TUIN 231534, Rehabilitate George Washington Carver Museum

Pre-Solicitation Posted

Not the latest version. See the latest solicitation from .

Solicitation number
140P2023R0029
Agency
Responses due
Not on record
Set-aside
No set-aside

Opportunity facts

Place of performance
Tuskegee, Alabama, United States

Notice details come from SAM.gov. Updated .

Notice text

Rehabilitate the George Washington Carver Museum, a 14,528 ft² one-story (with basement) brick building located in the Tuskegee Institute campus National Historic Landmark District. It was originally constructed to serve as the campus laundry between 1914 and 1916 by student labor with local materials. Beginning in 1936 Tuskegee Institute modified the building to accommodate Carver's laboratory on the ground floor and part of the main floor; the majority of the main floor became a museum, dedicated in 1941.
Rehabilitation of the historic building housing the Carver Museum and other office and building space.
Responsibility for, and subcontractor management of, the subcontractor selected for packing, transport, storage, and re-installation of museum collections (artifacts handling).
Work will be ongoing at an active college campus.
Subcontracting trades includes most major trades such as electrical, masonry, HVAC and roofing.

Files

File Type Posted
B01_Synopsis_PreSolitNotice_TUIN_231534_J_A_1.pdf PDF

Notice history

Notice Type Posted
TUIN 231534, Rehabilitate George Washington Carver Latest solicitation Solicitation
This notice Original Pre-Solicitation

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors