Unit Price Contract for Maintenance Dredging of Pensacola Harbor Entrance Channel
Closed Pre-Solicitation Posted
Not the latest version. See the latest solicitation from .
- Solicitation number
- W9127826BA003
- Agency
-
ENDIST Mobile
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- PSC
- Y1KF Construction Of Dredging Facilities
- Place of performance
- Pensacola Harbor Entrance Channel, Pensacola, Florida 32506
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Army Corps of Engineers Engineering District Mobile (ENDIST Mobile) is preparing to solicit a unit price contract for maintenance dredging of Pensacola Harbor Entrance Channel, with a pre-solicitation notice due by August 31, 2026.
The requirement specifies hydraulic cutterhead pipeline dredges, trailing suction hopper dredges, and/or mechanical dredges with scows, all capable of dredging to a depth of 39 feet and equipped with crew, management staff, and support equipment including tugs and floating plants typical of large dredging operations. The material type is maintenance material composed of sand characteristic of the Pensacola Entrance Channel. Dredged material will be placed west of the Pensacola Entrance Channel along Perdido Key Beach, with a maximum pumping distance for beach placement of approximately 30,000 feet. This procurement carries no set-aside.
Notice text
The requirement will be for hydraulic cutterhead pipeline dredges, trailing suction hopper dredges, and/or mechanical dredges with scows. Dredges must be capable of dredging to a depth of 39 feet and be complete with crew, management staff and support equipment including tugs and various other floating plants as would normally be expected to support a large dredging operation. The material type expected for this requirement will be maintenance material typical for Pensacola Entrance Channel composed of sand. Material dredged will be placed west of the Pensacola Entrance Channel along Perdido Key Beach. The maximum pumping distance for beach placement will be approximately 30,000-feet.
Notice history
| Notice | Type | Posted |
|---|---|---|
| Unit Price Contract for Maintenance Dredging of Pensacola Harbor Entrance Channel | Solicitation | |
| This notice | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Pensacola Harbor Navigation Channel Maintenance Dredging | ENDIST Mobile | No set-aside | |
| Calcasieu Bar River Channel, Pascagoula Harbor, and Panama City Harbor Maintenance Dredging | ENDIST Wilmington | No set-aside | |
| New Orleans Harbor and Various Bar Channels Cutterhead Dredge 3-2025 | ENDIST New Orleans | No set-aside | |
| Mississippi River, New Orleans Harbor and Various Bar Channels Cutterhead Dredge No. 5-2025 | ENDIST New Orleans | No set-aside | |
| USACE Enterprise Dredge Delivery Center Scope Dredge to Budget Contract | ENDIST Wilmington | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity