Travis AFB, CA - Entry Control System Replacement

Closed Solicitation Posted

Solicitation number
FA442724Q0147
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
Travis AFB, California 94535, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of the Air Force Air Mobility Command has issued a Solicitation to replace the inoperable Entry Control System for building P1 at Travis Air Force Base in California. The existing system, which secures the Integrated Deployment and Readiness Cell, Deployment Control Center, and Individual Protection Equipment facility, requires a new computer server and software. The contractor shall provide all services necessary to install an economically efficient system that only accepts the Common Access Card and supports a minimum of 100 users. Quotes will be evaluated based on price and technical capability, and the government will award the firm-fixed price contract to the most advantageous offeror.

This Solicitation is set aside for 100% small business. No information is provided on potential incumbents or the contract's value. The Statement of Work indicates the contractor shall use the existing infrastructure if possible and may need to replace the current Bridgepoint card readers. The work shall be performed at Travis AFB, CA, with a period of performance of 30 days after a 60-day mobilization period.

Notice text

3 versions

Update #3 · Latest ·

Amendment 02 - 29-August-2024

The purpose of this Amendment is to add the questions and answers collected over the the RFQ period, provide pictures of a keypad and the inside of a control Control Panel/Box, and extend the response deadline.

★☆UPDATE☆★

Please review the attachments for the Q&A, a picture of access hardware, and a picture of the inside of a Control Panel.

The closing date of this RFQ will be changed from 1200 (noon) on 30-August-2024 to noon on Wednesday, 4-September-2024

Amendment 01 - 20-August-2024

The purpose of this amendment is to announce the date and time for a Site Visit for the Entry Control Replacement requirement.

★☆UPDATE☆★

A Site Visit will be held at buildig P1 on Travis Air Force Base, CA on Monday, 26-Aug-24 at 0900.

Please send an email to akeim.griffiths@us.af.mil and CC vitaliy.kim.1@us.af.mil by COB Friday, 23-Aug-24 with the Name, Number, and company affiliation for representatives attending the meeting. 

Please have representatives arrive by 0830 at the Travis AFB Visitor Center (Air Base Pkwy, Travis AFB, CA 94535), to get base access passes. They should have 2 forms of identification (a Real ID preferred).

The 60th Communications Squadron at Travis AFB, CA. has a requirement for the replacement of the Entry Control System for building P1.  The existing Entry Control System is inoperable and requires a new computer server and software. The Entry Control System is required to properly secure building P1 which is the facility for the Integrated Deployment and Readiness Cell (IDRC), Deployment Control Center (DCC), and Individual Protection Equipment (IPE).  

Please see attached Statement of Work for further details. 

Update #2 ·

Amendment 01 - 20-August-2024

The purpose of this amendment is to announce the date and time for a Site Visit for the Entry Control Replacement requirement.

★☆UPDATE☆★

A Site Visit will be held at buildig P1 on Travis Air Force Base, CA on Monday, 26-Aug-24 at 0900.

Please send an email to akeim.griffiths@us.af.mil and CC vitaliy.kim.1@us.af.mil by COB Friday, 23-Aug-24 with the Name, Number, and company affiliation for representatives attending the meeting. 

Please have representatives arrive by 0830 at the Travis AFB Visitor Center (Air Base Pkwy, Travis AFB, CA 94535), to get base access passes. They should have 2 forms of identification (a Real ID preferred).

The 60th Communications Squadron at Travis AFB, CA. has a requirement for the replacement of the Entry Control System for building P1.  The existing Entry Control System is inoperable and requires a new computer server and software. The Entry Control System is required to properly secure building P1 which is the facility for the Integrated Deployment and Readiness Cell (IDRC), Deployment Control Center (DCC), and Individual Protection Equipment (IPE).  

Please see attached Statement of Work for further details. 

Update #1 ·

The 60th Communications Squadron at Travis AFB, CA. has a requirement for the replacement of the Entry Control System for building P1.  The existing Entry Control System is inoperable and requires a new computer server and software. The Entry Control System is required to properly secure building P1 which is the facility for the Integrated Deployment and Readiness Cell (IDRC), Deployment Control Center (DCC), and Individual Protection Equipment (IPE).  

Please see attached Statement of Work for further details. 

Files

Notice history

Notice Type Posted
This notice Latest solicitation Solicitation
Travis AFB, CA - Entry Control System Replacement - RFI Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Mechanized Material Handling System at Travis AFB, California 60 APS/TRO Building 968Travis AFB, CA 94535 · NAICS 333922 AFLCMC Wright Patterson AFB No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity