Upgrade Environmental Control System (ECS), Launch Complex (LC) 39B

Closed Pre-Solicitation Posted

This opportunity was awarded. See the award notice from , or the latest solicitation from .

Solicitation number
80KSC020R0024
Agency
Kennedy Space Center National Aeronautics and Space Administration
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
238220 Plumbing, Heating, and Air-Conditioning Contractors
PSC
C221 Architect And Engineering- General: Plumbing Systems
Place of performance
FL 32899 USA

Notice details come from SAM.gov. Updated .

About this opportunity

The National Aeronautics and Space Administration Kennedy Space Center plans to issue a Request for Proposal to upgrade the Environmental Control System at Launch Complex 39B. The contractor will be required to replace the existing cooling tower, relocate ductwork and instrumentation, add new heaters and ducts, replace piping and valves, modify controls systems, install new humidifiers, and coordinate other facility modifications. The effort includes two tasks, with Task 1 requiring completion within 180 days post Artemis I and an alternate proposal to complete the work within 150 days. Proposals are due in late June 2020, with a site visit scheduled from late May to mid-June.

The contract is unrestricted and has no set-aside designations. The NAICS code is 236220 for construction of commercial and institutional buildings with a small business size standard of $16.5 million. The total contract value is estimated to be over $10 million.

Notice text

2 versions

Update #2 · Latest ·

Contracting Office Address

NASA/John F. Kennedy Space Center, Procurement, Kennedy Space Center, FL 32899

Description

NASA/John F. Kennedy Space Center plans to issue a Request for Proposal (RFP) for 80KSC020R0024, Upgrade Environmental Control System (ECS) at Launch Complex 39B (LC 39B) at John F. Kennedy Space Center, Florida.

THE CONTRACTOR SHALL PROVIDE THE NECESSARY RESOURCES TO:

Upgrade Environmental Control System (ECS) at Launch Complex 39B (LC 39B) for Artemis II.

A list of tasks associated with the proposed work includes, but is not limited to, the following:

The Upgrades of the Environmental Control System (ECS) at LC 39B.  The upgraded ECS will provide conditioned clean purge air to various compartments of the new Space Launch System (SLS) vehicle.  The scope includes replacement of the existing cooling tower, relocation of existing ductwork, heaters, chambers, and instrumentation, addition of new heaters, chambers and high pressure ducts, replacement of filter housings and valves, revising existing gaseous nitrogen piping including replacement of heritage aluminum gaseous nitrogen piping with stainless steel, modification of existing controls systems hardware utilizing existing Allan Bradley PLC-based controls system architecture, installation of new humidifiers, and incidental related work.

All equipment will be installed at and in the vicinity of KSC Building J7-337 (Launch Pad 39B).  Existing piping and ducts will be replaced and/or relocated, requiring careful removal and demolition.  Electrical equipment supporting the ECS will be modified to accommodate the new equipment.  New ducts will be installed to interface with the Mobile Launcher.

Replacement of the existing cooling tower, demolition of the existing cooling tower, construction of a support frame, procurement of a packaged cooling tower including fill, fans, gear boxes, pumps, valves, piping, access platform, and handrails.

Control System work will require fabrication of system cables that include signal-level I/O and AC and DC distribution and control, and will utilize heavy-duty cables and MIL-SPEC connectors required to meet various KSC and MIL standards.

This facility will be undergoing other construction modifications during the performance of this construction project and close coordination with the Government’s team will be required.

Specifically, this project consists of, but is not limited to:

A.  Upgrade of the LC 39B Environmental Control System.

1.   Replacement of existing cooling tower including replacement of all components.

2.   Fabrication and installation of high pressure (~ 10 psig) air-tight flanged single wall and dual wall ductwork with insulation.

3.   60Hz power modifications to switchgear and motor control centers.

4.   Fabrication of custom heavy duty connector type control cabling and installation between instrumentation / control devices and remote IO and/or power distribution cabinets.

5.   Fabrication and installation of ~150 psig stainless steel gaseous nitrogen piping.

6.   Fabrication and installation of structural steel service platforms.

B.  Contractor will be required to closely coordinate all sub-contractor’s trades and create and maintain a 3-D coordination model to aid in production of shop drawings, placement of equipment and execution of work with the existing and new work.

C.  Contractor will be required to provide testing results of each system (cooling tower performance, ductwork leak and proof tests, maximum system performance requirement test, and operations validation) and provide full support to operate the system for the Government’s witnessed Commissioning including testing.

EDITED**The NAICS code for this procurement is 238220 with a small business size standard of $16.5M.**EDITED

The effort will include the following task and alternate proposal 1 task.

Task 1: Upgrade ECS at LC 39B for Artemis II, 180 day Post Artemis I schedule

Alternate Proposal Task: Upgrade ECS at LC39B for Artemis II, 150 day Post Artemis I schedule

Each task shall be bid separately.  The performance period for both tasks shall complete Pre-Artemis I launch work as defined in the contract drawings and specifications in its entirety prior to March 1, 2021 AND Task 1 shall complete Post-Artemis I launch work as defined in the contract drawings and specifications in its entirety prior to 180 days after the Post Artemis I notice to proceed, OR Alternate Proposal Task shall complete Post-Artemis I launch work as defined in the contract drawings and specifications in its entirety prior to 150 days after the Post Artemis I notice to proceed.

In accordance with Federal Acquisition Regulation 36.204, Disclosure of the Magnitude of Construction Projects, the estimated price range is as follows:

The total cost of the construction contract price is estimated at more than $10,000,000.

The anticipated release date of the RFP is mid to late May 2020 with an anticipated offer closing date of late June 2020.  The firm date for receipt of bids or proposals shall be stated in the RFP.  A site visit will be scheduled late May 2020 to mid-June 2020.  Prime contractors will be limited on the number of personnel in attendance.

Specifications and Drawings have an Export Determination of EAR 99 and are considered controlled documents.  Therefore, download of documents won’t be permitted until requesters have been cleared through Defense Logistics Information Service (DLIS).  Please begin beta.SAM.gov registration immediately since clearance could take a couple of weeks.

One or more of the items under this acquisition is subject to the World Trade Organization Government Procurement Agreement and Free Trade Agreements.

This requirement shall be unrestricted.  All responsible sources may submit a proposal which shall be considered by the agency.

The solicitation and any documents related to this procurement shall be available over the Internet.  These documents will reside on a World-Wide Web (WWW) server, which may be accessed using a WWW browser application.

Prospective offerors are encouraged to register their intent to submit an offer on https://beta.sam.gov.  Search for the solicitation number and then follow the instructions in Beta.SAM.gov to add your name to the Interested Vendor’s List.  It is the offerors responsibility to monitor the Internet site for the release of the solicitation and amendments (if any).  Potential offerors will be responsible for downloading their own copy of the solicitation and amendments (if any).

All contractual and technical questions must be submitted by email to the POC below.  Telephone questions will not be accepted.

Primary Point of Contact:

Name:      C. M. Julius Williams

Title:        Contracting Officer

Phone:      321-861-2661

Fax:          321-867-1141

Email:      christopher.m.williams@nasa.gov

Additional Point of Contact:

Name:      Anthony M. Caruvana

Title:        Contracting Officer

Phone:      321-867-3464

Fax:          321-867-1141

Email:      anthony.m.caruvana@nasa.gov

Update #1 ·

Contracting Office Address

NASA/John F. Kennedy Space Center, Procurement, Kennedy Space Center, FL 32899

Description

NASA/John F. Kennedy Space Center plans to issue a Request for Proposal (RFP) for 80KSC020R0024, Upgrade Environmental Control System (ECS) at Launch Complex 39B (LC 39B) at John F. Kennedy Space Center, Florida.

THE CONTRACTOR SHALL PROVIDE THE NECESSARY RESOURCES TO:

Upgrade Environmental Control System (ECS) at Launch Complex 39B (LC 39B) for Artemis II.

A list of tasks associated with the proposed work includes, but is not limited to, the following:

The Upgrades of the Environmental Control System (ECS) at LC 39B.  The upgraded ECS will provide conditioned clean purge air to various compartments of the new Space Launch System (SLS) vehicle.  The scope includes replacement of the existing cooling tower, relocation of existing ductwork, heaters, chambers, and instrumentation, addition of new heaters, chambers and high pressure ducts, replacement of filter housings and valves, revising existing gaseous nitrogen piping including replacement of heritage aluminum gaseous nitrogen piping with stainless steel, modification of existing controls systems hardware utilizing existing Allan Bradley PLC-based controls system architecture, installation of new humidifiers, and incidental related work.

All equipment will be installed at and in the vicinity of KSC Building J7-337 (Launch Pad 39B).  Existing piping and ducts will be replaced and/or relocated, requiring careful removal and demolition.  Electrical equipment supporting the ECS will be modified to accommodate the new equipment.  New ducts will be installed to interface with the Mobile Launcher.

Replacement of the existing cooling tower, demolition of the existing cooling tower, construction of a support frame, procurement of a packaged cooling tower including fill, fans, gear boxes, pumps, valves, piping, access platform, and handrails.

Control System work will require fabrication of system cables that include signal-level I/O and AC and DC distribution and control, and will utilize heavy-duty cables and MIL-SPEC connectors required to meet various KSC and MIL standards.

This facility will be undergoing other construction modifications during the performance of this construction project and close coordination with the Government’s team will be required.

Specifically, this project consists of, but is not limited to:

A.  Upgrade of the LC 39B Environmental Control System.

1.   Replacement of existing cooling tower including replacement of all components.

2.   Fabrication and installation of high pressure (~ 10 psig) air-tight flanged single wall and dual wall ductwork with insulation.

3.   60Hz power modifications to switchgear and motor control centers.

4.   Fabrication of custom heavy duty connector type control cabling and installation between instrumentation / control devices and remote IO and/or power distribution cabinets.

5.   Fabrication and installation of ~150 psig stainless steel gaseous nitrogen piping.

6.   Fabrication and installation of structural steel service platforms.

B.  Contractor will be required to closely coordinate all sub-contractor’s trades and create and maintain a 3-D coordination model to aid in production of shop drawings, placement of equipment and execution of work with the existing and new work.

C.  Contractor will be required to provide testing results of each system (cooling tower performance, ductwork leak and proof tests, maximum system performance requirement test, and operations validation) and provide full support to operate the system for the Government’s witnessed Commissioning including testing.

The NAICS code for this procurement is 236220 with a small business size standard of $16.5M.

The effort will include the following task and alternate proposal 1 task.

Task 1: Upgrade ECS at LC 39B for Artemis II, 180 day Post Artemis I schedule

Alternate Proposal Task: Upgrade ECS at LC39B for Artemis II, 150 day Post Artemis I schedule

Each task shall be bid separately.  The performance period for both tasks shall complete Pre-Artemis I launch work as defined in the contract drawings and specifications in its entirety prior to March 1, 2021 AND Task 1 shall complete Post-Artemis I launch work as defined in the contract drawings and specifications in its entirety prior to 180 days after the Post Artemis I notice to proceed, OR Alternate Proposal Task shall complete Post-Artemis I launch work as defined in the contract drawings and specifications in its entirety prior to 150 days after the Post Artemis I notice to proceed.

In accordance with Federal Acquisition Regulation 36.204, Disclosure of the Magnitude of Construction Projects, the estimated price range is as follows:

The total cost of the construction contract price is estimated at more than $10,000,000.

The anticipated release date of the RFP is mid to late May 2020 with an anticipated offer closing date of late June 2020.  The firm date for receipt of bids or proposals shall be stated in the RFP.  A site visit will be scheduled late May 2020 to mid-June 2020.  Prime contractors will be limited on the number of personnel in attendance.

Specifications and Drawings have an Export Determination of EAR 99 and are considered controlled documents.  Therefore, download of documents won’t be permitted until requesters have been cleared through Defense Logistics Information Service (DLIS).  Please begin beta.SAM.gov registration immediately since clearance could take a couple of weeks.

One or more of the items under this acquisition is subject to the World Trade Organization Government Procurement Agreement and Free Trade Agreements.

This requirement shall be unrestricted.  All responsible sources may submit a proposal which shall be considered by the agency.

The solicitation and any documents related to this procurement shall be available over the Internet.  These documents will reside on a World-Wide Web (WWW) server, which may be accessed using a WWW browser application.

Prospective offerors are encouraged to register their intent to submit an offer on https://beta.sam.gov.  Search for the solicitation number and then follow the instructions in Beta.SAM.gov to add your name to the Interested Vendor’s List.  It is the offerors responsibility to monitor the Internet site for the release of the solicitation and amendments (if any).  Potential offerors will be responsible for downloading their own copy of the solicitation and amendments (if any).

All contractual and technical questions must be submitted by email to the POC below.  Telephone questions will not be accepted.

Primary Point of Contact:

Name:      C. M. Julius Williams

Title:        Contracting Officer

Phone:      321-861-2661

Fax:          321-867-1141

Email:      christopher.m.williams@nasa.gov

Additional Point of Contact:

Name:      Anthony M. Caruvana

Title:        Contracting Officer

Phone:      321-867-3464

Fax:          321-867-1141

Email:      anthony.m.caruvana@nasa.gov

Attachments

Files attached to this notice, newest first
File Type Posted
80KSC020R0024 Synopsis 39B ECS Rev A.pdf PDF
80KSC020R0024 Synopsis 39B ECS.pdf PDF

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Upgrade Environmental Control System (ECS), Launch Complex (LC) 39B Award Award Notice
Upgrade Environmental Control System (ECS), Launch Complex (LC) 39B Latest solicitation Solicitation
Upgrade Environmental Control System (ECS), Launch Complex (LC) 39B This notice Pre-Solicitation
Upgrade Environmental Control System (ECS), Launch Complex (LC) 39B Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity