 room #135, and supply and install a new UPS system with new lithium-ion batteries. Contractor to replace system with Brand Name or approved equal.
- Existing UPS Manufacturer and Model- Vertiv Liebert NPower 100 kVA 480 Volt 3-phase. Incoming voltage to UPS is 480V. After UPS, voltage steps down to 208V.
- It is estimated that the capacity of the existing UPS system in room #135 is too large. Contractor is to determine load and capacity on current UPS system and present a UPS system design including parts and materials to the KO for approval prior to purchase and installation.
Suggested UPS Systems:
Manufacturer: Vertiv Liebert EXM 480V
Manufacturer: Eaton 93PM 480V
Manufacturer: Schneider Electric Galaxy VS 480V
- New UPS is to be sized to existing load capacity plus 25% increase for future expansion.
- New UPS must fit within dimensions of existing room.
- New UPS system is to supply power to connected equipment for a runtime of 60 minutes.
- UPS Battery Type: Lithium Ion
- UPS Flame retardant case and cover meet UL 1778 standards.
- UPS system complies with the most recent version of following standards: UL1778, UL924, UL1989 and UL94 V-2, BS 6290-4, IEC-60896-2 as well as standards referenced in Section 4, and all relevant Federal, State, and local standards and codes.
Room #339
- Contractor shall remove existing parts, and supply and install new parts listed below for UPS System located in Building 4 room #339. New parts to be Brand Name, Like-in-kind, or approved equal.
UPS Manufacturer and Model- Vertiv Liebert NPower 100 kVA Serial #37-6101
- Replace thirty (30) Capacitors: 90uF, 370VAC.
- Replace six (12) Capacitors: 46uF, 580VAC.
- Replace twelve (12) Capacitors: 7,900uF, 350VDC.
- Replace three (3) Capacitors: 490,000uF, 35VDC.
- Replace twelve (12) Axial Fans: 115VAC, 235cfm, Sensing.
- Replace three (3) IGBT driver boards.
- Replace forty (40) batteries. See Section 3.1.3 for battery specifications.
- UPS Battery specifications:
Battery Type: Valve-Regulated Lead Acid (VRLA)
Voltage: 12 volt
Amp Hour: 93.2 AH at the 20 hour rate
Watts per Cell: 350 at 15 minute rate to 1.67 VPC
Terminal Type: Threaded Receptacle
Normal operating temperature range
Discharge -40oF to 160 oF
Charge -10oF to 140 oF
Float charging voltage 13.65 ± 0.15 VDC average per 12V unit (6.75 to 6.90 per 6V unit)
- Contractor shall remove existing batteries, capacitors, axial fans, driver boards, then clean UPS system before replacing with new parts.
- All materials and parts supplied by the contractor in this SOW shall be new, are fully compatible with the entire UPS system, and comply with the UPS manufacturer’s specifications and installation standards. All materials and parts shall be approved by the KO prior to installation.
- Contractor shall mark all circuits, conduits, utility boxes and panels then and inspect all work to ensure work is done correctly and both UPS systems are properly working.
- Conduct functional alarm test. Check the UPS functionality, LED display, and alarm messages.
- Conduct UPS Burn-in test to verify that the UPS systems can operate at the rated load under ambient room temperature conditions. The procedure here is to load the UPS to rated load and operate it from 8 hours to 24 hours, depending on contractual requirements.
- Conduct UPS Start and Stop Test demonstrates correct operation when the UPS is switched on and off with full load.
- Conduct UPS full load battery discharge test for a minimum of 15 minutes.
- Conduct loss and return of main test.
- Conduct load transfer test.
- Conduct combined testing if applicable.
- Conduct test and verify that UPS system will provide service to connected equipment for 60 minutes.
- If other parts of the UPS system not specified in this Statement of Work malfunction or become defective during replacement and testing, contractor is to promptly notify the KO to determine best course of action.
- Any item or service not covered in the scope of the contract will need to be authorized by the KO prior to purchase or performance of work.
Submit quotes to the following e-mail address by the offer due date and time:
Attn: Elizabeth Meister E-Mail Address: Elizabeth.a.meister@uscg.mil with solicitation RFQ number SPS-USCG-250003 in subject line.
Update #5 ·
UPDATE 3: See attached photographs for reference of the space and units. The serial numbers for the current units are 37-6102 in Room 339 and 37-6101 in Room #135.
UPDATE 2: Anyone intending on attending the site visit needs to email Elizabeth.a.meister@uscg.mil with the following information for Base Access: Your company, Full Name, DOB, DL # and State, sent NLT 1600 on 07JAN2025.
All questions, emails and inquiries are being reviewed and the responses will be posted to the soliciation.
UPDATE 1: We will be hosting a Site Visit on Jan 8th at 1000 at 1519 Alaskan Way S. Seattle, WA 98134, BLDG 4. All visitors will need to comply with the Base Restrictions outline in the SOW. State ID needs to be current. Reach out to KO: Elizabeth Meister via email elizabeth.a.meister@uscg.mil to confirm your intent to attend Site Visit prior to arrival. The Solicitation closing date has been moved to Jan 10th at 1300 PST to accomodate this update. For those unable to make the Site Visit, pictures of the array will be posted to this Soliciation on Monday for your review.
DESCRIPTION OF SERVICES: The Contractor shall provide all personnel, management, supervision, materials, tools, supplies, equipment, transportation, labor, and other items and services necessary to replace the Uninterruptible Power Supply (UPS) system in Building 4 room #135, and replace the batteries, fans, capacitors, and IGBT drivers for the UPS system located in Building #4 room #339, at Base Seattle. The contractor must perform to the standards in this contract. All work shall comply with all applicable codes, along with Federal, State and local regulations.
This notice is a combined synopsis/solicitation for a commercial products and commercial services in accordance with Federal Acquisition Regulation Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes a public solicitation. Please read this entire notice, the instructions herein, and the attachment documents carefully. This acquisition is on a Small Business Set-Aside only.
HOW TO RESPOND: To compete for this project, interested parties must be registered in SAM (System for Award Management) prior to close of this solicitation. https://www.sam.gov/portal/public/SAM/. The vendors SAM registration must be in an “ACTIVE” status prior to award. Vendors must ensure that the above listed NAICS codes are listed on their SAM registration to perform this type of service.
COST PROPOSALS: The contract will be awarded using simplified acquisition procedures in accordance with FAR part 13 and part 15 provide Firm Fixed-Price “broken out by labor hours, labor category, materials, and other direct costs”. Offerors must submit the proposal to Elizabeth Meister e-mail: elizabeth.a.meister@uscg.mil.
EVALUATION CRITERIA: The government will award a contract resulting from this request for quote (RFQ) to the responsible offeror whose offer conforming to the RFQ is the Lowest price Technically Acceptable (LPTA) quote. The lowest priced quote will be evaluated on technical acceptability, if it is found to be acceptable, an award will be made. If it is found to be unacceptable, the next lowest price will be evaluated. This process will continue until a technically acceptable offer is identified.
Description of Work Required:
Room #135
- Contractor shall remove and dispose of existing UPS system located in Building 4 room #135, and supply and install a new UPS system with new lithium-ion batteries. Contractor to replace system with Brand Name or approved equal.
- Existing UPS Manufacturer and Model- Vertiv Liebert NPower 100 kVA 480 Volt 3-phase. Incoming voltage to UPS is 480V. After UPS, voltage steps down to 208V.
- It is estimated that the capacity of the existing UPS system in room #135 is too large. Contractor is to determine load and capacity on current UPS system and present a UPS system design including parts and materials to the KO for approval prior to purchase and installation.
Suggested UPS Systems:
Manufacturer: Vertiv Liebert EXM 480V
Manufacturer: Eaton 93PM 480V
Manufacturer: Schneider Electric Galaxy VS 480V
- New UPS is to be sized to existing load capacity plus 25% increase for future expansion.
- New UPS must fit within dimensions of existing room.
- New UPS system is to supply power to connected equipment for a runtime of 60 minutes.
- UPS Battery Type: Lithium Ion
- UPS Flame retardant case and cover meet UL 1778 standards.
- UPS system complies with the most recent version of following standards: UL1778, UL924, UL1989 and UL94 V-2, BS 6290-4, IEC-60896-2 as well as standards referenced in Section 4, and all relevant Federal, State, and local standards and codes.
Room #339
- Contractor shall remove existing parts, and supply and install new parts listed below for UPS System located in Building 4 room #339. New parts to be Brand Name, Like-in-kind, or approved equal.
UPS Manufacturer and Model- Vertiv Liebert NPower 100 kVA Serial #37-6101
- Replace thirty (30) Capacitors: 90uF, 370VAC.
- Replace six (12) Capacitors: 46uF, 580VAC.
- Replace twelve (12) Capacitors: 7,900uF, 350VDC.
- Replace three (3) Capacitors: 490,000uF, 35VDC.
- Replace twelve (12) Axial Fans: 115VAC, 235cfm, Sensing.
- Replace three (3) IGBT driver boards.
- Replace forty (40) batteries. See Section 3.1.3 for battery specifications.
- UPS Battery specifications:
Battery Type: Valve-Regulated Lead Acid (VRLA)
Voltage: 12 volt
Amp Hour: 93.2 AH at the 20 hour rate
Watts per Cell: 350 at 15 minute rate to 1.67 VPC
Terminal Type: Threaded Receptacle
Normal operating temperature range
Discharge -40oF to 160 oF
Charge -10oF to 140 oF
Float charging voltage 13.65 ± 0.15 VDC average per 12V unit (6.75 to 6.90 per 6V unit)
- Contractor shall remove existing batteries, capacitors, axial fans, driver boards, then clean UPS system before replacing with new parts.
- All materials and parts supplied by the contractor in this SOW shall be new, are fully compatible with the entire UPS system, and comply with the UPS manufacturer’s specifications and installation standards. All materials and parts shall be approved by the KO prior to installation.
- Contractor shall mark all circuits, conduits, utility boxes and panels then and inspect all work to ensure work is done correctly and both UPS systems are properly working.
- Conduct functional alarm test. Check the UPS functionality, LED display, and alarm messages.
- Conduct UPS Burn-in test to verify that the UPS systems can operate at the rated load under ambient room temperature conditions. The procedure here is to load the UPS to rated load and operate it from 8 hours to 24 hours, depending on contractual requirements.
- Conduct UPS Start and Stop Test demonstrates correct operation when the UPS is switched on and off with full load.
- Conduct UPS full load battery discharge test for a minimum of 15 minutes.
- Conduct loss and return of main test.
- Conduct load transfer test.
- Conduct combined testing if applicable.
- Conduct test and verify that UPS system will provide service to connected equipment for 60 minutes.
- If other parts of the UPS system not specified in this Statement of Work malfunction or become defective during replacement and testing, contractor is to promptly notify the KO to determine best course of action.
- Any item or service not covered in the scope of the contract will need to be authorized by the KO prior to purchase or performance of work.
Submit quotes to the following e-mail address by the offer due date and time:
Attn: Elizabeth Meister E-Mail Address: Elizabeth.a.meister@uscg.mil with solicitation RFQ number SPS-USCG-250003 in subject line.
Update #4 ·
UPDATE: Anyone intending on attending the site visit needs to email Elizabeth.a.meister@uscg.mil with the following information for Base Access: Your company, Full Name, DOB, DL # and State, sent NLT 1600 on 07JAN2025.
All questions, emails and inquiries are being reviewed and the responses will be posted to the soliciation.
UPDATE: We will be hosting a Site Visit on Jan 8th at 1000 at 1519 Alaskan Way S. Seattle, WA 98134, BLDG 4. All visitors will need to comply with the Base Restrictions outline in the SOW. State ID needs to be current. Reach out to KO: Elizabeth Meister via email elizabeth.a.meister@uscg.mil to confirm your intent to attend Site Visit prior to arrival. The Solicitation closing date has been moved to Jan 10th at 1300 PST to accomodate this update. For those unable to make the Site Visit, pictures of the array will be posted to this Soliciation on Monday for your review.
DESCRIPTION OF SERVICES: The Contractor shall provide all personnel, management, supervision, materials, tools, supplies, equipment, transportation, labor, and other items and services necessary to replace the Uninterruptible Power Supply (UPS) system in Building 4 room #135, and replace the batteries, fans, capacitors, and IGBT drivers for the UPS system located in Building #4 room #339, at Base Seattle. The contractor must perform to the standards in this contract. All work shall comply with all applicable codes, along with Federal, State and local regulations.
This notice is a combined synopsis/solicitation for a commercial products and commercial services in accordance with Federal Acquisition Regulation Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes a public solicitation. Please read this entire notice, the instructions herein, and the attachment documents carefully. This acquisition is on a Small Business Set-Aside only.
HOW TO RESPOND: To compete for this project, interested parties must be registered in SAM (System for Award Management) prior to close of this solicitation. https://www.sam.gov/portal/public/SAM/. The vendors SAM registration must be in an “ACTIVE” status prior to award. Vendors must ensure that the above listed NAICS codes are listed on their SAM registration to perform this type of service.
COST PROPOSALS: The contract will be awarded using simplified acquisition procedures in accordance with FAR part 13 and part 15 provide Firm Fixed-Price “broken out by labor hours, labor category, materials, and other direct costs”. Offerors must submit the proposal to Elizabeth Meister e-mail: elizabeth.a.meister@uscg.mil.
EVALUATION CRITERIA: The government will award a contract resulting from this request for quote (RFQ) to the responsible offeror whose offer conforming to the RFQ is the Lowest price Technically Acceptable (LPTA) quote. The lowest priced quote will be evaluated on technical acceptability, if it is found to be acceptable, an award will be made. If it is found to be unacceptable, the next lowest price will be evaluated. This process will continue until a technically acceptable offer is identified.
Description of Work Required:
Room #135
- Contractor shall remove and dispose of existing UPS system located in Building 4 room #135, and supply and install a new UPS system with new lithium-ion batteries. Contractor to replace system with Brand Name or approved equal.
- Existing UPS Manufacturer and Model- Vertiv Liebert NPower 100 kVA 480 Volt 3-phase. Incoming voltage to UPS is 480V. After UPS, voltage steps down to 208V.
- It is estimated that the capacity of the existing UPS system in room #135 is too large. Contractor is to determine load and capacity on current UPS system and present a UPS system design including parts and materials to the KO for approval prior to purchase and installation.
Suggested UPS Systems:
Manufacturer: Vertiv Liebert EXM 480V
Manufacturer: Eaton 93PM 480V
Manufacturer: Schneider Electric Galaxy VS 480V
- New UPS is to be sized to existing load capacity plus 25% increase for future expansion.
- New UPS must fit within dimensions of existing room.
- New UPS system is to supply power to connected equipment for a runtime of 60 minutes.
- UPS Battery Type: Lithium Ion
- UPS Flame retardant case and cover meet UL 1778 standards.
- UPS system complies with the most recent version of following standards: UL1778, UL924, UL1989 and UL94 V-2, BS 6290-4, IEC-60896-2 as well as standards referenced in Section 4, and all relevant Federal, State, and local standards and codes.
Room #339
- Contractor shall remove existing parts, and supply and install new parts listed below for UPS System located in Building 4 room #339. New parts to be Brand Name, Like-in-kind, or approved equal.
UPS Manufacturer and Model- Vertiv Liebert NPower 100 kVA Serial #37-6101
- Replace thirty (30) Capacitors: 90uF, 370VAC.
- Replace six (12) Capacitors: 46uF, 580VAC.
- Replace twelve (12) Capacitors: 7,900uF, 350VDC.
- Replace three (3) Capacitors: 490,000uF, 35VDC.
- Replace twelve (12) Axial Fans: 115VAC, 235cfm, Sensing.
- Replace three (3) IGBT driver boards.
- Replace forty (40) batteries. See Section 3.1.3 for battery specifications.
- UPS Battery specifications:
Battery Type: Valve-Regulated Lead Acid (VRLA)
Voltage: 12 volt
Amp Hour: 93.2 AH at the 20 hour rate
Watts per Cell: 350 at 15 minute rate to 1.67 VPC
Terminal Type: Threaded Receptacle
Normal operating temperature range
Discharge -40oF to 160 oF
Charge -10oF to 140 oF
Float charging voltage 13.65 ± 0.15 VDC average per 12V unit (6.75 to 6.90 per 6V unit)
- Contractor shall remove existing batteries, capacitors, axial fans, driver boards, then clean UPS system before replacing with new parts.
- All materials and parts supplied by the contractor in this SOW shall be new, are fully compatible with the entire UPS system, and comply with the UPS manufacturer’s specifications and installation standards. All materials and parts shall be approved by the KO prior to installation.
- Contractor shall mark all circuits, conduits, utility boxes and panels then and inspect all work to ensure work is done correctly and both UPS systems are properly working.
- Conduct functional alarm test. Check the UPS functionality, LED display, and alarm messages.
- Conduct UPS Burn-in test to verify that the UPS systems can operate at the rated load under ambient room temperature conditions. The procedure here is to load the UPS to rated load and operate it from 8 hours to 24 hours, depending on contractual requirements.
- Conduct UPS Start and Stop Test demonstrates correct operation when the UPS is switched on and off with full load.
- Conduct UPS full load battery discharge test for a minimum of 15 minutes.
- Conduct loss and return of main test.
- Conduct load transfer test.
- Conduct combined testing if applicable.
- Conduct test and verify that UPS system will provide service to connected equipment for 60 minutes.
- If other parts of the UPS system not specified in this Statement of Work malfunction or become defective during replacement and testing, contractor is to promptly notify the KO to determine best course of action.
- Any item or service not covered in the scope of the contract will need to be authorized by the KO prior to purchase or performance of work.
Submit quotes to the following e-mail address by the offer due date and time:
Attn: Elizabeth Meister E-Mail Address: Elizabeth.a.meister@uscg.mil with solicitation RFQ number SPS-USCG-250003 in subject line.
Update #3 ·
UPDATE: We will be hosting a Site Visit on Jan 8th at 1000 at 1519 Alaskan Way S. Seattle, WA 98134, BLDG 4. All visitors will need to comply with the Base Restrictions outline in the SOW. State ID needs to be current. Reach out to KO: Elizabeth Meister via email elizabeth.a.meister@uscg.mil to confirm your intent to attend Site Visit prior to arrival. The Solicitation closing date has been moved to Jan 10th at 1300 PST to accomodate this update. For those unable to make the Site Visit, pictures of the array will be posted to this Soliciation on Monday for your review.
DESCRIPTION OF SERVICES: The Contractor shall provide all personnel, management, supervision, materials, tools, supplies, equipment, transportation, labor, and other items and services necessary to replace the Uninterruptible Power Supply (UPS) system in Building 4 room #135, and replace the batteries, fans, capacitors, and IGBT drivers for the UPS system located in Building #4 room #339, at Base Seattle. The contractor must perform to the standards in this contract. All work shall comply with all applicable codes, along with Federal, State and local regulations.
This notice is a combined synopsis/solicitation for a commercial products and commercial services in accordance with Federal Acquisition Regulation Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes a public solicitation. Please read this entire notice, the instructions herein, and the attachment documents carefully. This acquisition is on a Small Business Set-Aside only.
HOW TO RESPOND: To compete for this project, interested parties must be registered in SAM (System for Award Management) prior to close of this solicitation. https://www.sam.gov/portal/public/SAM/. The vendors SAM registration must be in an “ACTIVE” status prior to award. Vendors must ensure that the above listed NAICS codes are listed on their SAM registration to perform this type of service.
COST PROPOSALS: The contract will be awarded using simplified acquisition procedures in accordance with FAR part 13 and part 15 provide Firm Fixed-Price “broken out by labor hours, labor category, materials, and other direct costs”. Offerors must submit the proposal to Elizabeth Meister e-mail: elizabeth.a.meister@uscg.mil.
EVALUATION CRITERIA: The government will award a contract resulting from this request for quote (RFQ) to the responsible offeror whose offer conforming to the RFQ is the Lowest price Technically Acceptable (LPTA) quote. The lowest priced quote will be evaluated on technical acceptability, if it is found to be acceptable, an award will be made. If it is found to be unacceptable, the next lowest price will be evaluated. This process will continue until a technically acceptable offer is identified.
Description of Work Required:
Room #135
- Contractor shall remove and dispose of existing UPS system located in Building 4 room #135, and supply and install a new UPS system with new lithium-ion batteries. Contractor to replace system with Brand Name or approved equal.
- Existing UPS Manufacturer and Model- Vertiv Liebert NPower 100 kVA 480 Volt 3-phase. Incoming voltage to UPS is 480V. After UPS, voltage steps down to 208V.
- It is estimated that the capacity of the existing UPS system in room #135 is too large. Contractor is to determine load and capacity on current UPS system and present a UPS system design including parts and materials to the KO for approval prior to purchase and installation.
Suggested UPS Systems:
Manufacturer: Vertiv Liebert EXM 480V
Manufacturer: Eaton 93PM 480V
Manufacturer: Schneider Electric Galaxy VS 480V
- New UPS is to be sized to existing load capacity plus 25% increase for future expansion.
- New UPS must fit within dimensions of existing room.
- New UPS system is to supply power to connected equipment for a runtime of 60 minutes.
- UPS Battery Type: Lithium Ion
- UPS Flame retardant case and cover meet UL 1778 standards.
- UPS system complies with the most recent version of following standards: UL1778, UL924, UL1989 and UL94 V-2, BS 6290-4, IEC-60896-2 as well as standards referenced in Section 4, and all relevant Federal, State, and local standards and codes.
Room #339
- Contractor shall remove existing parts, and supply and install new parts listed below for UPS System located in Building 4 room #339. New parts to be Brand Name, Like-in-kind, or approved equal.
UPS Manufacturer and Model- Vertiv Liebert NPower 100 kVA Serial #37-6101
- Replace thirty (30) Capacitors: 90uF, 370VAC.
- Replace six (12) Capacitors: 46uF, 580VAC.
- Replace twelve (12) Capacitors: 7,900uF, 350VDC.
- Replace three (3) Capacitors: 490,000uF, 35VDC.
- Replace twelve (12) Axial Fans: 115VAC, 235cfm, Sensing.
- Replace three (3) IGBT driver boards.
- Replace forty (40) batteries. See Section 3.1.3 for battery specifications.
- UPS Battery specifications:
Battery Type: Valve-Regulated Lead Acid (VRLA)
Voltage: 12 volt
Amp Hour: 93.2 AH at the 20 hour rate
Watts per Cell: 350 at 15 minute rate to 1.67 VPC
Terminal Type: Threaded Receptacle
Normal operating temperature range
Discharge -40oF to 160 oF
Charge -10oF to 140 oF
Float charging voltage 13.65 ± 0.15 VDC average per 12V unit (6.75 to 6.90 per 6V unit)
- Contractor shall remove existing batteries, capacitors, axial fans, driver boards, then clean UPS system before replacing with new parts.
- All materials and parts supplied by the contractor in this SOW shall be new, are fully compatible with the entire UPS system, and comply with the UPS manufacturer’s specifications and installation standards. All materials and parts shall be approved by the KO prior to installation.
- Contractor shall mark all circuits, conduits, utility boxes and panels then and inspect all work to ensure work is done correctly and both UPS systems are properly working.
- Conduct functional alarm test. Check the UPS functionality, LED display, and alarm messages.
- Conduct UPS Burn-in test to verify that the UPS systems can operate at the rated load under ambient room temperature conditions. The procedure here is to load the UPS to rated load and operate it from 8 hours to 24 hours, depending on contractual requirements.
- Conduct UPS Start and Stop Test demonstrates correct operation when the UPS is switched on and off with full load.
- Conduct UPS full load battery discharge test for a minimum of 15 minutes.
- Conduct loss and return of main test.
- Conduct load transfer test.
- Conduct combined testing if applicable.
- Conduct test and verify that UPS system will provide service to connected equipment for 60 minutes.
- If other parts of the UPS system not specified in this Statement of Work malfunction or become defective during replacement and testing, contractor is to promptly notify the KO to determine best course of action.
- Any item or service not covered in the scope of the contract will need to be authorized by the KO prior to purchase or performance of work.
Submit quotes to the following e-mail address by the offer due date and time:
Attn: Elizabeth Meister E-Mail Address: Elizabeth.a.meister@uscg.mil with solicitation RFQ number SPS-USCG-250003 in subject line.
Update #2 ·
UPDATE: We will be hosting a Site Visit on Jan 8th at 1000 at 1519 Alaskan Way S. Seattle, WA 98134, BLDG 4. All visitors will need to comply with the Base Restrictions outline in the SOW. State ID needs to be current. Reach out to KO: Elizabeth Meister via email elizabeth.a.meister@uscg.mil to confirm your intent to attend Site Visit prior to arrival. The Solicitation closing date has been moved to Jan 10th at 1300 PST to accomodate this update.
DESCRIPTION OF SERVICES: The Contractor shall provide all personnel, management, supervision, materials, tools, supplies, equipment, transportation, labor, and other items and services necessary to replace the Uninterruptible Power Supply (UPS) system in Building 4 room #135, and replace the batteries, fans, capacitors, and IGBT drivers for the UPS system located in Building #4 room #339, at Base Seattle. The contractor must perform to the standards in this contract. All work shall comply with all applicable codes, along with Federal, State and local regulations.
This notice is a combined synopsis/solicitation for a commercial products and commercial services in accordance with Federal Acquisition Regulation Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes a public solicitation. Please read this entire notice, the instructions herein, and the attachment documents carefully. This acquisition is on a Small Business Set-Aside only.
HOW TO RESPOND: To compete for this project, interested parties must be registered in SAM (System for Award Management) prior to close of this solicitation. https://www.sam.gov/portal/public/SAM/. The vendors SAM registration must be in an “ACTIVE” status prior to award. Vendors must ensure that the above listed NAICS codes are listed on their SAM registration to perform this type of service.
COST PROPOSALS: The contract will be awarded using simplified acquisition procedures in accordance with FAR part 13 and part 15 provide Firm Fixed-Price “broken out by labor hours, labor category, materials, and other direct costs”. Offerors must submit the proposal to Elizabeth Meister e-mail: elizabeth.a.meister@uscg.mil.
EVALUATION CRITERIA: The government will award a contract resulting from this request for quote (RFQ) to the responsible offeror whose offer conforming to the RFQ is the Lowest price Technically Acceptable (LPTA) quote. The lowest priced quote will be evaluated on technical acceptability, if it is found to be acceptable, an award will be made. If it is found to be unacceptable, the next lowest price will be evaluated. This process will continue until a technically acceptable offer is identified.
Description of Work Required:
Room #135
- Contractor shall remove and dispose of existing UPS system located in Building 4 room #135, and supply and install a new UPS system with new lithium-ion batteries. Contractor to replace system with Brand Name or approved equal.
- Existing UPS Manufacturer and Model- Vertiv Liebert NPower 100 kVA 480 Volt 3-phase. Incoming voltage to UPS is 480V. After UPS, voltage steps down to 208V.
- It is estimated that the capacity of the existing UPS system in room #135 is too large. Contractor is to determine load and capacity on current UPS system and present a UPS system design including parts and materials to the KO for approval prior to purchase and installation.
Suggested UPS Systems:
Manufacturer: Vertiv Liebert EXM 480V
Manufacturer: Eaton 93PM 480V
Manufacturer: Schneider Electric Galaxy VS 480V
- New UPS is to be sized to existing load capacity plus 25% increase for future expansion.
- New UPS must fit within dimensions of existing room.
- New UPS system is to supply power to connected equipment for a runtime of 60 minutes.
- UPS Battery Type: Lithium Ion
- UPS Flame retardant case and cover meet UL 1778 standards.
- UPS system complies with the most recent version of following standards: UL1778, UL924, UL1989 and UL94 V-2, BS 6290-4, IEC-60896-2 as well as standards referenced in Section 4, and all relevant Federal, State, and local standards and codes.
Room #339
- Contractor shall remove existing parts, and supply and install new parts listed below for UPS System located in Building 4 room #339. New parts to be Brand Name, Like-in-kind, or approved equal.
UPS Manufacturer and Model- Vertiv Liebert NPower 100 kVA Serial #37-6101
- Replace thirty (30) Capacitors: 90uF, 370VAC.
- Replace six (12) Capacitors: 46uF, 580VAC.
- Replace twelve (12) Capacitors: 7,900uF, 350VDC.
- Replace three (3) Capacitors: 490,000uF, 35VDC.
- Replace twelve (12) Axial Fans: 115VAC, 235cfm, Sensing.
- Replace three (3) IGBT driver boards.
- Replace forty (40) batteries. See Section 3.1.3 for battery specifications.
- UPS Battery specifications:
Battery Type: Valve-Regulated Lead Acid (VRLA)
Voltage: 12 volt
Amp Hour: 93.2 AH at the 20 hour rate
Watts per Cell: 350 at 15 minute rate to 1.67 VPC
Terminal Type: Threaded Receptacle
Normal operating temperature range
Discharge -40oF to 160 oF
Charge -10oF to 140 oF
Float charging voltage 13.65 ± 0.15 VDC average per 12V unit (6.75 to 6.90 per 6V unit)
- Contractor shall remove existing batteries, capacitors, axial fans, driver boards, then clean UPS system before replacing with new parts.
- All materials and parts supplied by the contractor in this SOW shall be new, are fully compatible with the entire UPS system, and comply with the UPS manufacturer’s specifications and installation standards. All materials and parts shall be approved by the KO prior to installation.
- Contractor shall mark all circuits, conduits, utility boxes and panels then and inspect all work to ensure work is done correctly and both UPS systems are properly working.
- Conduct functional alarm test. Check the UPS functionality, LED display, and alarm messages.
- Conduct UPS Burn-in test to verify that the UPS systems can operate at the rated load under ambient room temperature conditions. The procedure here is to load the UPS to rated load and operate it from 8 hours to 24 hours, depending on contractual requirements.
- Conduct UPS Start and Stop Test demonstrates correct operation when the UPS is switched on and off with full load.
- Conduct UPS full load battery discharge test for a minimum of 15 minutes.
- Conduct loss and return of main test.
- Conduct load transfer test.
- Conduct combined testing if applicable.
- Conduct test and verify that UPS system will provide service to connected equipment for 60 minutes.
- If other parts of the UPS system not specified in this Statement of Work malfunction or become defective during replacement and testing, contractor is to promptly notify the KO to determine best course of action.
- Any item or service not covered in the scope of the contract will need to be authorized by the KO prior to purchase or performance of work.
Submit quotes to the following e-mail address by the offer due date and time:
Attn: Elizabeth Meister E-Mail Address: Elizabeth.a.meister@uscg.mil with solicitation RFQ number SPS-USCG-250003 in subject line.
Update #1 ·
DESCRIPTION OF SERVICES: The Contractor shall provide all personnel, management, supervision, materials, tools, supplies, equipment, transportation, labor, and other items and services necessary to replace the Uninterruptible Power Supply (UPS) system in Building 4 room #135, and replace the batteries, fans, capacitors, and IGBT drivers for the UPS system located in Building #4 room #339, at Base Seattle. The contractor must perform to the standards in this contract. All work shall comply with all applicable codes, along with Federal, State and local regulations.
This notice is a combined synopsis/solicitation for a commercial products and commercial services in accordance with Federal Acquisition Regulation Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes a public solicitation. Please read this entire notice, the instructions herein, and the attachment documents carefully. This acquisition is on a Small Business Set-Aside only.
HOW TO RESPOND: To compete for this project, interested parties must be registered in SAM (System for Award Management) prior to close of this solicitation. https://www.sam.gov/portal/public/SAM/. The vendors SAM registration must be in an “ACTIVE” status prior to award. Vendors must ensure that the above listed NAICS codes are listed on their SAM registration to perform this type of service.
COST PROPOSALS: The contract will be awarded using simplified acquisition procedures in accordance with FAR part 13 and part 15 provide Firm Fixed-Price “broken out by labor hours, labor category, materials, and other direct costs”. Offerors must submit the proposal to Elizabeth Meister e-mail: elizabeth.a.meister@uscg.mil.
EVALUATION CRITERIA: The government will award a contract resulting from this request for quote (RFQ) to the responsible offeror whose offer conforming to the RFQ is the Lowest price Technically Acceptable (LPTA) quote. The lowest priced quote will be evaluated on technical acceptability, if it is found to be acceptable, an award will be made. If it is found to be unacceptable, the next lowest price will be evaluated. This process will continue until a technically acceptable offer is identified.
Description of Work Required:
Room #135
- Contractor shall remove and dispose of existing UPS system located in Building 4 room #135, and supply and install a new UPS system with new lithium-ion batteries. Contractor to replace system with Brand Name or approved equal.
- Existing UPS Manufacturer and Model- Vertiv Liebert NPower 100 kVA 480 Volt 3-phase. Incoming voltage to UPS is 480V. After UPS, voltage steps down to 208V.
- It is estimated that the capacity of the existing UPS system in room #135 is too large. Contractor is to determine load and capacity on current UPS system and present a UPS system design including parts and materials to the KO for approval prior to purchase and installation.
Suggested UPS Systems:
Manufacturer: Vertiv Liebert EXM 480V
Manufacturer: Eaton 93PM 480V
Manufacturer: Schneider Electric Galaxy VS 480V
- New UPS is to be sized to existing load capacity plus 25% increase for future expansion.
- New UPS must fit within dimensions of existing room.
- New UPS system is to supply power to connected equipment for a runtime of 60 minutes.
- UPS Battery Type: Lithium Ion
- UPS Flame retardant case and cover meet UL 1778 standards.
- UPS system complies with the most recent version of following standards: UL1778, UL924, UL1989 and UL94 V-2, BS 6290-4, IEC-60896-2 as well as standards referenced in Section 4, and all relevant Federal, State, and local standards and codes.
Room #339
- Contractor shall remove existing parts, and supply and install new parts listed below for UPS System located in Building 4 room #339. New parts to be Brand Name, Like-in-kind, or approved equal.
UPS Manufacturer and Model- Vertiv Liebert NPower 100 kVA Serial #37-6101
- Replace thirty (30) Capacitors: 90uF, 370VAC.
- Replace six (12) Capacitors: 46uF, 580VAC.
- Replace twelve (12) Capacitors: 7,900uF, 350VDC.
- Replace three (3) Capacitors: 490,000uF, 35VDC.
- Replace twelve (12) Axial Fans: 115VAC, 235cfm, Sensing.
- Replace three (3) IGBT driver boards.
- Replace forty (40) batteries. See Section 3.1.3 for battery specifications.
- UPS Battery specifications:
Battery Type: Valve-Regulated Lead Acid (VRLA)
Voltage: 12 volt
Amp Hour: 93.2 AH at the 20 hour rate
Watts per Cell: 350 at 15 minute rate to 1.67 VPC
Terminal Type: Threaded Receptacle
Normal operating temperature range
Discharge -40oF to 160 oF
Charge -10oF to 140 oF
Float charging voltage 13.65 ± 0.15 VDC average per 12V unit (6.75 to 6.90 per 6V unit)
- Contractor shall remove existing batteries, capacitors, axial fans, driver boards, then clean UPS system before replacing with new parts.
- All materials and parts supplied by the contractor in this SOW shall be new, are fully compatible with the entire UPS system, and comply with the UPS manufacturer’s specifications and installation standards. All materials and parts shall be approved by the KO prior to installation.
- Contractor shall mark all circuits, conduits, utility boxes and panels then and inspect all work to ensure work is done correctly and both UPS systems are properly working.
- Conduct functional alarm test. Check the UPS functionality, LED display, and alarm messages.
- Conduct UPS Burn-in test to verify that the UPS systems can operate at the rated load under ambient room temperature conditions. The procedure here is to load the UPS to rated load and operate it from 8 hours to 24 hours, depending on contractual requirements.
- Conduct UPS Start and Stop Test demonstrates correct operation when the UPS is switched on and off with full load.
- Conduct UPS full load battery discharge test for a minimum of 15 minutes.
- Conduct loss and return of main test.
- Conduct load transfer test.
- Conduct combined testing if applicable.
- Conduct test and verify that UPS system will provide service to connected equipment for 60 minutes.
- If other parts of the UPS system not specified in this Statement of Work malfunction or become defective during replacement and testing, contractor is to promptly notify the KO to determine best course of action.
- Any item or service not covered in the scope of the contract will need to be authorized by the KO prior to purchase or performance of work.
Submit quotes to the following e-mail address by the offer due date and time:
Attn: Elizabeth Meister E-Mail Address: Elizabeth.a.meister@uscg.mil with solicitation RFQ number SPS-USCG-250003 in subject line.
Attachments
| File | Type | Posted |
|---|---|---|
| SF1449.pdf | ||
| SOW UPS Replacement.docx | DOCX document | |
| IMG_3921.jpg | JPG image | |
| IMG_3918.jpg | JPG image | |
| IMG_3924.jpg | JPG image | |
| IMG_3927.jpg | JPG image | |
| IMG_3926.jpg | JPG image | |
| IMG_3919.jpg | JPG image | |
| IMG_3925.jpg | JPG image | |
| SF1449 UPS Upgrade .docx | DOCX document | |
| SOW UPS replacement Bldg 4.docx | DOCX document |
Show all 11
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity