This Statement of Work outlines requirements for replacing two Uninterruptible Power Supply (UPS) systems at U.S. Coast Guard Base Seattle. The contractor must replace a 100 kVA Vertiv Liebert NPower UPS system in Building 4 room #135 with a new lithium-ion battery system, and replace the UPS system in room #339. The new UPS system must be sized for existing load capacity plus 25% expansion, provide 60-minute runtime, and meet UL standards. Approved manufacturers include Vertiv Liebert EXM, Eaton 93PM, or Schneider Electric Galaxy VS (all 480V).
Key requirements include contractor certification with 5 years' experience in 30-100 kVA 480V UPS systems, coordination of work hours (Monday-Friday 7:00am-3:30pm), security requirements including advance personnel lists and visit authorization letters, and comprehensive testing including burn-in tests, load transfer tests, and battery discharge tests. The contractor must submit work plans, certifications, product specifications, test results, and operations/maintenance documentation. Power outages are limited to 24 hours maximum. The Coast Guard will provide basic facilities but no equipment. All installation must comply with federal, state and local codes, with proper disposal of hazardous materials required.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF1449.pdf | ||
| IMG_3921.jpg | JPG image | |
| IMG_3918.jpg | JPG image | |
| IMG_3924.jpg | JPG image | |
| IMG_3927.jpg | JPG image | |
| IMG_3919.jpg | JPG image | |
| IMG_3925.jpg | JPG image | |
| IMG_3926.jpg | JPG image | |
| SF1449 UPS Upgrade .docx | DOCX document | |
| SOW UPS replacement Bldg 4.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
U.S. COAST GUARD
SECTION 1- GENERAL INFORMATION
1.1 DESCRIPTION OF SERVICES: The Contractor shall provide all personnel, management, supervision, materials, tools, supplies, equipment, transportation, labor, and other items and services necessary to replace a total of two (2) Uninterruptible Power Supply (UPS) systems in Building 4 room #135 and Building #4 room #339, at Base Seattle. The contractor must perform to the standards in this contract. All work shall comply with all applicable codes, along with Federal, State and local regulations.
1.2 PLACE OF PERFORMANCE:
BASE SEATTLE, 1519 Alaskan Way South, Seattle, WA 98134
1.3 PRE-BID SITE VISIT: A pre-bid site visit will be arranged for interested offerors. All interested offerors must arrive no later than 5 minutes prior to the start time indicated in order allow for coordination by the POC.
Date: ASAP__________ Start Time: 0700-1530______ Location: Base Seattle, bldg. 4 1519 Alaskan Way S Seattle, WA 98001______
1.4 CONTRACTING OFFICER (KO): In accordance with Federal Acquisitions Regulations (FAR) Part 1, Sub-part 1.6, the Contracting Officer (KO) is an official representative and directs all services performed under this agreement. The KO is the only representative with the authority to negotiate or initiate modifications, changes, or edits to this SOW.
Name: CWO Elizabeth Meister Sector Puget Sound Phone: (206) 217-6145 E-mail: elizabeth.a.meister@uscg.mil
1.5 CONTRACTING OFFICER’S REPRESENTATIVE POINT OF CONTACT (POC):
Name: Kimberly Swanson Unit: Facilities Engineering Phone: (206) 217-6451 E-mail: Kimberly.J.Swanson@uscg.mil
1.6 CONTACT FOR QUESTIONS:
1.6.1 Any questions regarding the SOW must be directed to the KO.
1.6.2 Unless specifically annotated, all requests for site visits must be scheduled through the POC as per section 1.5. Request can be submitted via phone call or e-mail.
1.7 CONTRACTOR SECURITY REQUIREMENTS:
1.7.1 The Contractor shall provide a list of all on-site contractor personnel, including sub-contractors (including second and third-tier subcontractors) and suppliers, to the POC at least 72 hours in advance. The contractor shall update this list when changes occur. Contractor personnel not listed may be denied access to the Coast Guard facility. Contractor personnel will be restricted to designated working areas. Any personnel violating this policy may lose access to the Coast Guard facility. Contractor personnel shall have photo identification at all times while working on Coast Guard facilities.
1.7.2 Contractor and delivery personnel may be required to present personal photo identification to gain access to a Coast Guard installation. If identification does not indicate United States citizenship, Coast Guard Security may require proof of the legal right to work in the United States. Contractor and delivery personnel also may be subjected to an immigration status and outstanding criminal warrant check.
1.7.3 The Real ID Act of 2005 established minimum security standards for license issuance and production and prohibits Federal agencies from accepting, for certain purposes, driver's licenses and identification cards from states not meeting the Act's minimum standards. Anyone requiring access to a military facility under this contract, to include subcontractors, who holds a driver's license from any state without approved licenses will be required to provide identification other than that driver's license to gain access. Government IDs annotated with “Federal Limits Apply” will not be accepted for access purposes. It is the responsibility of the Contractor to ensure that their personnel have federally acceptable personal photo identification and comply with any other requirements for base access.
1.7.4 Contractors shall provide the KO or POC with 24 hours of advance notice of every delivery to the site and provide the company name, delivery person, and phone number of the firm(s) making deliveries. All vehicle access to government property requires vehicle registration and proof of liability insurance. Otherwise, access to the Coast Guard facility may be denied.
1.7.5 Due to heightened security, all contractor employees performing tasks related to this Agreement on a Coast Guard facility shall wear identification badges. The identification badges must, at a minimum, contain contractors’ business name, contractor employees’ name, and contractor employees’ photo in plain view, on front, and above the waist at all times. All contractor employees working on-site shall be required to complete a security arrival brief upon check-in. This may include the inspection and tagging of computer equipment and other electronic devices that may be required by the contractor employee to perform their assigned tasks. Time spent undergoing security inspections whether it be in regards to the entrance to USCG facilities or spaces will not be considered a government delay of work or differing site condition.
1.7.6 Contractor employee access to sensitive but unclassified (for-official-use-only) information is required under this contract. Although access to classified restricted spaces at the Area and District Command Centers is required, the classified restricted space shall be sanitized throughout the contractor’s visit and an escort shall accompany the contractor at all times.
1.7.7 Contractor personnel shall read, complete and sign the Department of Homeland Security Non-Disclosure Agreement – DHS Form 11000-6 (series). This form will be maintained on file by the Contracting Officer or servicing CG Command Security Officer.
1.7.8 DHS MD 11055 states that waivers to the U.S. citizen requirement may only granted by the Head of the Component or designee with the concurrence of both the DHS CSO and CIO or their designees.
1.7.9 The contractor’s facility security officer (FSO) shall provide a visit authorization letter (VAL) to Sector Puget Sound Command Security Officer at least five business days in advance of commencing work. The VAL shall identify all contractor employees requiring access to the job site. Questions concerning VAL requirements shall be directed to Sector Puget Sound Command Security Officer at (206) 217-6162.
1.7.10 The government is the only source for media release information. The contractor employee shall not provide any government-related information to the media and shall refer all queries to the COR or KO.
1.7.11 Contractor employees shall safeguard this information against unauthorized disclosure or dissemination in accordance with DHS MD 11042.1, “Safeguarding SBU/FOUO information.” SBU includes information categorized by DHS or other government agencies as: For Official Use Only (FOUO); Official Use Only (OUO); Sensitive Homeland Security Information (SHSI); Limited Official Use (LOU); Law Enforcement Sensitive (LES); Safeguarding Information (SGI); Unclassified Controlled Nuclear Information (UCNI); and any other identifier used by other government agencies to categorize information as sensitive but unclassified. The Contractor shall sign a non-disclosure agreement (DHS Form 11000-6). The Contractor shall continue to ensure employees safeguard this information when the new Controlled Unclassified Information (CUI) framework replaces the Sensitive but Unclassified (SBU) categorization.
1.7.12 The contractor shall implement procedures whereby any loss, compromise, or suspected loss or compromise of sensitive but unclassified information or material issued under this contract is promptly reported to the designated Contracting Officer (KO). The KO shall provide a complete report of the loss to the servicing USCG Command Security Officer and Contracting Officer.
1.8 CONTRACTOR PERSONNEL:
1.8.1 Contract Manager. The contractor must provide a contract manager who must be responsible for the performance of the work. The name of this person and an alternate or alternates who will act on behalf of the contractor when the manager is absent must be designated in writing to the KO.
1.8.2 The contract manager or alternate must have full authority to act for the contractor on all contract matters relating to daily operation of this contract.
1.8.3 The contact manager and alternate or alternates must be able to read, write, speak, and understand the English language.
1.8.4 The contractor must not employ persons for work on this contract if such employee is considered by the KO to be a potential threat to the health, safety, security, general well-being, or operational mission of the installation and its population.
1.8.5 Contactor personnel must present a neat appearance and be easily recognized as contractor employees.
1.8.6 The Contractor must not employ any person who is an employee of the U.S. Government if employing that person would create a conflict of interest. Additionally, the contractor must not employ any person who is an employee of the U. S. Coast Guard unless such person seeks and receives approval according to U. S. Coast Guard regulations.
1.8.7 Contractor’s employees shall comply with all applicable government regulations, policies and procedures, e.g., fire, safety, sanitation, environmental protection, and security, when visiting or working at government facilities. The contractor shall ensure contractor employees present a professional appearance at all times and that their conduct shall not bring discredit on the United States, the Department of Homeland Security or the U.S. Coast Guard. The contractor employee shall not release any government personnel contact information or information concerning official unit business or operations to unauthorized parties.
1.8.8 The contractor employees shall be responsible for safeguarding all government equipment, information and property provided for contractor use. At the close of each work period, the contractor employee shall secure work areas, equipment and materials to prevent loss.
1.9 SPECIAL QUALIFICATIONS: Contractor shall have a minimum of 5 years’ experience in design, repair, and testing of 30 KVA to 100 KVA 480 volt UPS systems. All contractor and contractor employee certifications to be submitted to KO.
1.10 WORK SCHEDULE:
1.10.1 The contractor will perform the tasks as required by the SOW under this contract during the following hours: Monday through Friday between 7:00am and 3:30pm excluding Federal Holidays unless another time is specified.
1.10.2 All work will be performed during normal business hours as long as it does not impact Base operations. Work performed shall be coordinated with the KO prior to job commencement to ensure that the schedule of work of other trades, or work being done on Base goes smoothly.
1.10.3 Special event, or adjusted work hours: If circumstances should arise wherein the contractor desires a different work schedule as required above, the contractor must request same in writing. Submit a written request to the POC a minimum of 24 hours before the requested adjusted work schedule. If the desired schedule change is to be effective on a Monday, the request must be submitted to the POC prior to 9:00am on the Friday prior to commencement of work.
1.10.4 At least three (3) business days prior to the start of work, the names or those who will be working on site shall be submitted to the POC ahead of time for inclusion into the base access list. If vehicle parking is required, the names of all drivers and their vehicle information should be submitted prior to the start date. Parking is very limited on base and efforts should be taken to minimize the number of vehicles accessing the base through the use of an offsite parking lot, garage or vanpool.
1.11 NOTIFICATION OF START AND COMPLETION OF WORK: The Contractor shall notify the Contracting Officer in writing five (5) business days in advance of the date they intend to commence work, and five (5) business days prior to the date that work will be ready for final inspection.
1.12 AWARD: It is the government’s intent to make award to the low cost responsive and responsible offeror through issuance of a firm fixed price contract. Under FAR 4.1103 prospective contractor shall be registered in System Award Management (SAM) prior to award. Failure for contractor to be registered in SAM shall result in Contracting Officer to proceed with next successful registered offeror. Website: www.sam.gov
1.13 INVOICING: The Contractor is required to submit proper invoices through the U.S. Department of Treasury’s Invoice Processing Platform (IPP). The POC provided in the SAM.gov registration will have their IPP login and a link to the IPP application. Registration and annual renewal in SAM.gov is free of charge and required to do business with government, per FAR Part 4. If you have any questions about IPP, you must contact FINCEN at: SMB-FSMS VendorSupport@uscg.mil
SECTION 2- GOVERNMENT FURNISHED PROPERTY AND SERVICES:
General Information: The Government must provide the facilities, equipment, materials, and services listed here.
| 2.1 | Government Furnished Facilities: |
| 2.1.1 | Electricity and water will be provided at no cost by the Government for normal building services. Additional hookups or temporary connections shall be the responsibility of the contractor and shall be removed by the contractor upon completion of work. |
| 2.1.2 | The Government will provide toilet facilities for personal sanitary use only. Equipment shall not be cleaned in the government provided facilities. Misuse or lack of cleanliness will result in termination of toilet privileges at no additional cost to the Government. |
2.2 Government Furnished Equipment:
2.2.1 NONE
SECTION 3- SPECIFIC TASKS
The contractor shall provide all personnel, management, supervision, materials, tools, supplies, equipment, transportation, and labor to fulfill all the requirements of this Statement of Work (SOW).
Contractor may recommend equivalent or better parts and materials to the KO for consideration.
3.1 WORK REQUIREMENTS:
3.1.1 Contractor shall replace two (2) UPS Systems. Contractor to remove and dispose of existing UPS system located in Building 4 room #135, and UPS system in Room #339, and supply and install new UPS systems with new lithium-ion batteries. Contractor to replace system with Brand Name or approved equal.
Existing UPS Manufacturer and Model for both systems- Vertiv Liebert NPower 100 kVA 480 Volt 3-phase. Incoming voltage to UPS is 480V. After UPS, voltage steps down to 208V.
3.1.2 It is estimated that the capacity of the existing UPS system in each room is too large. Contractor is to present a UPS system design to the KO for approval prior to purchase and installation.
Suggested UPS Systems:
Manufacturer: Vertiv Liebert EXM 480V Manufacturer: Eaton 93PM 480V Manufacturer: Schneider Electric Galaxy VS 480V
| 3.1.3 | Existing load on UPS System in room #135 and room #339 is approximately 26% | ||
| 3.1.4 | New UPS is to be sized to existing load capacity plus 25% increase for future expansion. | ||
| 3.1.5 | New UPS must fit within dimensions of existing room. | ||
| 3.1.6 | New UPS system is to supply power to connected equipment for a runtime of 60 | minutes | |
| 3.1.7 | UPS Battery Type: Lithium Ion | ||
| 3.1.8 | Flame retardant case and cover meet UL 1778 standards. | ||
| 3.1.9 | UPS system complies with the most recent version of following standards: UL1778, UL924, UL1989 and UL94 V-2, BS 6290-4, IEC-60896-2 as well as standards referenced in Section 4, and all relevant Federal, State, and local standards and codes. | ||
| 3.1.10 | All materials and parts supplied by the contractor in this SOW shall be new, are fully compatible with the entire UPS system, and comply with the UPS manufacturer’s specifications and installation standards. All materials and parts shall be approved by the KO prior to installation. | ||
| 3.1.11 | Contractor shall mark all circuits, conduits, utility boxes and panels then and inspect all work to ensure work is done correctly and both UPS systems are properly working. | ||
| 3.1.12 | Conduct functional alarm test. Check the UPS functionality, LED display, and alarm messages. | ||
| 3.1.13 | Conduct UPS Burn-in test to verify that the UPS systems can operate at the rated load under ambient room temperature conditions. The procedure here is to load the UPS to rated load and operate it from 8 hours to 24 hours, depending on contractual requirements. | ||
| 3.1.14 | Conduct UPS Start and Stop Test demonstrates correct operation when the UPS is switched on and off with full load. | ||
| 3.1.15 | Conduct UPS full load battery discharge test for a minimum of 15 minutes. | ||
| 3.1.16 | Conduct loss and return of main test. | ||
| 3.1.17 | Conduct load transfer test. | ||
| 3.1.18 | Conduct combined testing if applicable. | ||
| 3.1.19 | Conduct test and verify that UPS system will provide service to connected equipment for 60 minutes. | ||
| 3.1.20 | If other parts of the UPS system not specified in this Statement of Work malfunction or become defective during replacement and testing, contractor is to promptly notify the KO to determine best course of action. | ||
| 3.1.21 | Any item or service not covered in the scope of the contract will need to be authorized by the KO prior to purchase or performance of work. |
| 3.2 | QUALITY ASSURANCE AND WORKMANSHIP: | |
| 3.2.1 | Contractors interested should make a physical inspection (on site) of the facility prior to preparing any offer to make an accurate assessment of the level of work required along with verifying all existing conditions. The pre-bid site visit schedule is found in Section 1.3 and it is recommended that contractors attend the pre-bid site visit and ask questions to the KO prior to the bid closing date. |
| 3.2.2 | All installation, inspections, testing, maintenance, repairs, and other work items shall be performed according to manufacturer’s specifications. Review manufacturer’s operations and maintenance manual thoroughly prior to performing any work. | ||
| 3.2.3 | All work and materials shall comply with all Federal, State, and local codes and | standards, in addition to those mentioned in Section 4. |
| 3.3 | INCIDENTAL DAMAGES: |
| 3.3.1 | Contractor is responsible for any damage caused to Government property during the delivery, installation, and all other work performed. Any incidental damages caused by the contractor shall be repaired or replaced at the contractor’s expense. Prime contractors shall be responsible for damage caused by their Subcontractors. |
| 3.3.2 | Prior to performing any work, the contractor should make note of any existing conditions that could be construed as incidental damage and report it to the KO in writing. |
3.4 SUBMITTALS:
Forward all submittals to the KO within 14 calendar days prior to commencement of work, unless otherwise noted below. All submittals shall be provided in an electronic image format unless an alternate format is approved by the KO.
| 3.4.1 | Contractor shall provide a work plan, time tables, and material lead times to KO 14 calendar days prior to start of work. |
| 3.4.2 | Contractor shall submit certifications to perform work on Vertiv Liebert UPS systems to KO. |
| 3.4.3 | Contractor shall submit certifications of all test equipment that will be used to complete the work. |
| 3.4.4 | Any power outage shall be no more than 24 hours. Contractor shall coordinate with Facilities representative and KO to de-energize the UPS systems prior to start of work. |
| 3.4.5 | Contractor shall submit product specification/catalog cut sheets for new UPS system components to KO for approval prior to purchase and installation. |
| 3.4.6 | Prior to completion of work, contractor shall submit all field test results and test reports to KO indicating that the UPS components have been properly installed, adjusted, and tested according to manufacturer requirements. |
| 3.4.7 | Operations & Maintenance Documentation: Prior to completion of work, contractor shall submit operations and maintenance documentation from the manufacturer for all items installed. Documentation should include troubleshooting guidance, maintenance instructions, and spare parts list. Certificates of inspection should also be included if provided by the manufacturer. |
| 3.4.8 | Safety Data Sheets (SDS's): Copies of all SDS's for all hazardous materials shall be submitted along with a listing of quantities of these hazardous materials proposed to be stored on site. |
| 3.4.9 | Hazardous Waste and Recycling Receipts: Upon disposal and/or recycling of hazardous materials to the EPA approved disposal facility, submit copies of the acceptance receipts to the KO within 5 calendar days of delivery. |
| 3.5 | ENVIRONMENTAL PROTECTION AND SAFETY REQUIREMENTS: |
| 3.5.1 | Contractor shall provide and maintain environmental protection during the life of the Contract to control pollution or to correct conditions that develop during construction, maintenance, and repair. Comply with all Federal, State, and local regulations pertaining to water, air, soil and noise pollution. |
| 3.5.2 | The contractor shall provide all necessary materials, coatings and paints required by this contract. Upon completion of work, the contractor shall remove and dispose of all remaining materials in accordance with all applicable Federal, State, and local laws and regulations. Under no circumstances shall materials be placed in government owned refuse containers located on site. |
| 3.5.3 | The contractor and contractor personnel shall wear proper Personal Protective Equipment (PPE) suitable for protection from the UPS, batteries, and related equipment as noted in this Statement of Work. Both the operator and any test equipment must be isolated from direct contact with earth ground and the UPS chassis frame by standing on rubber mats and wearing insulating shoes and protective eyewear. Some components within the cabinets are not connected to chassis ground. Ensure that the test instrument exterior does not make contact either physically or electrically with earth ground. |
| 3.5.7 | The contractor shall remove and dispose of all batteries and waste materials offsite, in accordance with all applicable Federal, State and local regulations. |
| 3.5.8 | Contractor must follow the Coast Guard Base Seattle’s Integrated Emergency Response Plan and Contingency Plan for all hazardous material spills, fires, or medical emergencies. |
SECTION 4- REFERENCES
| 4.1 | Mandatory Publications: Most recent version of the following standards and codes: | |
| 4.1.1 | DHS MD 11042 Safeguarding Sensitive But Unclassified Material. | |
| 4.1.2 | SILC-CTSO-36-11 31 17 11-04 United States Coast Guard Configuration Standard | Technical Order for Uninterruptible Power Supply Systems |
| 4.1.3 | International Building Code (IBC) Chapter #3, Section [F] 307.1 | |
| 4.1.4 | National Fire Protection Association (NFPA) Codes 30, 70, 110, and 111 | |
| 4.1.5 | International Code Council (ICC) Chapter 12 Energy Systems | |
| 4.1.6 | National Electrical Code (NEC) Article 700 and Article 250 | |
| 4.1.7 | IEC International Electrotechnical Commission (IEC) 60896 | |
| 4.1.8 | Liebert Npower UPS Operation and Maintenance Manual 30-130KVA, 60Hz, Single | Module System. |
| 4.1.9 | Liebert Npower Options Manual 30-130KVA, 60Hz, Single Module System. | |
| 4.1.10 | Liebert Npower UPS Installation Manual 30-130KVA, 60Hz, Single Module System. | |
| 4.1.11 | 29 CFR 1910.120 Hazardous Waste Operations and Emergency Response | |
| 4.1.12 | Commandant Instruction Manual CIM 16478.1 (series), Hazardous Waste Management Manual. | |
| 4.1.13 | BASESEAINST 11350 Hazardous Waste Management Plan. | |
| 4.1.14 | Where equipment or materials are specified to conform to industry and |
technical society reference standards of the organizations such as American National Standards Institute (ANSI), American Society for Testing and Materials (ASTM), National Electrical Manufacturers Association (NEMA), Underwriters Laboratories (UL), and Association of Edison Illuminating Companies (AEIC), submit proof of such compliance. The label or listing by the specified organization will be acceptable evidence of compliance.