Unit Price Contract for Maintenance Dredging of Pensacola Harbor Entrance Channel
Closed Solicitation Posted
- Solicitation number
- W9127826BA003
- Agency
-
ENDIST Mobile
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- PSC
- Y1KF Construction Of Dredging Facilities
- Place of performance
- Pensacola Harbor Entrance Channel, Pensacola, Florida 32506
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers Engineering District Mobile (ENDIST Mobile) canceled its solicitation for a unit price contract for maintenance dredging of the Pensacola Harbor Entrance Channel, which listed a proposal due date of November 3, 2026. Amendment AM05 cancels the solicitation, so this notice describes a canceled requirement. No set-aside was used.
Place of performance is 1205 Via De Luna Dr, Pensacola Beach, FL 32561. Dredged material is to be placed west of the Pensacola Entrance Channel along Perdido Key Beach, with a maximum pumping distance of approximately 30,000-feet. The requirement calls for hydraulic cutterhead pipeline dredges, trailing suction hopper dredges, and/or mechanical dredges with scows capable of dredging to a depth of 39 feet. Offerors must supply a complete operation, including crew, management staff, and support equipment such as tugs and various other floating plants. The expected material is sand typical of Pensacola Entrance Channel maintenance.
The notice carries NAICS 237990, Other Heavy and Civil Engineering Construction, and PSC Y1KF, Construction Of Dredging Facilities. It was posted September 11, 2026. Amendments 0001 (September 29, 2026), 0002 (October 5, 2026), 0003 (October 6, 2026), and 0004 (October 6, 2026) preceded the cancellation. The attached abstract of offers, posted October 15, 2026, records bid opening on October 13, 2026.
Notice text
7 versions
Update #7 · Latest ·
The solicitation is herby canceled via AM05.
Update #6 ·
The requirement will be for hydraulic cutterhead pipeline dredges, trailing suction hopper dredges, and/or mechanical dredges with scows. Dredges must be capable of dredging to a depth of 39 feet and be complete with crew, management staff and support equipment including tugs and various other floating plants as would normally be expected to support a large dredging operation. The material type expected for this requirement will be maintenance material typical for Pensacola Entrance Channel composed of sand. Material dredged will be placed west of the Pensacola Entrance Channel along Perdido Key Beach. The maximum pumping distance for beach placement will be approximately 30,000-feet. Amendment 0001 is posted 29 September 2026. Amendment 0002 is posted 05 October 2026. Amendment 0004 is posted 06 October 2026.
Update #5 ·
The requirement will be for hydraulic cutterhead pipeline dredges, trailing suction hopper dredges, and/or mechanical dredges with scows. Dredges must be capable of dredging to a depth of 39 feet and be complete with crew, management staff and support equipment including tugs and various other floating plants as would normally be expected to support a large dredging operation. The material type expected for this requirement will be maintenance material typical for Pensacola Entrance Channel composed of sand. Material dredged will be placed west of the Pensacola Entrance Channel along Perdido Key Beach. The maximum pumping distance for beach placement will be approximately 30,000-feet. Amendment 0001 is posted 29 September 2026. Amendment 0002 is posted 05 October 2026. Amendment 0004 is posted 06 October 2026.
Update #4 ·
The requirement will be for hydraulic cutterhead pipeline dredges, trailing suction hopper dredges, and/or mechanical dredges with scows. Dredges must be capable of dredging to a depth of 39 feet and be complete with crew, management staff and support equipment including tugs and various other floating plants as would normally be expected to support a large dredging operation. The material type expected for this requirement will be maintenance material typical for Pensacola Entrance Channel composed of sand. Material dredged will be placed west of the Pensacola Entrance Channel along Perdido Key Beach. The maximum pumping distance for beach placement will be approximately 30,000-feet. Amendment 0001 is posted 29 September 2026. Amendment 0002 is posted 05 October 2026. Amendment 0003 is posted 06 October 2026.
Update #3 ·
The requirement will be for hydraulic cutterhead pipeline dredges, trailing suction hopper dredges, and/or mechanical dredges with scows. Dredges must be capable of dredging to a depth of 39 feet and be complete with crew, management staff and support equipment including tugs and various other floating plants as would normally be expected to support a large dredging operation. The material type expected for this requirement will be maintenance material typical for Pensacola Entrance Channel composed of sand. Material dredged will be placed west of the Pensacola Entrance Channel along Perdido Key Beach. The maximum pumping distance for beach placement will be approximately 30,000-feet. Amendment 0001 is posted 29 September 2026. Amendment 0002 is posted 05 October 2026.
Update #2 ·
The requirement will be for hydraulic cutterhead pipeline dredges, trailing suction hopper dredges, and/or mechanical dredges with scows. Dredges must be capable of dredging to a depth of 39 feet and be complete with crew, management staff and support equipment including tugs and various other floating plants as would normally be expected to support a large dredging operation. The material type expected for this requirement will be maintenance material typical for Pensacola Entrance Channel composed of sand. Material dredged will be placed west of the Pensacola Entrance Channel along Perdido Key Beach. The maximum pumping distance for beach placement will be approximately 30,000-feet. Amendment 0001 is posted 29 September 2026.
Update #1 ·
The requirement will be for hydraulic cutterhead pipeline dredges, trailing suction hopper dredges, and/or mechanical dredges with scows. Dredges must be capable of dredging to a depth of 39 feet and be complete with crew, management staff and support equipment including tugs and various other floating plants as would normally be expected to support a large dredging operation. The material type expected for this requirement will be maintenance material typical for Pensacola Entrance Channel composed of sand. Material dredged will be placed west of the Pensacola Entrance Channel along Perdido Key Beach. The maximum pumping distance for beach placement will be approximately 30,000-feet.
Files
| File | Type | Posted |
|---|---|---|
| W9127826BA0003 Abstract.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Solicitation | |
| Unit Price Contract for Maintenance Dredging of Pensacola Harbor Entrance Channel | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Pensacola Harbor Navigation Channel Maintenance Dredging | ENDIST Mobile | No set-aside | |
| Calcasieu Bar River Channel, Pascagoula Harbor, and Panama City Harbor Maintenance Dredging | ENDIST Wilmington | No set-aside | |
| 2027-2029 Maintenance Dredging, Anchorage Harbor, Alaska | ENDIST Alaska | No set-aside | |
| New Orleans Harbor and Various Bar Channels Cutterhead Dredge 3-2025 | ENDIST New Orleans | No set-aside | |
| Mississippi River, New Orleans Harbor and Various Bar Channels Cutterhead Dredge No. 5-2025 | ENDIST New Orleans | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity