Underground Storage Tank (UST) Removal at Stockton Lake Project, Stockton, MO

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
W912DQ25Q1007
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
562910 Remediation Services
Place of performance
Stockton, Missouri 65785, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The U.S. Army Corps of Engineers, Kansas City District, is seeking a small business contractor to complete the comprehensive removal of two underground storage tanks (USTs) at the Stockton Lake Project in Stockton, Missouri. The solicitation (W912DQ25Q1007) requires the complete removal of one 1,500-gallon and one 1,000-gallon UST, including all associated connections, concrete, piping, equipment, and monitoring systems. Contractors must terminate and make safe all connections, remove and dispose of tanks and ancillary equipment, conduct laboratory testing, and provide required regulatory reports. Evaluation will likely focus on past performance, related experience, and technical capabilities as demonstrated through the Vendor Information Sheet and Related Experience Form. Key dates include a site visit period, questions deadline of December 15, 2024, and proposal submission deadline of December 20, 2024.

The contract is set aside exclusively for small businesses under NAICS code 562910 (Remediation Services), with work to be completed within 120 days of contract award. The place of performance is located at 16435 E Stockton Lake Dr, Stockton, MO 65785, with the project site having approximately 43 feet of equipment access width. An optional Contract Line Item (CLIN 0002) has been added for potential petroleum contaminated soil activities, allowing for up to 5 cubic yards of soil removal if contamination exceeds regulatory thresholds. The government will provide backfill material and handle future site resurfacing, while the contractor is responsible for all equipment, labor, and waste disposal. Contractors must submit a Closure Report to the Missouri Department of Natural Resources within 60 days of project completion, with work to be performed during standard hours of 7:00 AM - 4:00 PM, Monday through Friday.

Notice text

5 versions

Update #5 · Latest ·

Amendment 02 - an amendment has been made to add an option CLIN 0002 and supplementary bid schedule to the solicitation. Please include the supplementary bid schedule with your quote for CLIN 0001 and CLIN 0002. The amended solicitation document is included in the attachments. Questions and Answers number 3 has also been included in the attached documents.

Update #4 ·

Amendment 01 - an amendment has been made to the Performance Work Statement (PWS) in Section C of the solicitation. Please see the attached Solicitation Amendment document.

Two Q&A Documents have also been attached. 

The complete removal of one (1) 1500 gallon and one (1) 1000 gallon Underground Storage Tanks (USTs), to terminate and make safe all associated connections, the removal of concrete, piping, ancillary equipment, dispensing pumps, vent pipes, 250i Interstitial Tank Veeder-Root monitoring system (if still in place), control console, the plugging of all lines going to and from the tanks, the proper removal all remaining product in tanks, the cleaning and disposal of tanks, laboratory testing, providing reports required by regulatory agencies, the disposal of waste materials or any contaminants to the requirements of State and Federal Regulations. The asphalt edge adjacent to the concrete shall be saw cut to create a linear smooth edge. Contractor is responsible for any damage caused during removal. The hole from the tanks will be secured and left open until satisfactory sample results have come back. Contractor will backfill and compact the disturbed area. All work areas must be left clean free of debris when complete. See solicitation document Section C, Performance Work Statement (PWS) for all specifications.

See Section L for Submission instructions and site visit information.B.08.03 Questions and Answers #1 has been added to attachments.

Update #3 ·

The complete removal of one (1) 1500 gallon and one (1) 1000 gallon Underground Storage Tanks (USTs), to terminate and make safe all associated connections, the removal of concrete, piping, ancillary equipment, dispensing pumps, vent pipes, 250i Interstitial Tank Veeder-Root monitoring system (if still in place), control console, the plugging of all lines going to and from the tanks, the proper removal all remaining product in tanks, the cleaning and disposal of tanks, laboratory testing, providing reports required by regulatory agencies, the disposal of waste materials or any contaminants to the requirements of State and Federal Regulations. The asphalt edge adjacent to the concrete shall be saw cut to create a linear smooth edge. Contractor is responsible for any damage caused during removal. The hole from the tanks will be secured and left open until satisfactory sample results have come back. Contractor will backfill and compact the disturbed area. All work areas must be left clean free of debris when complete. See solicitation document Section C, Performance Work Statement (PWS) for all specifications. See Section L for Submission instructions and site visit information.

B.08.03 Questions and Answers #1 has been added to attachments.

Update #2 ·

The US Army Corps of Engineers Kansas City District is in need of the following:

The complete removal of one (1) 1500 gallon and one (1) 1000 gallon Underground Storage Tanks (USTs), to terminate and make safe all associated connections, the removal of concrete, piping, ancillary equipment, dispensing pumps, vent pipes, 250i Interstitial Tank Veeder-Root monitoring system (if still in place), control console, the plugging of all lines going to and from the tanks, the proper removal all remaining product in tanks, the cleaning and disposal of tanks, laboratory testing, providing reports required by regulatory agencies, the disposal of waste materials or any contaminants to the requirements of State and Federal Regulations. The asphalt edge adjacent to the concrete shall be saw cut to create a linear smooth edge. Contractor is responsible for any damage caused during removal. The hole from the tanks will be secured and left open until satisfactory sample results have come back. Contractor will backfill and compact the disturbed area. All work areas must be left clean free of debris when complete. See solicitation document Section C, Performance Work Statement (PWS) for all specifications.

See Section L for Submission instructions and site visit information.

Update #1 ·

The complete removal of one (1) 1500 gallon and one (1) 1000 gallon Underground Storage Tanks (USTs), to terminate and make safe all associated connections, the removal of concrete, piping, ancillary equipment, dispensing pumps, vent pipes, 250i Interstitial Tank Veeder-Root monitoring system (if still in place), control console, the plugging of all lines going to and from the tanks, the proper removal all remaining product in tanks, the cleaning and disposal of tanks, laboratory testing, providing reports required by regulatory agencies, the disposal of waste materials or any contaminants to the requirements of State and Federal Regulations. The asphalt edge adjacent to the concrete shall be saw cut to create a linear smooth edge. Contractor is responsible for any damage caused during removal. The hole from the tanks will be secured and left open until satisfactory sample results have come back. Contractor will backfill and compact the disturbed area. All work areas must be left clean free of debris when complete. See solicitation document Section C, Performance Work Statement (PWS) for all specifications. See Section L for Submission instructions and site visit information.

Files

Show all 11

Notice history

Notice Type Posted
Underground Storage Tank (UST) Removal at Stockton Lake Project, Stockton, MO Award Award Notice
This notice Latest solicitation Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Fort Leavenworth Underground Fuel Tank Testing and Repair Services Fort Leavenworth, Kansas 66027, United States · NAICS 541620 MICC Fort Eustis Total Small Business
J091--Underground Storage Tanks - STC Department of Veterans Affairs St. Cloud VA health Care System St. Cloud, Minnesota 56303, United States · NAICS 811310 Veterans Integrated Service Network 23 No set-aside
Nelson Drive Fuel Tank Removal Jackson, Wyoming, United States · NAICS 237120 Forest Service Total Small Business
Watervliet Arsenal (WVA) Building 152 (B152) Underground Storage Tank (UST) Removal and Replacement 12189 · NAICS 562910 ACC Warren Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors