Upgrade Generator Control System

Closed Solicitation Posted

Solicitation number
19AU9026Q0015
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
Vienna Wien Austria

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of State seeks upgrade of the generator control system at the U.S. Embassy Vienna, including decommissioning and removal of the existing ACON unit, delivery and installation of a new DSE 8620MKII (or equal) control system, commissioning, testing, and customer training, with quotations due August 6, 2026 at 10:00 a.m. local time. The procurement is unrestricted (no set-aside) and issued as a Request for Quote under RFQ 19AU9026Q0015.

Place of performance is Vienna, Austria. Work must be scheduled for a single weekend between Friday 5:00 p.m. and Sunday 7:00 p.m. in October 2026, with generator downtime kept to a minimum. The contractor must guarantee spare parts availability (software and hardware) for a minimum of 10 years. Work is subject to Austrian technical standards (ONORM B 2110, ETG 1992, OVE/ONORM-E 8101, OVE/ONORM-E 8015-1-3, and DIN/VDI guidelines) and U.S. Government contract law.

The NAICS code is 22112, Electric Power Transmission, Control, and Distribution; PSC is 6110, Electrical Control Equipment. Pricing is in Euros with 20 percent VAT as a separate line item. The pricing structure includes six line items: upgrade lump sum, site installation lump sum, documentation lump sum, skilled worker hourly rate, unskilled worker hourly rate, and materials provision. Contracts exceeding $30,000 (net) require a 20 percent performance bond via bank guarantee.

Offerors must register in SAM prior to submission, provide proof of registration, demonstrate three years of relevant past performance with client references, and submit a strategic plan addressing work execution, equipment identification, quality assurance, and insurance. A mandatory site visit is scheduled July 14, 2026 at 10:00 a.m.; prospective quoters must register by July 10 at 10:00 a.m. Award will be made to the lowest-priced, acceptable, responsible offeror meeting FAR 9.1 standards. Quotations must be submitted in English in MS-Word, MS-Excel, or PDF format with file size not exceeding 30MB.

Notice text

The upgrade of the generator control system consists of, but is not limited to the following:

  • Execution planning
  • Decommissioning, Removal and disposal of existing generator control system
    Disconnection, removal and disposal of existing ACON Generator control system
  • ​​​​​​Delivery, installation and commissioning of new generator control system​​​
    Delivery (HW & SW), installation and connection of new DSE 8620MKII (or equal) control system
    The Contractor guarantees spare parts availability (software and hardware components) for a minimum of 10 years.
    Commissioning, test run
  • Customer training/documentation
     

​​​​​​​​​​​​​​​​​​​​Under the contract the contractor assumes full and unlimited responsibility for the right choice and correct workmanship of flawless material as well as for proper and professional completion.
Regulations/standards incl. electro- technical safety regulations:
ÖNORM B 2110 General terms for construction work
ETG 1992 electrical engineering law
ÖVE/ÖNORM- E 8101
ÖVE/ÖNORM- E 8015-1-3
ÖVE/EN 1
DIN German industrial standards

VDI guidelines

Upgrade MTU 500kVA- Generator Control system- work must be scheduled for a weekend between Fr, 5pm until Su, 7pm. Generator downtime must be always kept to a minimum.

Planned Execution period: Ocotober 2026

Files

File Type Posted
19AU9026Q0015_SF1449.pdf PDF
19AU9026Q0015_Solicitation_doc.pdf PDF
19AU9026Q0015_Coverltr.pdf PDF
19AU9026Q0015_Attachment_A_SOW.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity